t.
p UNITED $TATES t
y 5
L NUCLEAR REGULATORY COMMISSION g3 g
. WASHINGTON, D. C. 20666 g
3 i
VIRGINIA ELECTRIC AND POWER COMPANY-OLD DOMINION ELECTRIC COOPERATIVE DOCKET NO. 50-338-u.
NORTH ANNA POWER STATION. UNIT NO. 1
-AMENDMENT TO FACILITY OPERATING LICENSE' Amendment No.128 License No NPF-4 g-
- 1. _
The Nuclear Regulatory Comission (the Comission) has'found that:
q
~A.
The. application for amendment by Virginia Electric and Power Company ~
ar' etal.,(thelicensee)datedMarch 26, 1990, complies with the--
. standards and requirements of-the Atomic Energy Act of 1954,.
1 as amended (the Act), and the Comission's rules and regulations' set forth in 10 CFR Chapter I; j
B.
The facility will operate-in conformity with the application,
'l the provisions of the Act, and the rules and: regulations of.
4l the Comission;,
g 1
C.
zThereisreasonable. assurance (i)thattheactivitiesauthorized by this amendment can be conducted without endangering the health' c
and safety-of the public, and (ii) that such activities will be entducted in comp' > 3nce with the Comission's regulations; j
~0.
The issuance of this amendment'will not be inimical to the comon -
defense and ' security or to the health and safety of the public; l
and i
E.
The issuance'of this amendment is in accordance with 10 CFR Part i
4 51 of the Comission's regulations and all app 1,1 cable requirements
- i have been-satisfied.
iq:
V i
m i
i 9007110198 900703 PDR ADOCK 05000338 P
PDC p,. n
.m 1,,,
j
.a:,.
v 1
2.
Accordingly, the license is amended by changes! to the Technical Speci. -
g fications as indicated in the attachment to this'11 cense amendment.
- and paragraph 2.0.(2) of Facility Operating License No.. NPF is hereby amended to read as follows:
(2) Technical Specifications
- [
i
.The Technical Specifications contained in Appendices A and B,-
i as revised through Amendment No.128 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance-and shall-
.be implemented within 30 days.
f, FOR THE NUCLEAR REGULATORY COMMISSION
.s rbert N. Berkow, Director J'
Project Directorate 11-2 Division-of Reactor Projects - I/II q
Office of Nuclear Reactor Regulation l
0 Attach:nent:
Changes to the-Technical-1 Specifications.
l Date of. Issuance: ' July 3, 1990 l
i 4s
~!
i 3
-j -
i f 'm's ' :+
- g g
, l
s ATTACHMENT TO LICENSE AMENDMENT 'NO.128 1.
TO FACILITY OPERATING LICENSE NO. NPF-4 DOCKET NO. 50-338 Replace the-following pages of the Appendix "A" Technical Specifications with the enclosed pages as indicated. The revised pages'are identified by amendment number and contain vertical lines indicating the area of. change.
The corresponding overleaf pages are also provided to maintain document completeness.
i D
.,h 3/4 8-1 3/48-2a(new) 3/48-4d(new) 3/4 8-5 i
1 s:
ig
. i i
e r
X
-4
3/4.8 ELECTRICAL POWER SYSTEMS-3/4.8.1 A.C. SOURCES:
OPERATING-
.LI"! TING CONDITION FOR OPERATION 3.8.'l.1-As' a minimum, the following 'A. C. electrical power sources shall-be '
OPERABLE:
.a.
Two physically independent circuits between the offsite' transmission-network and the-onsite Class IE distribution system, and b.
Two separate and independent diesel generators:
1.
Each with a separate day tank containing a minimum of 750 gallons'of fuel, and 2.
A fuel storage system consisting of two underground storage tanks each containing a minimum of 45,000 gallons of fuel (This is a shared system with Unit 2), and 3, ' A separate fuel transfer system.
]
APPLICABILITY:- MODES 1, 2, 3 and 4 ACTION:
}
a.
With one offsite circuit of 3.8.1.1.a inoperable, demonstrate the; OPERABILITY of the remaining A.C. sources by performing Surveillance
' Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 'at least once per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />s-thereafter.
