ML20055F545
| ML20055F545 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/03/1990 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20055F546 | List: |
| References | |
| NUDOCS 9007180011 | |
| Download: ML20055F545 (3) | |
See also: IR 05000423/1990008
Text
n
.rt
u
a
" %. e , .
+
.
. , -
1
-.
)'
'i.i
' ,.
-1
g
'
'
..
s
,o
s
,
1
JUL 031990.
I
[
"
-
h
[
'
.
.
F
. Docket No. 50-423
'
i
-
Northeast'NuclearLEnergy Company
.
ATTN:
Mr-. Edward J. Mroczka
1
Seniorc Vice President - Nuclear.
'
.
Engineering and Operations
,
.P.O. Box'270
j
,
e
. Hartford,' Connecticut
06141-0270
t
.
Gentlemen:
?-
Subject: NRC Region 1 Inspection No. 50-423/90-08
This refe_rs to the routine resident safety inspection conducted by
Mr. K. Kolaczyk.and others of this of fice on May 3 through June 11, 1990 at.
Millstone Nuclear Power Station, Unit 3. Waterford, Connecticut of. activities
authorized by NRC License No. NPF-49 and to the discussions of our findings'by.
j
Mr, 'Kolaczyk with Mr. C. Clement and others of your staff at the conclusion of
4
the inspection.
"
Areas examined during this inspection are described in the NRC Region.1
inspection report which is enclosed with-this letter. Within these' areas, the'
t
inspection consisted of observation of activities, interviews with. personnel,
ii
1 measurements,'and document reviews.
.
. Based upon the results of this . inspection, it appears that certain of your
activities were not conducted in full' compliance with NRC requirements,-as.. set
- forth in-the Notice of Violation enclosed herein as Appendix A and further
.
discussed in sections 3.3 and 3.5,1.of the enclosed inspection report.
The-
>
,
'!
violations! involved::(1)'the failure to follow procedures during plant
cooldown/heatup operations; and (2)'the failure.to notify the NRC in a timely
'
manner when safety-related equipment was rendered inoperable.
These violations ~
.
have been categorized by severity level in accordance with the " General
Statementtof Policy and Procedure for NRC Enforcement Actions," 10CFR Part 2,
.
LAppendix C (Enforcement Policy, 1990).
You are required to respond to this
'
letter and in. preparing youri-response, you should follow the instructions ~in
. Appendix A.
.
,
Neareconcernedabouttheseeventsbecause:
(1) multiple operator errors have
-l
~
recently occurred; (2) an operator training weakness apparently exists since
'
operations. personnel did not immed_iately recognize that certain equipment
'
failures need to be. reported to the 'NRC; and (3) proceduret regarding use_ of a -
,
dedicated' operator are inconsistent which could desensitize an operator to the -
importani:e of his function. We request that you address the above concerns in
your response.
mp
.\\
!
o
0FFICIAL RECORD COPY
SG IR MILL 3 90-08 - 0003.0.0
'\\
'
OO$k $$[8 23
/h
,)/
,
pm a, m.
-
m
-
,
JUL 031990.
"
.,
,.
[
Northeast Nuclear Energy Company-
2-
,
p
,
W
A section of the enclosed inspection report contains details of your security
-
-program.that'have been determined to be exempt from public disclosure in'
-
o
b
accordance with 10 CFR 73.21 (Safeguards Information). Therefore, that
~
information will not be placed in the NRC's Public Document Room and will
'~
-receive: limited distribution.
This letter and.the remainder of the inspection
report will be placed in'the Public Document Room, in accordance with 10 CFR
L 2.'790( a ) .
_
,,
y
,
_Your cooperation with us is appreciated.
Sincerely,
,
el
'[
Ok GINAL SIGNED BY:
,
Edward C. Wenzinger, Chief
Projects Branch No. 4
Division of Reactor Projects
. Enclosures:
'1.
Appendix' A', Notice of Violation
2.
NRC Region ! Inspection Report No. 50-423/90-08, (contains Safeguards'
'
,
Information_(SGI) in Section 7)
cc w/encls: (w/o SGI)
2
W. D. Rcmberg, Vice President, Nuclear Operations
!
S. E Scace, Station Director, Millstone (w/SGI)
-
.
D. 0..Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
C. Clement,' Director, Millstone 3
!
.
Gerald Garfield, Esquire
Public-Document Room (PDR)
Local Public Document Room (LPDR).
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector (w/SGI)
- !
State of Connecticut
t
.bcc w/encis: (w/o SGI)
Region IiDocket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
__
H
DRP-Section Chief
R. Bellamy, DRSS
J; Shediosky, SRI, Haddam Neck
.
W, Raymond, SRI, Millstone
-
R'. Gallo, DRS (Section 3.3 and 3.5.1)
,
0FFICIAL RECORD COPY
SG IR MILL 3 90-08 - 0003.1.0
07/03/90
,
.n.
e. a
,
y- .
-o
-
,e.
Northeast Nuclear-Energy Company
. 3:
.JUL 0 3.1S90.-
-.
. , , .
-bec w/ Executive Summary only:
W. Kane, DRP
J.;Wiggins, DRP
W Hodges, DRS
..
. . Johnston', DRS-
W .
,;
.id. Durr,:DRS
R. Gallo, DRS-
M. Knapp, DRSS
ic ,
R. Cooper DRSS
J. Stolz, NRR/PDI-4
a
,
-
>
Q
/
f>
'O
i
(9
V
o
aw
w.
w
49nger
1
.
pKolaczyk/9eb gRaymond
Haverkamp
w
x
.
07/d/90
07h3 /90
07/07/90
07/ /90
0/
.
0FFICIAL RECORD COPY
SG IR MILL 3 90-08 - 0004.0.0
07/03/90
.
.i
s .-
.
. . . .
. .
. .