MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp ML20137B9371997-03-18018 March 1997 Proposed Tech Specs,Revising TS Section 5.3.1,fuel Assemblies to Allow Use of Alternate Zr-based Fuel Cladding Matl ZIRLO ML20137B9141997-03-18018 March 1997 Proposed Tech Specs,Revising TS SR 4.5.2.c to Clarify When Containment Entry Visual Insp Is Required ML20134Q0811997-02-17017 February 1997 Proposed Tech Specs,Revising TS 1.7, Containment Integrity, TS 3/4.6.1, Containment Integrity & TS 3/4.6.3, Containment Isolation Valves 1999-09-02
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K8411999-09-0202 September 1999 Proposed Tech Specs Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band ML20210J1431999-07-29029 July 1999 Proposed Tech Specs Changes to ITSs ML20209D3651999-07-0808 July 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising Allowable Value for CTS Table 3.3-4,functional Unit 8.a.,4 Kv Undervoltage - Loss of Voltage & Functional Unit 8.b.,4 Kv Undervoltage - Grid Degraded Voltage ML20209C2081999-06-30030 June 1999 Proposed Tech Specs Re Temporary Change to CTS Without Action to Reduce Power ML20195G0331999-06-11011 June 1999 Proposed Tech Specs Pages,Revising TS 3.7.1.6 & Bases by Modifying LCO to Require Four ARVs to Be Operable, Eliminating Use of Required in Action Statements & Adding New Action for Three or More ARVs Inoperable ML20195F7961999-06-10010 June 1999 Proposed Tech Specs,Revising Z,S & Allowable Value Terms for Current TS Table 3.3-4,functional Unit 7.b,automatic Switchover to Containment Sump (RWST Level - Low-Low) ML20206Q9041999-05-11011 May 1999 Proposed Tech Specs 3/4.7.5, Ultimate Heat Sink, Proposing Addl Required Zcaion for Restoring Ultimate Heat Sink to Operable Status within Completion Time of 8 H ML20196K7321999-03-26026 March 1999 Proposed Tech Specs Converting to Improved Tech Specs ML20205A2111999-03-25025 March 1999 Markups of Current & Improved TS Re TS Conversion Application ML20207J2021999-03-0505 March 1999 Proposed Tech Specs Re Conversion to ITS Section 1,0,3.1, 3.2,3.3,3.4,3.6,3.7,3.8,3.9,4.0 & 5.0 ML20199G7281999-01-15015 January 1999 Proposed Tech Specs SR 4.7.3b Deleting During SD Requirement & Reflect Appropriate Plant Conditions in Associated 3/4.7.3 Bases ML20199F4511999-01-12012 January 1999 Proposed Tech Specs Pages Re Amend to License NPF-42, Revising TS 3/4.7.5 by Adding New Action Statement Requiring Verification of Operability of Two RHR Trains,Or Initiation of Power Reduction with Only One RHR Train Operable ML20198P1211998-12-29029 December 1998 Proposed Tech Specs to Incorporate Revised Heatup & Cooldown Limit Curves & Revised Cold Overpressure Mitigation Sys (COMS) PORV ML20207J9621998-12-18018 December 1998 Rev 1 to TRM for Wolf Creek Generating Station,Unit 1 ML20197H6701998-12-0808 December 1998 Proposed Corrected Tech Spec Page 4.0-2 Increasing Spent Fuel Storage Capacity ML20196G6161998-12-0202 December 1998 Proposed Tech Specs Section 3.3, Instrumentation ML20196B4901998-11-24024 November 1998 Proposed Tech Specs Pages & follow-up Items Re Proposed Conversion to TS Section 1.0,3.4,3.5 & 3.6,per 980828 RAI ML20195E7671998-11-10010 November 1998 Rev 0 to EPP 01-2.4, Core Damage Assessment Guidance ML20155H6121998-11-0606 November 1998 Proposed Tech Specs Bases 3/4.7.1.2 Re Afws ML20155H6841998-11-0606 November 1998 Proposed Tech Specs Pages,Revising TS Bases Section 3/4.4.4, Relief Valves ML20154S5911998-10-23023 October 1998 Proposed Tech Specs Sections 3.1, Reactivity Control Sys, 3.2, Power Distribution Sys, 3.4, RCS, 3.5, ECCS & 5.0, Administrative Controls ML20154S5721998-10-23023 October 1998 Proposed Tech