If either EDG has not been successfully tested within-the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate its OPERABILITY,by performing:
Surveillance Requirement 4.8.1.1.2.a.4 -separately for each'such EDG -
within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit.to OPERABLE status within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s: or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> -
t and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one diesel generator -of 3.8.1.1.b inoperable, demonstrate the
'0PERABILITY of the A.C. offsite power sources 1by performing' Surveillance l
, Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once'per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the EDG became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE EDG by performing. Surveillance LRequirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *; restore the diesel generator -to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the'next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- This test is required to be completed regardless of when the inoperable EDG is restored to OPERABILITY.
NORTH ANNA - UNIT 1 3/4 8-1 Amendment No. S3,128 l
j-
e c
lsi i
s ELECTRICAL POWER SYSTEMS i
LIMITING CONDITION FOR OPERATION ACTION (Continued):
c.
With one offsite circuit and one diesel generator inoperable, demonstrate
-l the ~0PERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> i
thereafter; and if the EDG became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE EDG-by performing Surveillance ~
t l:
Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *; restore one of the inoperable -
,f sources to 0PERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be -in at 'least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the other A.C. power source (offsite-circuit or diesel generator) to 0PERABLE status in accordance with the provisions E
of Section 3.8.1.1 Action Statement a or b, as appropriate with the 1
time requirement of that Action Statement based on the time of initial loss of the remaining inoperable A.C. power source. A successful test E
of the diesel OPERABILITY per Surveillance Requirement 4.8.1.1 '2.a.4 l;
performed under this Action Statement for an OPERABLE diesel -or a restored to OPERABLE diesel satisfies the EDG-test requirement of Action Statement a or b.
p l
d.
With two of the required offsite A.C. circuits inoperable. demonstrate' the OPERABILITY. of two diesel generators by sequentially performing Surveillance Requirement 4.8.1.1.2.a.4 on both. diesels within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless.the diesel generators are already operating; restore one of-the. inoperable offsite sources to.0PERABLE tatus wtihin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be.in at least HOT STANDBY'wtihin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.. Following restora.
L tion of one offsite~.cource, follow' Action Statement-a with the time a
o requirement of that Action Statement based on the time of initial loss
'4 of the remaining inoperable offsite A.C. circuit. A successful test (s).
of diesel OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.4 performed under this Action Statement for.the OPERABLE diesels satisfies the EDG test requirement of Action Statement a.
j l
e.- l lith two of the above required diesel generators inoperable demonstrate' the OPERABILITY of two offsite A.C.. circuits by performing Surveillance '
h
' Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> L
thereafter; restore one of the inoperIble diesel generators to OPERABLE-1 status-within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next n
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in -COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Following restoration of.one diesel generator unit, follow Action Statement b with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable diesel generator. A successful test of diesel OPERABILITY per Surveillance Requirement l
4.8.1.1.2.a.4 performed under this Action Statement for a restored L
to OPERABLE. diesel satisfies the EDG test requirement of Action i
Statement b.
- This test is requirea to be completed regardless of when the inoperable EDG is restored to-OPERABILITY.
NORTH ANNA - UNIT 1 3/4 8-2 Amendment No.83
- j 3
y"..,
F 'ECTRICAL POWER SYSTEMS i
@nntnochrmeweene ATCN ACTION fCantimM).
r f.
With one underground fuel oil storage tank of 3.8.1.1.b.2 Inoperable for the :
_ performance of Surveillance Requirement 4.8.1.1.4 or for tank repairs:'.
- 1. -
Verify 45,000 gallons of fuel is available in the operable underground fuel oil storage tank at least once per.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,-
.2.
Verify a minimum of 100,000 gallons of fuel oli la maintained in the above-
- p ground main fuel oli storage tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, Verify an available source of fuel oil and transportation to supply 50,000 3.
gallons of fuel in less then a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, and-
- i t
, ^
4.
Restore the storage tank to' OPERABLE status within 7 days or place both Units in at least HOT STAND 8Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
4 o
l i
l i
.5 t
t NORTH ANNA UNIT 1 3/4 8 2a Amendment No.128
8 gipcTRICAL POWEH SYSTEMS I 'l '. g l qq
~
- 4.8.1.1.4 For each underground diesel generator fuel oil storage tank perform the--
following at'least once per 10 years:
1.
Drain each fuel oli storage tank 2..
Remove sediment from each fuel oil storage tank 3.-
' Inspect each fuel oil storage tank for Integrity..
l
'4.
