ML20056C853

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-073/93-01 on 930602-07.No Violations Noted
ML20056C853
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 06/18/1993
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Stimmell G
GENERAL ELECTRIC CO.
Shared Package
ML20056C854 List:
References
NUDOCS 9307260031
Download: ML20056C853 (3)


See also: IR 05000073/1993001

Text

4-

n :t w t n m ~ ,r g ::tc u ,7;g a n1 w g

i.. R ':liOWhiiGB

UNITED STATES

f" %

NUCLEAR REGULATORY COMMISSION

t

.M

)

REGION V

([$

3 .t.

  • t

c

1450 MARIA LANE

DY

-g#

WALNUT CREEK CAUFORNIA 94596-5368

s

% ,,

8

JUN 15 f%7

Docket No.50-073

<

General Electric Company

Vallecitos Nuclear Center

P. O. Box 460

Pleasanton, California 94566

Attention: Mr. Gary L. Stimmell

Manager, Irradiation Processing Operation

NRC INSPECTION OF GE NUCLEAR TEST REACTOR

Subject:

This letter refers to an announced, routine inspection of your activities

authorized by NRC License No. R-33.

The inspection was conducted by L.

Norderhaug of this office on June 2 - 7, 1993. This letter also refers to. the

discussion of the preliminary inspection findings with--you and your staff on

Further, this letter refers to subsequent in-office review of:

June 7, 1993.

documentation provided during the inspection visit regarding items of

inspection interest and to a followup conversation between D. Smith of your

staff and L. Norderhaug on June 18, 1993.

,

Areas examined during this inspection visit are described in the enclosed

inspection reports (Enclosure A -- reactor operations and Enclosure B -

Within these

physical protection, and material control and accounting). area

representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspec. tion, no violations -or deviations were

identified.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal-Regulations, documentation of the findings of your

programs and procedures for safeguarding special nuclear material are exempt -

from public disclosure; therefore, Enclosure B will not be placed in the NRC

Public Document Room.

However, in accordance with 10 CFR 2.790(a), a copy of this letter and

Enclosure A will be placed in the NRC Public Document Room.

9307260031 930618"

{DR

ADDCK 05000073

PDR

ELTTJ'J1 TFMSV!TED !!EP V@l CORTfRG

UE]lNf01!All0S

lfWI

v

._

m,

'!

"

t'f1ERl!11RM4?MITTED !!EREWITH CON!fd!!S

77.% iNFOR!!AilCN

.

4

,

2-

,

-;

Should you~have any questions concerning this letter, we~would be pleased to

' discuss them with.you.

Sincerely,

!

'

'

-

. 7

.;

Robert J. Pate, Chief

_

.:

Safeguards, Emergency Preparedness and

!

Non-Power Reactor Branch

l

Enclosures:

A.

Inspection Report No.

50-073/93-01

B.

Inspection Report No.

50-073/93-02 & 50-073/93-03

i

cc w/ enclosures:

.

_

Mr. James L. Nixon, Specialist, Safeguards

Vallecitos Nuclear Center

. ;

Mr. James _L. Caldwell, NRR/HOLB

Dr. William Vernetson, Director of Nuclear Facilities

,

University of Florida

'

.>

i

,

t

-

i

.

l

,

.

t

k

.

.

$

h,

ll b

"

l

  • *

.

,

-

,c.

[

~

i

. --

-

t

>

,JUN' I 81993

-bec w/ enclosures:

Docket File

B. Faulkenberry

T. Sherr, Chief, SGDB-NMSS

bec w/o enclosure B:

G. Cook

Inspection File

M. Smith

J. Zollicoffer

REGION V/

/

,.

LNorderhaug

RPat

06//g93

06//8 /93

iS)T COPY]

REQUESTA)PT]

JENDTODCS]

SENil TO PDR]

l

ES-J N0 1

YES // NO ) 1

/ YES) / N0 1

8ES)/ N0 1

Yxde wo

.

.

4

2

-

- . .

.

-1

IEoY

,