ML20055F871

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect HPCI Area Fire Protection Sys Mod Which Replaces spot-type Heat Detectors W/Linear Heat Detector
ML20055F871
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 07/16/1990
From: Stols R
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20055F872 List:
References
ID84, NUDOCS 9007190318
Download: ML20055F871 (2)


Text

.. . . ~ . . _ . -- . . _ . . . . - - . - . . _ _ _ _ - _ _ - .

/O, .C:mmonw:alth Edison 71400 Opus Pirce Down:rs Grove, Illinois 60515 k

July 16, 1990 1 4

Dr.-Thomas E. Murley, Director Office of Nuclear ~ Reactor Regulation i U.S.- Nuclear Regulatory Commission Washington, D.C. 20555 i Il ATTN: DOCUMENT CONTROL DESK

Subject:

Quad Cities Station Ur'ts 1 and 3 ~i Application for-Amendment to  :

Facility Operating Licenses DPR-29 and DPR-30, Appendix A, '

Technical Specifications EC_ Docket Nos. 50-254 and 50-265

Reference:

Dr. Murley:

Pursuant to.10 CFR 50.90, Commonwealth Edison proposes to amend Appendix A, Technical Specifications to Facility Operating Licenses.DPR-29.and DPR-30 for the Quad C1 ties-Nuclear Power Station; The proposed Technical l Specification. reflects a'HPCI area; fire protection sy"cem modification which replaces spot-type heat detectors with a< linear heat detector. -Commonwealth Edison initiated the development-of the. modification.due to the spurious actuation of the sprinkler system in the HPCILroom which rendered thetHPCI system inoperable for a period of time. The modification 1s-intended.to -

provide additional reliability of the fire protection system._ The proposed .

amendments are delineated in Attachment 1 and further discussed in~ Attachments 2 and 3.' -)

Since November 28, 1989, the HPCI fire detection system _for Units 1 and 2 has been removed from service ~to prevent any further spurious. operation ,

'by the fire protection system. Compensatory measures have been established <

since the removal of.t.he-system from service. The modification design work will be completed in-late July and therefore Commonwealth Edison requests your Staff's approval of the proposed amendment no later than October 12, 1990, h0[ bo  ;[

u r

y, July 16, 1990 !

~

Dr. S T. E . , Hur_l ey.- -2. l

. The proposed changes have.been reviewed and approved by both On-site and Off-site Review in accordance with. Commonwealth Edison Company's procedures.. The' proposed' amendments have been reviewed in accordants with.10 CFR 50.92(c) and it bas been determined that the proposed aw.endment'does nct' 1 involve a significant hazards consideration. The evaluation is documented:in Attachment 4.

I Commonwealth. Edison is notifying the. State of.1111nols of the appilcation for this amendment by transmitting-a copy ofsthis. letter and i

. attachments to the-designated State Official..

~

Please direct any questions on the proposed amendment to me at 708/515-7283.

Very truly_yours, R. Stols.

Nuclear Licensing Administrator h ,

Attachments 1:' Proposed Changest 1 o Appendix A Technical Specifications 2: Summary of Changes _ _

3: Description and Bases for Amendment Request 4: . Evaluation of No'Significant Hazards Consideration' '

Figure 1: Unit 1 HPCI Area-Fire Detection' System Configuration Figure 2: Unit 2 HPCI Area Fire Detection System' Configuration cc: A'.B. Davis - Regional Administrator, RIII L.N. 01shan - Project Manager, NRR T.-' Taylor - Quad. Cities Senior Resident Inspector Office NuclearLFacility Safety - IDNS. i t

SUBSCRIBED AND SHORN to omCIALSEAL

.before m t ][mL d LEROY R.RANSOME 1 i of U 4 9 NOTARY PUBUC sfATE OF ll11N0l3 MY COMMISSION EIP. apt. 6.1993 --

Q Not y/ Pub1'ic-

'imw/ID84

_ - .. , . ,