Forwards Mid-SALP Cycle Insp Repts 50-245/90-80, 50-336/90-80 & 50-423/90-81 on 900312-0503.NRC Made Presentations of self-assessment of Performance During 900508 Meeting
ML20055E926
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/05/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20055E927 List:
References
NUDOCS 9007130088
Download: ML20055E926 (2)


See also: IR 05000245/1990080

Text

gm

+

>

+

- - -

- - -

,

-w

g

,,

,.x

_

,:

,

1

'

,

'

,

QUL 0 5 990

j

s

-

m

Docket Nos.1 50-245'; 50-336; 50-423

-

,

Northeast' Nuclear Energy Company.

F

-ATTN: Mr. E. J. Mroczka-

!

,

Senior Vice President - Nuclear

'

'

.. . Engineering and Operations

P 0L Box 270

l

' Hartford, Connecticut.

06141-0210-

+

.

1

,

'

. Gentlemen:

'

. Subject:- NRC Region I Combined Mid-SALP Cycle Team Inspection Nos.

>

,

. 50-245/90-80; 50-336/90-80, and 50-423/90-81

j

e

,

This refers to the Mid-SALP (Systematic Assessment of Licensee Performance)

"

Cycle inspections conducted by Mr. W. Raymond of this office and'other members

i

of:the.NRC Region'I and NRR staffs from March 12 through May 3 1990, at

f

'

Millstone Nuclear Power Station,-Units'1, 2 and 3. Waterford, Connecticut, and

.

at your corporate office in Berlin, Connecticut, and to the discussions 1of;our

. find.ings with Mr. W, Romberg-and'others of your staff during a management. meet-

l

ing at the NRC Region I Office on May 8, 1990.

'.

. Areas examined during the inspection are described in the NRC Region I

. inspection report enclosed with,this letter. 'Within these-areas, the

!

inspection consisted of meetings with personnel,; observation of activities,

i

and, document reviews,

!

4

During* the May.8,1990 meeting, your staff made presentations of.its self-

]

assessment of' performance,.as summarized in an attachment to..the-enclosed in-

?

_

spection report. - Areas of general strengths and areas requiring further-

'

improvement are noted in:the attached report. The NRC staff will use the'

,

'

results of this inspection to focus' inspections in'the SALP functional areas

';

for the remainder of the SALP cycle, now scheduled to conclude on November 15,.

.

j

1990!for all thr e: Millstone units.

]

7

The extensive preparation and efforts-expended by your site and corporate'

i

staffs to support this inspection.is acknowledged and greatly appreciated.

>

Sincerely.

0.mGl!ZL SIGt!ED BY-

,

EDWARD C. WENZINGER

j

!

Edward C. Wenzinger, Chief

Projects Branch No. 4

.

'~

Division of Reactor Projects

Enclosure: NRC Region I Combined Inspection Report Nos. 50-245/90-80,

l

i

-50-336/90-80 and 50-423/90-81

'

0FFICIAL RECORD COPY

MID SALP RPT - 0001.0.0

g(

g(.

06/15/90

90071300se 9oopo$

.

!

'

m

-

gDR .ADOCK 05000245 '

/O

t

pdc

m

n

-

.w

i

L

Northeast Nuclear Energy Company

2

<

-

cc w/ enc 1:

-

W. D. Romberg, Vice President, Nuclear Operations

}

R. M. Kacich, Manager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services

S. E. Scace, Nuclear Station Director, Millstone Station

"

J. P. Stetz, Nuclear Unit Director, Millstone 1

J. S. Keenan, Nuclear Unit Director, Millstone 2

C. H. Clement, Nuclear Unit Director, Millstone 3

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPD)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

,

E. A. DeBarba, Station Director, lladdam Neck

-

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

.

!

DRP Section Chief

J. Shediosky, SRI, Haddam Neck

W. Raymond, SRI, Millstone

M. Boyle, LPM, NRR

,-

D. Jaffe, LPM, NRR

G. Vissing, LPM, NRR

R. Bellamy, DRSS

'

bec w/ Executive Summary only:

W. Kane, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Johnston, DRS

J, Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS

R. Cooper, DRSS

J. Stolz, NRR/PDI-4

RI

R

R - [P

R}1l

B. Raymond

D. Haverkamp

zinger

pne

.

07/vf/90

07Ad90

07/p/90

07/)/90

0FFICIAL RECORD COPY

MID SALP RPT - 0002.0.0

'

06/15/90