Specs Section 3.5.1,increasing AOT in Action B. to 24 Hours in Lieu of Current AOT of One Hour ML20154R9321998-10-20020 October 1998 Proposed Tech Specs 3/4.3,changing ESFAS Functional Units 6.f,8.a & 8.b ML20153H0431998-09-24024 September 1998 Proposed Tech Specs Pages Re RAI on Application for Amend to License NPF-42,incorporating Changes to TS Sections 3.4 & 5.0 ML20236Y2771998-08-0505 August 1998 Proposed Tech Specs Sections 3.1,3.2,3.5,3.9 & 4.0 Converting to Improved Std Tech Specs ML20236R4781998-07-17017 July 1998 Proposed Tech Specs 3/4.7.5 Revising UHS by Adding Temporary New Action Statement ML20236G8321998-06-30030 June 1998 Proposed Tech Specs Re Section 3.6, Containment Sys ML20247F8611998-05-0808 May 1998 Proposed Tech Specs 3/4.3.2,Table 3.3-3,revising Functional Unit 7.b.,RWST Level low-low Coincident W/Safety Injection, by Adding New Action Statement ML20216J8291998-03-20020 March 1998 Proposed Tech Specs,Increasing Spent Fuel Storage Capacity & Increasing Max Nominal Fuel Enrichment to 5.0 W/O (Nominal Weight Percent) U-235 ML20202D1251998-02-0404 February 1998 Proposed Tech Specs 3/4.2.4 Re Quadrant Power Tilt Ratio ML20202C4561998-02-0404 February 1998 Proposed Tech Specs 3/4.3 Re Changes to ESFAS Functional Units 6.f,8.a & 8.b ML20199H3551998-01-28028 January 1998 Proposed Tech Specs 6.3 & 6.12,reflecting Position Change within Organization ML20198P5001998-01-15015 January 1998 Proposed Tech Specs Replacement Pages Clarifying Bases in 970-902 LAR Re Auxiliary Feedwater Sys ML20198Q9411997-11-0606 November 1997 Proposed Tech Specs Bases Section 3/4.8.1,3/4.8.2 & 3/4.8.3 for Installation of Spare Battery Chargers ML20217K2181997-10-17017 October 1997 Proposed Tech Specs 4.5.2b,revising Surveillance Requirement to Vent ECCS Pump Casings ML20217B6161997-09-19019 September 1997 Proposed Tech Specs Bases Section B3/4.9.2,adding Info Re Role of Source of Power Supplied to One Source Range Neutron Flux Monitor in Determining Operability of Monitor in Mode 6 ML20216F7311997-09-0606 September 1997 Proposed Tech Specs,Alleviating Need for Enforcement Discretion Granted by NRC on 970905 ML20216F6911997-09-0505 September 1997 Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d) ML20216D1551997-09-0202 September 1997 Proposed Tech Specs,Adding Requirements for Essential Svc Water Flowpaths to turbine-driven AFW Pump ML20196J4071997-07-29029 July 1997 Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation ML20141G7721997-07-0303 July 1997 Proposed Tech Specs Section 5.3.1 Incorporating Addl Info Into TS 6.9.1.9, Colr ML20151T0151997-05-15015 May 1997 Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs ML20198J6551997-05-15015 May 1997 Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys ML20154Q2441997-05-15015 May 1997 Proposed Improved TS Section 3.7, Plant Sys ML20195J8241997-05-15015 May 1997 Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity ML20138F3371997-04-30030 April 1997 Rev 0 to Offsite Dose Calculation Manual ML20138B9121997-04-23023 April 1997 Proposed Tech Specs,Revising TS 3/4.9.4 Containment Bldg Penetrations & Associated Bases Section to Allow Selected Containment Isolation Valves to Be Opened Under Administrative Controls During Periods of Core Alterations ML20137X3371997-04-15015 April 1997 Proposed Tech Specs 6.8.5.d Re Reactor Coolant Pump Flywheel Insp Program ML20147F8241997-03-21021 March 1997 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insp Program ML20137C2031997-03-19019 March 1997 Proposed Tech Specs Bases Pp Reflecting Corrections to Ref Made on Those Pp 1999-09-02
[Table view] |
Text
n O! f
- o,- .
n:-
7 .
- e;; ,
ij g ;.!' .