Clean each fuel oil storage tank i
i i
-).
t
\\-
i o
)
i
'l 1
ti l.
- y
' i 'i
. 1 i
3 i
i t
NORTH ANNA UNIT 1 3/4 8 4d Amendment No. 128
.'=
o e=**g
..... L' FLECTalCAL POWER SYSTEMS
- SHl.IIDOWN 1&EH3CONDmONFERCPMATEN 3.8.1.2
. As a minimum, the following A.C. electrical power sources shall be OPERABLE:
g_
a.
One circuit between the offsite transmission network and the onsite Class IE distribution system.
=and.
b.
One diesel generator with:
- 1. -
A day tank containing a minimum volume of 750 gallons of fuel, 2.
A fuel storage system consisting of two underground storage tanks each containing a m;nimum volume of 45,000 gallons of fuel (This is a shared system with Unit 2), and t
3.'.
A fuel transfer syste,m.
~[
APPUCABILITY:
MODES 5 and 6.
- ACTION:
a.
With less than the above minimum required A.C. electrical power sources OPERABLE, suspend all l
operations involving CORE ALTERATIONS or positive reactivity changes until the minimum required A.C.
electrical power sources are restored to OPERABLE status.
.bc.
'With one underground fu'el oli storage tank of 3.8.1.2.b.2. Inoperable for the i
- performance; of Surveillance-Requirement 4.8.1.1.4 or for tank repairs:-
1.
' Verify 45,000 gallons of. fuel is available in the operable underground
- fuel oil storage tank at least:once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,-
2.
Verify a minimum of 100,000 gallons of fuel oil is maintained in the above g:
ground main fuel oil storage tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 3.
-_ Verify an available source of fuel oil and transportation.to supply 50,000
' gallons of fuel in less than a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, and 4.-
Restore the storage tank to OPERABLE' status within 7 days or place' both Units in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD
' SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, and perform ACTION a, above.
EfM3I ANTFm EEMENTS 4.8 1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1, 4.8.1.1.2. 4.8.1.1.3 and 4.8.1.1.4.
[
t i
NORTH ANNA UNIT 1 3/4 8 5 Amendment No. 77.$3,128, t
4 L
i
- ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS
- A.C. DISTRIBUTION - OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1' The following A.C. electrical busses shall be OPERABLE and.
energized with tie breakers open between redundant busses:
4160
. volt Emergency Bus # lH 4160 volt Emergency Bus # 1J 480 volt Emergency' Bus # 1H, 1H1 l
480 volt Emergency Bus # IJ, IJ1
- j 120 volt A.C. Vital Bus # l-I
(-
120-volt A.C. Vital Bus # l-II 120 volt A.C. Vital-Bus # l-III t
120 volt A.C. Vital Bus # 1-IV-
- APPLICABILITY: MODES -1, 2, 3 and 4
^CTION:
With less than the above complement of A.C. busses OPERABLE, restore the inoperable bus to OPERABLE,-status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at'least j
H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the l
following 30. hours.
l I
i SURVEILLANCE REQUIREMENTS f
- 4.8.2.1 The specified A.C. busses shall be determined OPERABLE with tie breakers open between redundant busses at least once per 7 days by verifying correct breaker alignment and indicated power availability.
i NORTH ANNA - UNIT 1 3/4 8-6 l
}
l,,,.,
- c
, t
='
[ '*. f# pen:g'h, UNITED STATES
-f.
m NUCLEAR REGULATORY COMMISSION wAnwwoTow, o. c. 20666 VIRGINIA ELECTRIC AND POWER COMPANY OLD DOMINION ELECTRIC COOPERATIVE DOCKET NO. 50-339 NORTH ANNA POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.112 License No. NPF-7 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Virginia Electric and Power Company, et al., (the Itcensee) dated March 26,=1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter it B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
Thereisreasonableassurance(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and-(ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health.and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part
)
51 of the Commission's regulations and all applicable requirements have been satisfied, i
i F
N
y-2 2.
Accordingly, the license is amended by changes to the technical Speci.
fications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-7 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 112, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of istuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION Herbert N. Berkow, Director
-Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: July 3.1990 I
1
)
4 I
"j
+
i j
I ATTACHMENT TO 1.ICENSE AMENDMENT NO.112 t
TO FACILITY OPERATING LICENSE NO. NPF-7 DOCKET NO. 50-339 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
The corresponding overleaf pages are also provided to maintain document completeness, pas 3/4 8-1 3/48-2a(new) 3/4 8 6a 3/4 8-10 f
G t
I b
n o
-. - s s.,
y
[
~l
{
3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES s
OPERATING
' LIMIT!NG CONDITION FOR OPERATION t
3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE.
