ML20056B714

From kanterella
Jump to navigation Jump to search
Ro:On 720115,diesel Generator 12 Failed to Start During Periodic Surveillance Test.Stop Solenoid Adjusted
ML20056B714
Person / Time
Site: Monticello 
Issue date: 01/25/1972
From: Mayer L
NORTHERN STATES POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 9102080413
Download: ML20056B714 (1)


Text

MSP

~

~

Flie Cy.

R e~t te -*

NORTHERN STATES POWER COMPANY w N N E APOU S. MIN N h SOTA 35401 f

p 9A '$

QS.;>

jl g$,

5 January 25, 1972 l

^ L9' NAf 'll

v. &.3

/

Dr. Peter A lbrris, Director g

4 Division of Reactor Licensing j

United States Atomic Energy Commission N

Washington, D C 20543

Dear Dr. lbrris:

MONTICELLO NUCLEAR GENEFlATING PIANf Docket No. 50-263 License No. DPR-22 l

Reporting of Failure of Diesel % erator to Start A condition occurred at the }bnticello Nuclear aenerating Plant recently which we are reporting ic your office in accordance with provisions of Section 6.6.B.2 of Appendix A, Technical Specifications, of the Provi-sional Operating License DPR-22.

The Region III Compliance office has been notified of the occurrence.

On January 15, 1972, when the reactor was in a cold shutdown condition, Ii the No.12 Diesel Generator failed to start during a periodic surveil-lance test.

The dhsel control system is designed such that it idles for 11 minutes after receiving a stop signal.

The stop solenoid then holds the fuel injection cam closed for 3 minutes while the diesel coasts i

down. Accumulators are provided to move the cam to the open position after the 3-minute interval in preparation for the next start.

In the investigation following the failure to start, it was found that the stop l

solenoid held the fuel injection can closed (against the force of the accumulators) during the atte=pt to start the diesel.

The stop solenoid was adjusted so that it would perform its function to stop the diesel j

and yet allow the accumulators to open the fuel injection cam.

The die-cel was started a number of times after this adjustment; it performed satisfactorily each time. An administrative contzol has been added re-quiring that each time a diesel generator is operated, an operator vill verify that the fuel injection cam has returned to the proper position.

A Significant Operating Event report will be available on site for the Compliance Inspector.

Yours very traly, 9

p q

/

h.

DOCKETED 0-USALC L 0 Mayer,P.E.

2 L'

l' Director-Nuc1c - Support Services L-JAN 2 51972 " d RtcutrcRY - h i

LOM/br URL SIUTCN Ag

((Q OJ DOCKP CLERK s

N 9102000413 720125 4

9 CF ADOCK 05000263 66 S

CF_t..

_