Text
~
pa af og%
r 5 'j,, ( l i
~1 UNITED STATES
' C[ [' I NUCLEAR REGULATORY COMMISSION f
5, WASHINGTON, D.C. 20555-0001 DUOVESNE LIGHT COMPANY OHIO EDISON COMPANY THE CLEVELAND ELECTRIC ILLUMINATING COMPANY THE TOLEDO EDISON COMPANY DOCKET NO. 50-412 BEAVER VALLEY POWER STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 53 License No. NPF-73 i
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Duquesne Light Company, et al. (the licensee) dated October 1,1990, as supplemented May 28 and December 30, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; i
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common-defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
P 4
93o90303Og $ h 12 PDR ADOC PDR P
i 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-73 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 53, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. DLC0 shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION l
l /2 !
1 L
Walter R. Butler, Director Project Directorate I-3 4
Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
Attachment:
Ct'anges to the Technical i
Specifications Date of Issuance:
July 13,1993
-l
)
1
t ATTACHMENT TO LICENSE AMENDMENT NO. 63 FACILITY OPERATING LICENSE NO. NPF-73 DOCKET NO. 50-412 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 3/4 3-74 3/4 3-74 3/4 3-75 t
i I
l i
l
NPF-73 INSTRUMENTATION TURBINE OVERSPEED PROTECTION LIMITING CONDITION FOR OPERATION 3.3.4 At least one Turbine Overspeed Protection System shall be OPERABLE.
APPLICABILITY:
MODES 1, 2*,
and 3".
ACTION:
l a.
With one throttle valve or one governor valve per high pressure turbine steam line inoperable and/or with one reheat stop valve or one reheat intercept valve per low pressure turbine steam line inoperable, restore the inoperable valve (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or i
close at least one valve in the affected steam line(s) or isolate the turbine from the steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With the above required Turbine Overspeed Protection System otherwise inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate the turbine i
from the steam supply.
c.
The provisions of Specification 3.0.4 are not applicable.
SURVEILLANCE REQUIREMENTS 4.3.4.1 The provisions of Specification 4.0.4 are not applicable.
4.3.4.2 The above required Turbine Overspeed Protection System shall be demonstrated OPERABLE:
I a.
By cycling each of the following valves through at least one complete cycle from the running position:
1)
Four high pressure turbine throttle valves at least i
once per 31 days, 2)
Four high pressure turbine governor valves at least once per 31 days, 3)
Four low pressure turbine reheat stop valves at least i
c once per 18 raonths, 4)
Four low pressure turbine 12 heat intercept valves at least once per 18 months,
- Specification not applicable with all main steam isolation valves and associated bypass valves in the closed position and all other steam flow paths to the turbine isolated.
BEAVER VALLEY - UNIT 2 3/4 3-74 Amendment No. 53
NPF-73 INSTRUMENTATION SURVEILLANCE REQUIREMENTS (Continued) b.
By direct observation of the movement of each of the following valves through one complete cycle from the running position:
1)
Four high pressure turbine throttle valves at least once per 31 days, 2)
Four high pressure turbine governor valves at least once per 31 days, 3)
Four low pressure turbine reheat stop valves at least once per 18 months, 4)
Four low pressure turbine reheat intercept valves at least once per 18 months, l
c.
At least once per 18 months by performing a CHANNEL CALIBRATION'on the turbine overspeed protection systems, i
and
]
d.
At least once per 40 months by disassembling at least one i
of each of the above valves and performing a visual and surface inspection of valve seats,
- disks, and stems and verifying no unacceptable flaws or excessive corrosion. If j
unacceptable flaws or excessive corrosion are found, all other valves of that type shall be inspected unless the nature of the problem can be directly attributed to a-service condition specific to that valve.
For reheat stop and intercept valves the inspection cycle may be increased to a r.aximum of 60 months, provided there is no indication of operational distress.
i j
BEAVER VALLEY - UNIT 2 3/4 3-75 Amendment No.53
-,,