Forwards Safety Insp Rept 50-271/93-13 on 930523-0626. Violation Noted
ML20056C968
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/22/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20056C970 List:
References
NUDOCS 9307300168
Download: ML20056C968 (3)


See also: IR 05000271/1993013

Text

.. . _ _ _ __ _ ___

_ _ _ ._ _ _

'E' ~f

~ .,

.

.

.

-l

l

JUL 2 21993 l i

Docket No. 50-271 l

l

Mr. Donald Reid l

Vice President, Operations _;

Vermont Yankee Nuclear Power Corporation

RD 5, Box 169 i

Ferry Road I

Brattleboro, Vermont 05301

l

Dear Mr. Reid:  ;

-

i

SUBJECT: NOTICE OF VIOLATION (VERMONT YANKEE INSPECTION 93-13) )

i

This refers to the safety inspection conducted by Messrs. H. Eichenholz and P. Harris on ]'

May 23 - June 26,1993, at the Vermont Yankee Nuclear Power Station, Vernon, Vermont.

The preliminary results were discussed with Mr. R. Wanczyk at the conclusion of the

inspection. The inspection focused on issues important to public health and safety, and

consisted of performance observations of the conduct of operations and maintenance, and

independent evaluation of safety system status and quality records.

Our observations this period were that the plant was operated safely. Corrective actions for

a leak rate test deficiency of containment sampling piping were effective and enforcement

discretion was therefore exercised. However, your failure to properly calibrate the core

spray sparger differential pressure instruments resulted in a violation of Technical

Specification requirements, as specified in the enclosed Notice of Violation. We are

concerned that this finding exhibited weaknesses with your assessment of industry experience

and biennial procedure reviews, which represented missed opportunities since 1979 to

identify the problem, Nonetheless, we do acknowledge the excellent performmce on the part

of an Auxiliary Operator whose questioning attitude identified this condition, and we

encourage your actions to continue to identify and correct such problems.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter

and the enclosed Notice will be placed in the NRC Public Document Room. You are

reo,uired to respond to this letter and should follow the instructions specified in the enclosed

Notice. The responses directed by this letter and the enclosed Notice are not subject to the l

clearance procedures of the Office of Management and Budget as required by the Paperwork l

Reduction Act of 1980, Public Law No. 96.511. l

l

l

-i

'l

I

i

2900C OFFICIAL RECORD COPY I

9307300168

DR

9307pp m.

ADOCK 05000271 dl Mt ,~

PDR E

. . . . . . .

E

~

.-  ; ,

.

'

dl. 2 21993

Mr. Donald Reid 2  ;

Your cooperation with us is appreciated.

.

Sincerely, l

lGINAL SIGNED BY: j.

/

// ;

' 3

James C. Linville, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report 50-271/93-13 ,

I

cc w/encls: l

R. Wanczyk, Plant Manager i

J. Thayer, Vice President, Yankee Atomic Electric Company

L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.  !

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire 1

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts )

R. Gad, Esquire  ;

G. Bisbee, Esquire

R. Sedano, Vermont Department of Public Service

i

T. Rapone, Massachusetts Executive Office of Public Safety

Public Document Room (PDR)

Local Puolic Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2 copies)

NRC Resident Inspector

State of New Hampshire, SLO Designee

State of Vermont, SLO Designee

Commonwealth of Massachusetts, SLO Designee

_ . _ . _

.. .-

.-

,

.

Mr. Donald Reid 3

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Reactor Systems Branch, NRR, 8E23 (Section 2.4 and 6.2)

G. Kelly, DRP

bec w/enci (VIA F MAIL):

V. McCree, OEDO  ;

D. Dorman, NRR  :

W. Butler, NRR

!

l

f

!

!

!

F

1

1

RI:DRP RI:DRP RI:DRP

Eichenholz/meo

h (n.

Kelly

'i:7

Li il

7/20/93 1 '2lk.3

i

OFFICIAL RECORD COPY

A:VY9313.MEO

l

_ _ _ _ _ ._

I