ML20055F871
| ML20055F871 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 07/16/1990 |
| From: | Stols R COMMONWEALTH EDISON CO. |
| To: | Murley T NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20055F872 | List: |
| References | |
| ID84, NUDOCS 9007190318 | |
| Download: ML20055F871 (2) | |
Text
..
.. ~.. _. --
/O,.C:mmonw:alth Edison 71400 Opus Pirce k
Down:rs Grove, Illinois 60515 July 16, 1990 1
4 Dr.-Thomas E. Murley, Director Office of Nuclear ~ Reactor Regulation i
U.S.- Nuclear Regulatory Commission Washington, D.C.
20555 i
I l
ATTN:
DOCUMENT CONTROL DESK
Subject:
Quad Cities Station Ur'ts 1 and 3
~i Application for-Amendment to Facility Operating Licenses DPR-29 and DPR-30, Appendix A, Technical Specifications EC_ Docket Nos. 50-254 and 50-265
Reference:
Dr. Murley:
Pursuant to.10 CFR 50.90, Commonwealth Edison proposes to amend Appendix A, Technical Specifications to Facility Operating Licenses.DPR-29.and DPR-30 for the Quad C1 ties-Nuclear Power Station; The proposed Technical Specification. reflects a'HPCI area; fire protection sy"cem modification which l
replaces spot-type heat detectors with a< linear heat detector. -Commonwealth Edison initiated the development-of the. modification.due to the spurious actuation of the sprinkler system in the HPCILroom which rendered thetHPCI system inoperable for a period of time.
The modification 1s-intended.to provide additional reliability of the fire protection system._ The proposed amendments are delineated in Attachment 1 and further discussed in~ Attachments 2 and 3.'
-)
Since November 28, 1989, the HPCI fire detection system _for Units 1 and 2 has been removed from service ~to prevent any further spurious. operation
'by the fire protection system.
Compensatory measures have been established since the removal of.t.he-system from service.
The modification design work will be completed in-late July and therefore Commonwealth Edison requests your Staff's approval of the proposed amendment no later than October 12, 1990, h0[ bo
- [
u r
y, Dr. S T. E., Hur_l ey.-
-2.
July 16, 1990 !
l
~
. The proposed changes have.been reviewed and approved by both On-site and Off-site Review in accordance with. Commonwealth Edison Company's procedures.. The' proposed' amendments have been reviewed in accordants with.10 CFR 50.92(c) and it bas been determined that the proposed aw.endment'does nct' 1
involve a significant hazards consideration.
The evaluation is documented:in.
Commonwealth. Edison is notifying the. State of.1111nols of the I
appilcation for this amendment by transmitting-a copy ofsthis. letter and i
. attachments to the-designated State Official..
~
Please direct any questions on the proposed amendment to me at 708/515-7283.
Very truly_yours, R. Stols.
Nuclear Licensing Administrator h
Attachments 1:'
Proposed Changes 1 o Appendix A Technical Specifications t
2:
Summary of Changes 4:.
Description and Bases for Amendment Request 3:
Evaluation of No'Significant Hazards Consideration' Figure 1:
Unit 1 HPCI Area-Fire Detection' System Configuration Figure 2:
Unit 2 HPCI Area Fire Detection System' Configuration cc:
A'.B. Davis - Regional Administrator, RIII L.N. 01shan - Project Manager, NRR T.-' Taylor - Quad. Cities Senior Resident Inspector Office NuclearLFacility Safety - IDNS.
i t
SUBSCRIBED AND SHORN to omCIALSEAL
.before m t
][mL d LEROY R.RANSOME 1 i
U 4
9 NOTARY PUBUC sfATE OF ll11N0l3 of MY COMMISSION EIP. apt. 6.1993 --
Q Not y/ ub1'ic-P
'imw/ID84
,