I a.
Two physically independent circuits between the offsite transmission network and the onsite Clar,s lE distribution system, and b.
Two separate and independent diesel generators:
1.
Each with a separate day tank containing a minimum of 750 gallons of fuel, and 2.
A fuel storage system consisting of two un(erground storage tanks each containing a minimum of 45,000 gallons of fuel (This is a shared system with Unit 1), and 3.
A separate fuel transfer system.
l
{
APPLICABILITY:
MODES 1, 2, 3 and 4.
t r
ACTION:
a.
With on2 offsite circuit of 3.8.1.1.a inoperable, demonstrete the l
OPERABILITY of the remaining A.C. sources W performing Surveillance Requirement 4.8.1.1.1.4 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and A,t least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.
If either EDG has not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate its OPERABILITY by performing Surveil-lance Requirement 4.8.1.1.2.a.4 separately for each such EDG within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and-COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.
With one diesel generator of 3.8.1.1.b inoperable, demonstrate the OPERABILITY of the A.C. offsite power sources by performing Surveillance l
Requirement 4.8.1.1.1.4 within I hour and at least once per-8 hours thereafter; and if the EDG became inoperable due to any cause other than preolanned preventativo maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE EDG by performing Surveil.
lance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *; restore the diesel '
generator to OPEPABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- This test is required to be completed regardless of when the inoperable EDG is restored to OPERABILITY.
i NORTH ANNA - UNIT 2 3/4 8-1 Amendment No, gg',112, l
l
=
~
ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERAT!0N ACTION:
(Continued) c.
With one offsite circuit and one diesel generator inoperable, demon-strate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; and if the EDG beccme inoperable due to any cause other than ptaplanned preventative maintenance or t
testing, demonstrate the OPERABILITY of the remaining OPERABLE EDG by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *;
restore one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the other A.C.
powersource(offsitecircuitordieselgenerator)toOPERABLEstatus in accordance with the provisions of Section 3.8.1.1 Action Statement a or b, as appropriate with the time requirement of that Action State-ment based on the time of initial loss of the remaining inoperable A.C. power source. A successful test of diesel OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.4 performed under this Action Statement for an OPERABLE diesel or a restored to OPERABLE diesel satisfies the EDG test requirement of Action Statement a or b.
.i d.
With two of the required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by sequentially performing Surveillance Requirement 4.8.1.1.2.a.4 on both diesels within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the diesel generators are already operating; restore one of the H
inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Following restora-tion of one offsite source, follow Action Statement a with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable offsite A.C.. circuit. A successful test (s) of diesel OPERABILITY per Surveillance Requirement 4 8,1,1.2.a.4 performed under this Action Statement for the OPERABLE diesels satisfies the EDG test requirement of Action Statement a, With two of the above required diesel generators inoperable, demonstrate e.
the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Following i
restoration of one diesel generator unit, follow Action Statement b with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable diesel generator. A i
successful. test of diesel OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.4 performed under this Action Statement for a restored to OPERABLE diesel satisfies the EDG tcst requirement of Action State-ment b.
- This test is required to be completed regardless of when the inoperable EDG is restored to OPERABILITY.
NORTH ANNA - UNIT 2 3/4 8-2 Amendment No.g. 70 1;
+
si idTREAL POWER SYSTFM!t tunnenrmrunmsuww ACTION fConfiruimen*
f.
With one underground fuel oil storage tank of 3.8.1.1.b.2 Inoper ile lor the portormance of Surveillance Requirement 4.8.1.1.4 or for tank repairs:
1.
Verity 45,000 gallons of fuel is available in the operable underground fuel oil storage tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 2.
Verity a minimum of 100,000 gallons of fuel oil is maintained in the above ground main fuel oil storage tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 3.
Verity att available source of fuel oil and transportation to supply 50,000 gallons of fuel in less than a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, and 4.
Restore the storage tank to OPERABLE status within 7 days or place both Urlits in et least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
l' ll-1 i
(
l l'
R l
l i
i I
i NORTH ANNA. UNIT 2 3/4 8 2a Amendment No. 112 4
l
fu l
ELECTRICAL POWER SYSTEMS.
