Revised Monthly Operating Rept for Braidwood Unit 2 for June 1990
ML20055H047
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 06/30/1990
From: Dundek K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20055H030 List:
References
NUDOCS 9007250112
Download: ML20055H047 (1)


Text

--

1 B.

OPERATING DATA REPORT DOCKET NO.:

50-457 UNIT:

Braidwood 2 DATE: 07/17/90 COMPILED BY:

K. M. Dundek TELEPHONE:

(815)458-2801 ext. 2480 OPERATING STATUS 1.

Reporting Period: June, 1990 Gross Hours:

720 2.

Currently Authorized Power Level (MHt):

3411 Design Electrical Rating (MHe-gross):

1175 Design Electrical Rating (MHe-net):

1120 Max Dependable Capacity (MHe-gross):

1175 Max Dependable Capacity (HWe-net):

1120 3.

Power level to which restricted (If Any):

None 4.

Reasons for restriction (If Any):

None THIS MONTH YR TO DATE CUMULATIVE 5.

Report period Hours:

720 4343 14914 6.

Hours Reactor Critical:

552.9 2487 2 11622.5 2

7.

RX Reserve Shutdown Hours:

0.0 0.0 0.0 8.

Hours Generator on Line:

572.1 2433.4 11494.2 l 9.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0-10.

Gross Thermal Energy (MHH):

1472014 5307625 31148583 11.

Gross Elec. Energy (MHH):

500742 1765401 10656789 12.

Net Elec. Energy (MHH):

474568 1649312 10142287

-13.

Reactor Service factor:

76.8 57.3-77.9 14.

Reactor Availability Factor:

76.8 57.3 77.9 15.

Unit Service Factor:

76.1 55.5 76.9 16.

Unit Availability Factor:

76.1 55.5 76.9 17.

Unit Capacity Factor (MDC net):

58.9 33.9 60.7 y

18.

Unit Capacity Factor (DER net):

58.9 33.9 60.7 19.

Unit Forced Outage Rate:

20.5 5.7 L.1 l 20.

Unit Forced Outage Hours:

147.9 147.9 613.6 l 21.

Shutdowns Scheduled Over Next 6 Months: None 22.

If Shutdown at End of Report Period, Estimated Date of Startup:

l l

(4957z/10)

"~

9007250112 900717 PDR ADOCK 05000457 R