Forwards Revised SSAR Markup for Dfser COL Action Item 1.2.1-1,replacing Licensee Ltr for Item
ML20056C540
Person / Time
Site: 05200001
Issue date: 06/14/1993
From: Fox J
GENERAL ELECTRIC CO.
To: Poslusny C
Office of Nuclear Reactor Regulation
References
NUDOCS 9306240453
Download: ML20056C540 (3)


Text

4 GENuclear Energy CenearlElectnc Company 115 Cunner Avenue S;rn Jose. CA 95125 June 14,1993 Docket No. STN 52-001 Chet Posiusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of the Nuclear Reactor Regulation

Subject:

Submittal Supporting Accelerated ABWR Schedule - DFSER COL Action Item 1.2.1-1

Dear Chet:

Enclosed is a revised SSAR markup for DFSER COL Action Item 1.2.1-1. This letter replaces my letter dated April 30,1993 for this item.

Please provide a copy of this transmittal to Jerry Wilson.

Sincerely, b

Jack Fox Advanced Reactor Programs cc: Alan Beard (GE)

Norman Fletcher (DOE)

Joe Quirk (GE) z20uta q g nn, 60 9306240453 930614 p

\\j PDR ADDCK05200001}A-A' ppa

'M M 23A6100AC Standard Plant asxx 5

1.1 INTRODUCTION

1.1./ Type of License Required 1.1.1 Forn.at and Content This ABWR SSAR is submitted in :upport of the application for final design approval (FDA)

The Advanced Boiling Water Reactor Standard and design certification (DC) for the ABWR Safety Analysis Report (ABWR SSAR), is written in Standard Plant.

accordance with Regulatory Guide 1.70. For 6

consistency with NUREG 0800, the ABWR SSAR 1.15 Number of Plant Units includes Section 15.8 which addresses anticipated transients without scram and Chapter 18 which For the purpose of this document, only a addresses human factors. In addition, response to single standard plant will be considered.

TMI related matters is presented in Appendix 1A.

7 1.1.f Description of Location The response to severe accident policy statement is provided in Chapter 19. Chapter 20 is This plant can be constructed at any location included to provide a question and response guide.

which meets the parameters identified in Chapter 2.

1.1.2 ABWR Standard Plant Scope B

1.1J/ Type of Nuclear Steam Supply The ABWR Standard Plant includes all buildings which are dedicated exclusively or primarily This plant will have a boiling water reactor to housing systems and the equipment related to the nuclear steam supply system designed and supplied nuclear system or controls access to this equipment by GE and designated as ABWR.

and systems. There are five such buildings within the scope of the ABWR Standard Plant. These are:

1.1 Type of Containment (1) Reactor building (including containment);

The ABWR will have a low-leakage containment vessel which comprises the drywell and pressure (2) Service building; suppression chamber. The containment vesselis a cylindrical steellined reinforced concrete structure (3) Controlbuilding; integrated with the reactor building. The i

containment nomenclature is specified in Figure i

(4) Turbine building; and 1.11.

0 (5) Radwaste building.

1.1 Core Thermal Power I.evels The information presented in this ABWR SSAR pertains to one reactor unit with a rated power level of 3926 MWt and a design power level of In addition to these buildings and their 4005MWt. The station utilizes a single cycle, contents, the ABWR Standard Plant provides the forced-circulation, boiling water reactor (BWR).

supporting facilities shown in Figure 1.2-1.

The heat balance for rated power is shown in Figure 1.12. The station is designed to operate at 1.1.3 Engineering Documentation a gross electrical power output of approximately 1356 MWe and net electrical power output of Engineering documentation for the ABWR approximsely 1300 MWe.

Standard Plant is listed on Master Parts List (MPL)

No.18NS07A03*. This MPL is a controlled list,

> ' N 8 URT S structured by system, that contains the identification of hardware and software documentation that defines the ABWR Standard Plant.

IN S 6 ft T A

  • GE Proprietary 1.11 Amendment 9

i.

v.,

TNsEPT A 1.1.4 Design Process GE and its associates control the review and approval of ABWR Common Engineering. design documents with a procedure using the Engineering Review Memorandum (ERM).

Evidence of design verification is entered into the design records of the responsible design organization.%ngineering documents prepared uniquely by GE for the U.S. ABWR, changes to engineering documents are entered into the GE design record files.

A COL applicant will establish the design, including the supporting detailed design documentation, consistent with the design conyt Yol document referenced in the certified ' design ' rule.

See Subsection 1.1.11.1 for COL license information requirements.

t rJ sso-1.1.11 COL License Information 1.1.11.1 Design Process to Establish Detailed Design Documentation The COL applicant will provide the design process required to establish the detailed design documentation. (See Subsection 1.1.4) h

..