1 B.
OPERATING DATA REPORT DOCKET NO.:
50-457 UNIT:
Braidwood 2 DATE: 07/17/90 COMPILED BY:
K. M. Dundek TELEPHONE:
(815)458-2801 ext. 2480 OPERATING STATUS 1.
Reporting Period: June, 1990 Gross Hours:
720 2.
Currently Authorized Power Level (MHt):
3411 Design Electrical Rating (MHe-gross):
1175 Design Electrical Rating (MHe-net):
1120 Max Dependable Capacity (MHe-gross):
1175 Max Dependable Capacity (HWe-net):
1120 3.
Power level to which restricted (If Any):
None 4.
Reasons for restriction (If Any):
None THIS MONTH YR TO DATE CUMULATIVE 5.
Report period Hours:
720 4343 14914 6.
Hours Reactor Critical:
552.9 2487 2 11622.5 2
7.
RX Reserve Shutdown Hours:
0.0 0.0 0.0 8.
Hours Generator on Line:
572.1 2433.4 11494.2 l 9.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0-10.
Gross Thermal Energy (MHH):
1472014 5307625 31148583 11.
Gross Elec. Energy (MHH):
500742 1765401 10656789 12.
Net Elec. Energy (MHH):
474568 1649312 10142287
-13.
Reactor Service factor:
76.8 57.3-77.9 14.
Reactor Availability Factor:
76.8 57.3 77.9 15.
Unit Service Factor:
76.1 55.5 76.9 16.
Unit Availability Factor:
76.1 55.5 76.9 17.
Unit Capacity Factor (MDC net):
58.9 33.9 60.7 y
18.
Unit Capacity Factor (DER net):
58.9 33.9 60.7 19.
Unit Forced Outage Rate:
20.5 5.7 L.1 l 20.
Unit Forced Outage Hours:
147.9 147.9 613.6 l 21.
Shutdowns Scheduled Over Next 6 Months: None 22.
If Shutdown at End of Report Period, Estimated Date of Startup:
l l
(4957z/10)
"~