ML20055G182
| ML20055G182 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/06/1990 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20055G183 | List: |
| References | |
| NUDOCS 9007200217 | |
| Download: ML20055G182 (2) | |
See also: IR 05000245/1990007
Text
%
,
,
'
A;> ~
'
&
.,
,
< t.
.
d
DUL 0 61090
- -
e
Docket No. 50-245
'
Northeast' Nuclear. Energy Company
x
- ATTN
- Mr. E. J. Mroczka-
Senior Vice President - Nuclear
Engineering and Operations
P.O. Box 270:
'
Hartford,' Connecticut
06141-0270
G'entlemen:
a
SUBJECT: .NRC REGION-1 INSPECTION'NO. 50-245/90-07
This letter transmits the report of the routine safety inspection conducted by
r
Mr. D. Dempsey and others of-this office on April 3 through May 14, 1990, at
,
.
Millstone Nuclear Power Station, Unit 1, Waterford, Connecticut. The report
' covers. activities ~ authorized by NRC License No. DPR-21.- The inspection-find-
ings were discussed by Mr. Dempsey with Mr. J. .Stetz and others of.your staff .
,
at the~ conclusion of the inspection.
.
I
Areas examined during the inspection are described in the NRC Region I
inspection report which is enclosed-with this letter. Within these areas, the
h
inspectiun consisted.of observation of activities, interviews with personnel
and document reviews.
'With regard to your discovery that certain equipment ~ important to safety may bei
i
' adversely af fected by breaks in house heating steam- piping, as described in
d
.
."
'Section 7.2.of the enclosed inspection report, v'.. note the high regard by.
. facility management and staff for the safe o% ration of Millstone Unit 1.
'
,
This letter:also acknowledges your
>tter dated January ~31, 1990,!in response
to our letter dated January 3, 199C Subject: NRC Region I Inspection Report
50-245/89-23), regarding failure to perform surveillance on the isolation' con-
]
' denser. isolation- system within the portodicity required by technical specifi-
j
cations. Thank you for informing us of the corrective and preventive actions
i
documented in.your letter. These actions were examined and found.to be" accept-
1
4
'245/90-02, transmitted to you on April 6, 1990.
'
- [
able, as discussed in Section 6.3.1 of NRC Region I Inspection Report No.-50-
j
l
"
u nr> cooperation with us is appreciated.
'
J
S6nggplySIGCED DY
l
,,
EDYMHD C. WEtlZitiGER
]
Edward C. Wenzinger, Chief
Projects Branch No. 4
1
Division of Reactor Projects
i
k
E
Enclosure: NRC Region I Inspection
i
' Report No. 50-245/90-07
ll
1
T
OFFICIAL RECORD COPY
IR MILL 1 90-07 - 0001.0.0
^
~
9007200217 900706
'\\
'
jDR - ADOCK 05000245
,
+
lE
I
l
-
i
L<
d
"
-
r
p
a
m
g.
- .-
,
Northeast Nuclear Energy Company
2
cc w/ enclosure.
,
W. D. Romberg, Vice President, Nuclear Operations-
-l
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager., Generation Facilities Licensing
-S. E. Scace; Station Director, Millstone
J. _P.
Stetz, Nuclear Unit Director, Millstone Unit 1.
l
E.'A. DeBarba, Station-Director, Haddam Neck
Gerald Garfield, Esquire
Public Document Room (PDR) .
Local- Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
4
.
NRC Senior Resident Inspector
State of-Connecticut
bec w/ enclosure:
Region.I Docket Room (w/ concurrences)
Management Assistant, DRMA (w/o enclosures)
DRP'Section Chief
J..Shediosky, SRI, Haddam Neck
i
W.'Raymond, SRI, Millstone
R.-Bellamy, DRSS
bec w/ Executive Summary only:
,
W. Kane, DRP.
J,
J. Wiggins', DRP
i
W.'Hodges, DRS
W. Johnson,: DRS
,
J'. Durr, DRS-
t
R. Gallo, DRS
M. Knapp, DRSS
.
R. Cooper, DRSS
.;
'J. Stolz, NRR/PDI-4
-Q
l
-
h'
ur
.
.
RI:0RP
R
R '. t
RI
'
'Dempsey
Raymond
Haverkamp
er
.
7/id/90-
7///90
7//; /90
7/h/90
0FFICIAL RECORD COPY
IR MILL 1 90-07 - 0002.0.0
11/29/80
,
l
,
-
>
1