Forwards Safety Insp Rept 50-423/90-08 on 900503-0611 & Notice of Violation.Nrc Concerned About Violations Because Multiple Operator Errors Recently Occurred & Procedures Re Use of Dedicated Operator Inconsistent
ML20055F545
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/03/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20055F546 List:
References
NUDOCS 9007180011
Download: ML20055F545 (3)


See also: IR 05000423/1990008

Text

n

.rt

u

a

" %. e , .

+

.

. , -

1

-.

)'

'i.i

' ,.

-1

g

'

'

..

s

,o

s

,

1

JUL 031990.

I

[

"

-

h

[

'

.

.

F

. Docket No. 50-423

'

i

-

Northeast'NuclearLEnergy Company

.

ATTN:

Mr-. Edward J. Mroczka

1

Seniorc Vice President - Nuclear.

'

.

Engineering and Operations

,

.P.O. Box'270

j

,

e

. Hartford,' Connecticut

06141-0270

t

.

Gentlemen:

?-

Subject: NRC Region 1 Inspection No. 50-423/90-08

This refe_rs to the routine resident safety inspection conducted by

Mr. K. Kolaczyk.and others of this of fice on May 3 through June 11, 1990 at.

Millstone Nuclear Power Station, Unit 3. Waterford, Connecticut of. activities

authorized by NRC License No. NPF-49 and to the discussions of our findings'by.

j

Mr, 'Kolaczyk with Mr. C. Clement and others of your staff at the conclusion of

4

the inspection.

"

Areas examined during this inspection are described in the NRC Region.1

inspection report which is enclosed with-this letter. Within these' areas, the'

t

inspection consisted of observation of activities, interviews with. personnel,

ii

1 measurements,'and document reviews.

.

. Based upon the results of this . inspection, it appears that certain of your

activities were not conducted in full' compliance with NRC requirements,-as.. set

forth in-the Notice of Violation enclosed herein as Appendix A and further

.

discussed in sections 3.3 and 3.5,1.of the enclosed inspection report.

The-

>

,

'!

violations! involved::(1)'the failure to follow procedures during plant

cooldown/heatup operations; and (2)'the failure.to notify the NRC in a timely

'

manner when safety-related equipment was rendered inoperable.

These violations ~

.

have been categorized by severity level in accordance with the " General

Statementtof Policy and Procedure for NRC Enforcement Actions," 10CFR Part 2,

.

LAppendix C (Enforcement Policy, 1990).

You are required to respond to this

'

letter and in. preparing youri-response, you should follow the instructions ~in

. Appendix A.

.

,

Neareconcernedabouttheseeventsbecause:

(1) multiple operator errors have

-l

~

recently occurred; (2) an operator training weakness apparently exists since

'

operations. personnel did not immed_iately recognize that certain equipment

'

failures need to be. reported to the 'NRC; and (3) proceduret regarding use_ of a -

,

dedicated' operator are inconsistent which could desensitize an operator to the -

importani:e of his function. We request that you address the above concerns in

your response.

mp

.\\

!

o

0FFICIAL RECORD COPY

SG IR MILL 3 90-08 - 0003.0.0

'\\

'

OO$k $$[8 23

/h

PDC

,)/

,

pm a, m.

-

m

-

,

JUL 031990.

"

.,

,.

[

Northeast Nuclear Energy Company-

2-

,

p

,

W

A section of the enclosed inspection report contains details of your security

-

-program.that'have been determined to be exempt from public disclosure in'

-

o

b

accordance with 10 CFR 73.21 (Safeguards Information). Therefore, that

~

information will not be placed in the NRC's Public Document Room and will

'~

-receive: limited distribution.

This letter and.the remainder of the inspection

report will be placed in'the Public Document Room, in accordance with 10 CFR

L 2.'790( a ) .

_

,,

y

,

_Your cooperation with us is appreciated.

Sincerely,

,

el

'[

Ok GINAL SIGNED BY:

,

Edward C. Wenzinger, Chief

Projects Branch No. 4

Division of Reactor Projects

. Enclosures:

'1.

Appendix' A', Notice of Violation

2.

NRC Region ! Inspection Report No. 50-423/90-08, (contains Safeguards'

'

,

Information_(SGI) in Section 7)

cc w/encls: (w/o SGI)

2

W. D. Rcmberg, Vice President, Nuclear Operations

!

S. E Scace, Station Director, Millstone (w/SGI)

-

.

D. 0..Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

C. Clement,' Director, Millstone 3

!

.

Gerald Garfield, Esquire

Public-Document Room (PDR)

Local Public Document Room (LPDR).

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector (w/SGI)

  • !

State of Connecticut

t

.bcc w/encis: (w/o SGI)

Region IiDocket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

__

H

DRP-Section Chief

R. Bellamy, DRSS

J; Shediosky, SRI, Haddam Neck

.

W, Raymond, SRI, Millstone

-0,EJaffe, PM, NRR

-

R'. Gallo, DRS (Section 3.3 and 3.5.1)

,

0FFICIAL RECORD COPY

SG IR MILL 3 90-08 - 0003.1.0

07/03/90

,

.n.

e. a

,

y- .

-o

-

,e.

Northeast Nuclear-Energy Company

. 3:

.JUL 0 3.1S90.-

-.

. , , .

-bec w/ Executive Summary only:

W. Kane, DRP

J.;Wiggins, DRP

W Hodges, DRS

..

. . Johnston', DRS-

W .

,;

.id. Durr,:DRS

R. Gallo, DRS-

M. Knapp, DRSS

ic ,

R. Cooper DRSS

J. Stolz, NRR/PDI-4

a

,

-

>

Q

/

f>

'O

i

(9

V

o

aw

w.

w

49nger

1

.

pKolaczyk/9eb gRaymond

Haverkamp

w

x

.

07/d/90

07h3 /90

07/07/90

07/ /90

0/

.

0FFICIAL RECORD COPY

SG IR MILL 3 90-08 - 0004.0.0

07/03/90

.

.i

s .-

.

. . . .

. .

. .