SURVEILLANCE REQUIREMENTS 4.8.1.1.3 (Continued) c.
At least once per 18 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration.
2.
The cell to-cell and terminal connections are clean, tight and coated with anti-corrosion material.
3.
The resistance of each cell-to-ell and terminal connection is less than or equal to 150 x 10- ohms.
4.
The battery charger will supply at least ten amperes at 125 volts l
for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
l d.
At least once per 60 months, during shutdown, by verifying that the i
battery capacity is at least 80% of the manufacturer's rating when subjected to a performance discharge test.
e.
At least once per 18 months, during shutdown, perform a performance '
discharge test of battery capacity if the battery shows signs of degradation or has reached 85% of its service life expected for the application. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average from previous performance discharge tests, or is below 90% of the manufacturer's rating.
4.8.1.1.4 For each underground diesel generator fuel oil storage tank perform f
the following at least once per 10 years:
~1.
Drain each fuel oil storage tank 2.
Remove sediment from each fuel oil storage tank 3.
Inspect each fuel oil storage tank for integrity 4
Clean each fuel oil storage tank t
i l
\\
{
NORTH ANNA - UNIT 2 3/4 8-6a Amendment No. 47,M, N' II2' l'
~
PE L
n e.
e TABLE 4.8 2 O!ESEL GENERATOR TEST SCHEDULE Number of Failures i
Number of Failures in in Last 100 Valid Last 20 Valid Tests
- Tests
- Test Frequency j
11 14 Once per 31 days 2
t 1 **
15 Once per 7 days
'i i
- Criteria for determining number of failures and number of valid tests shall be in' accordance with Regulatory Position C.2.e of Regulatory Guide 1.108, but determined on a per diesel generator basis.
i r
For the purposes of determining the required test frequency, the previous test failure count may be reduced to zero if a complete diesel overhaul to like-new conditions is completed, provided that the overhaul including i
appropriate post-maintenance operation and testing, is specifically approved by the manufacturer and if acceptable reliability has been demonstrated. The reliability criterion shall be the successful completion of 14 consecutive tests in a single series. Ten of these tests shall be in accordance with Surveillance Requirement 4.8.1.1.2.a.4; four tests, in accordance with i
Surveillance Requirement 4.8.1.1.2.c.
If this criterion is not satisfied during the first series of tests, any alternate criterion to be used to transvalue the failure count to zero requires NRC approval.
- The associated test frequency shall be maintained until'seven consecutive failure free demands have been performed and +.he number of failures in the 4
~
last 20 valid demands has been reduced to one.
r NORTH ANNA - UNIT 2 3/4 8-9 Amendment No. 48 0
i si safplEAf POWER SYSTggg
- M I MMIN FOROpsRATEN L
3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
a.
One circuit between the ottsite transmission network and the onsite Class IE distnbution system, and i
b.
One diesel generator with:
1.
A day tank containing a minimum volume of 750 gallons of fuel.
,j 2.
A fuel storage system constating of two underground storage tanks each f
containing a minimum volume of 45.000 gallons of fuel (This is a shared system l
with Unit 1), and 3.
A fuel transfer system.
(
APpuCA BillW:
MODES 5 and 6.
f l
ACTION:
a.
Whh less than the above minimum required A.C. electrical power sources OPERABLE suspend all l
operations involvin0 CORE ALTERATIONS or positive reactivity changes until the minimum required A.C.
electncal power sources are restored to OPERABLE status.
4 b.
With one underground fuel oil storage tank of 3.8.1.2.b.2 Inoperable for the performance of Surveillance Requirement 4.8.1.1.4 or for tank repairst l
1.
Verify 45,000 gallons of fuel is available in the operable fuel oil storage i
i tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 2.
Verify a minimum of 100.000 gallons of fuel oil le maintained in the above ground main fuel oil storage tank at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, 3.
Verify an available source of fuel oil and transportation to supply 50,000 gallons of fuel in less than a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, and 4.
Restore the storage tank to OPERABLE status within 7 days or place l
both Units in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLO I
SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, and perform ACTION a, above.
1 ME AMBr.fi s: Reds 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1. 4.8.1.1.2. 4.8.1.1.3 and 4.8.1.1.4.