Monthly Operating Rept for June 1990 for Millstone Unit 1.W/
ML20055F185
Person / Time
Site: Millstone 
Issue date: 06/30/1990
From: Newburgh G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-90-671, NUDOCS 9007160051
Download: ML20055F185 (5)


Text

_ _. _...

,.j k

(;.

e' Ok,U id?!

lj

- General Offices e Seldon Street, Berlin, Connecticut w cow.sevan n a ewe cow-a u

i mim va o.mmsac.accowan p 3. BOX 270

'a'** wa co**"

HmRTFORo, CONNECTICUT 061410270

(([',[M,"Z, (203) MS-50c1 L

L J

July 6., 1990

-MP-90-671-Re:- 10CFR50.71(a)

U.S.. Nuclear Regulatory Comission Document-Control Desk.

Washington, D.C.

20555

Reference:

Facility Operating License DPR Docket No. 50-245

Dear Sir:

In' accordance with Millstone -Unit 1 Technical Speciff :ation 6.9 l.6, the following monthly operating data report for Millstone Unit.1 is enclosed.

One additional copy of the report is enclosed.

Very truly-yours, NORTHEAST NUCLEAR ENERGY COMPANYJ L

f

. Step n E..Scace Director, Millstone Station SES/GSN:cle

Enclosures:

(4)

-cc:

T..T. Martin, Regional Administrator. Region I M. Boyle, NRC Project Manager, Millstone Unit No. 1 W. J..Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3 900630

'9007160051 ADOCK0500g5 g

PDR R

E

-.E'

  • =

+

AVERAGE DAILY UNIT POWER LEVEL 1

DOCKET NO.

50-245 n

-UNIT Millstone 1 DATE -900702--

COMPLETE BY G. Newburgh TELEPHONE-- (203) 447-1791 Extension 4400~

h 3MO TH ' June 1990 DAY-AVERAGE' DAILY' POWER-LEVEL DAY-AVERAGE DAILY POWER LEVEL (MWe-Net)-

(MWe-Net)

L1-660:

17 645 2:

659 18 657 3

650 19 438 o

'4' 659 20 0

5 660 21 0

n_-

16 659 22 0'

7 582 23 0

8 660!

24 0

4 9

660 25 0

.10.

- 660 26 0

e 11 660 27 0

.12 660 28 0

13-594 29 0-s 14 602 30 98 15 626 31 N/A 16 632 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Computer to the nearest whole megawatt, l

l

c.,

['-Q

_ (

OPERATING DATA. REPORT DOCKET NO.

50-245 DATE. 900702 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Extension 4400

-OPERATING STATUS,

1 '.

' Unit Name: Millstone l' Notes:

12.

Reporting Period:. June, 1990 3.

Licensed Therinat Power (HWt): 2011

4.. - Nameplate ' Rating -(Gross MWe) : 662 5.;

Design Electrical Rating (Net MWe): 660 6.

Maximum Dependable Capacity (Gross MWe): 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report,. Give Reasons:

N/A

'9.

Power Level to Which Restrj;ted, If Any (Net MWe):.

N/A

10. ' Reasons.For Restrictions, If Any:

N/A

11.l Hours In Reporting Period 720 4,343 171,695
12. Number Of Hours Reactor Was Critical 507.2 4,027.9 136,392.8 13 '. Reactor ReserveLShutdown Hours 0

0 3,283.3

14.. Hours Generator On-Line 459.8 3,950.5 133,027.3
15. Unit Reserve Shutdown Hours 0

0 93.7

16. Gross Thermal Energy Generated (MWH)

-890,365 7,782,538-249,180,075

17.. Gross Elec. Energy Generated (MWH 304,000 2,669,200 84,091,296
18. Net Electrical Energy Generated (MWH) 289,194 2,552,785 80,245,045
19. Unit Service' Factor 63.9 91.0

-77.5

20. Unit Availability Factor 63.9 91.0 77.5
21. Unit. Capacity Factor (Using MDC Net) 61.4 89.9 71.5
22. Unit Capacity Factor (Using DER Net) 60.9 89.1 70.8

~23.

Unit Forced Outage Rate 0

0.3 10.0 24.-

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 15.

If Shutdown at End of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

m a.

..ga

., y '.1,..

"lg9l "W,.'

~

7

]i, $

7 DOCKET NO. 50-245

.. UNIT SHUTDOWNS ~AND POWER REDUCTIONS

' UNIT NAME Millstone 1 DATE 900402 COMPLETED BY G. Newburgh REPORT HONTH June, 1990 TELEPHONE (203) 447-1791 j

Extension 4400 i

No.

Date Type

-Duration Reason 2 Method of' Licensee-System Component ~

Cause & Corrective l

~

(Hours)

Shutting Event..

Code 4

-Codes Action to Down Reactor 3 Report'.. f -

Prevent Recurrence-90-05 900619 s

260.2 A.

1 N/A N/A

.N/A-Replaced.

Recirculation pump:

seal to prevent leakage.

1F: Forced 2 Reason:

3 Method:

4Exhibit G - Instructions.

S: Scheduled A-Equipment Failure (Explain) 11-Manual sfor Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets.for. Licensee C-Refueling.

3-Automatic Scram Event. Repcrt (LER). File.

D-Regulatory Restriction

'4-Continued from (NUREG-0161)'

E-Operator' Training & License Examination'

' previous' month F-Administrative.

5-Power ~Reductionf 5 Exhibit 1 - Same Source-

~

G-Operational Error (Explain)

.(Duration - 0)

H-Other'(Explain) 6-Other '. (Explain)

~

W i

.<:e.

/';,..,.

REFUELING INFORMATION REQUEST-I l '.

Name ofifacility: Millstone 1 2.

itheduled date for'next refueling shutdown: MARCH 1991' i

'3.

Schedule'date for restart following refueling: APRIL 1991 f.'

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license-amendment?'

4 L

Yes,.Technicial Specification Changes Regarding:

(1)- Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5,

Scheduld date(s)' for submitting licensing action and supporting l

information:

Winter 199t.-91 6.

Important'litensing considerations associated with refueling, e.g., new or different fuel design or supplier,-unreviewed design or performance analysis methods, significant changes in fuel design, new operating, procedures:

196'GE8B Puel Assemblies

,7.

i l

The number-of fuel assemblies (a) in the core and (b) in the spent fuel E

storage pool:-

(a).

In Core: '(a) 580 (b) 1928 '.

]

8. -

The present. licensed spent fuel pool storage capacity and the' size of any increase in licensed storage capacity that has been requested or is' planned, in number-of fuel assemblies:

i:

}

ll Present caoacity, 3229 assemblies 1

9.

The projected date of the last refueling that can be discharged to the

[

j l

spent fuel pool assuming the present licensed capacity:

1 1997, Spent Fuel Pool, Full Core Off Load Capability is Reached L

i

-