4 Attachment IV'to ET 90,0104 y- . .
Page 1.of:4 u,
o i
'4
'ATTACIBSNT IV PROP 0'3D TECENICAL SPECIFICATION CHAINES o
i k _,
,1.,. ;
ll g y u-k r
?
<s c
k i
1
'Ii b
s
'rk s, Y
0 900 ~/ 09003'4 700702 PDR ADOct 05000482 p PDC -
4 4
. 1 'I . I <' ,
Attachment IV to ET 90-0104
. Page 2 of 4 APPLICABILITY (
SURVEILLANCE REQUIREMcHTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified 44 : '-t:rv:1 with-
! 2.
^interval, r hum-alle but
- ble c*tentice net te e*ee:d 25% cf-th: :urv illene:
- b. 'h: ::: bin:d ti : inteevel fer-any-thee: : n;::utiv -serv illene -
j}';}((}]: Ch:l' :t :::::d 3. 25 t4::: th :p::i' icd surveillene,-
4.0.3 Failure to perform a Surveillance Requirement vithin the specified time interval shall constitute a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation. Exceptions to these requirements are stated in the individual specifications. Surveillance Requirements do not have to be- performed on inoperable equipment.
4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement (s) associated with the ' Limiting '
Condition for Operation have been performed w.ithin the stated surveillance interval or as otherwise specified.
"' 4.0.5 Surveillance Requirements for inservice inspe'ction and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows:
- a. Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR Part 50, Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR Part 50, Section 50.55a(g)(6)(i);
surveillanceintervalwitheamaximumallowableextensionnotto exceed 25% of the specified interval.
(\
WOLF CREEK - UNIT 1 3/4 0-2
,1 LAttachmentWV to ET 90-0104 Page 3 of 4 -
APPLICABILITY. ,
( ;
BASES-
- The intent of_this provision is to ensure that facility operation is not i initiated with either required equipment or systems inoperable or otler specified
. limits being exceeded.
Exceptions to this provision have been provided for a limited number of ,
specifications when startup with inoperable equipment would not affect plant safety. These exceptions are stated in the ACTION statements of the appropriate specifications.
4.0.1 This specification provides that surveillance activities necessary ,
to insure.the Limiting Conditions _for Operation are met and will be performed during the OPERATIONAL MODES or other conditions for which the Limiting Condi-tions for Operation are applicable. Provisions for additionalLsurveillance activities,to be performed without> regard'to the applicable OPERATIONAL' MODES or other conditions are provided in the individual Surveillance Requirements. 5 L
Surveillance Requirements for Special Test Exceptions need only be performed when the.Special Test Exception'is being utilized as an exception to an .
> individual specification. '
GnsertB . _
4.0.2 7 p
' rfer-ilg,msurveillance p.s.ieivne efacti'vities this specificetica beyond those prcvide elloweble specified in the.notclarence- v L yurvel inter' val: .These tolerances are necessary to1provi . rational '
(' .
flexibility bec f scheduling and performance consid .n s . .The phrase '
L. - at least" as'sociated w urveillance frequen es not: negate this -
i
[. 111owable-tolerance value and p the reance of more'1'requent' i urveillance-activities. .
The tolerance v , taken either individually or utively over' s, are sufficiently-restrictive to ensure tha three test'i , reliability
.tssoc with the surveillance; activity is not significpntly degraded
..- ;bteia:d fre; the neminal specified interv:1. ~ ,
E ;
L 4.0.3 The provisions of this specification set forth t5e' criteria for
?determi~ nation of compliance with the OPERABILITY requirements of the-Limiting Conditions for Operation. Under these criteria, equipment, systems or components ;
are assumed to be OPERABLE-if the associated surveillance activities have been.
satisfactorily performed within the specified time interval. Nothing in this-provision is to be construed as defining equipment, systems or' components OPERABLE, when such items are found or known to be inoperable although still ;
meeting the Surveillance Requirements. Items may be determined inoperable during use, during surveillance tests or in accordance with-this specifica-i tion.. Therefore, ACTION statements are entered when the Surveillance Require-
, . ments; should have been performed rather than at the time it is discovered
- that the tests were not performed.
L 4.0.4 This specification ensures that the surveillance activities associated with a Limiting Condition for Operation have been' performed within the, specified time interval prior to entry into an OPERATIONAL MODE or other {
7 WOLF CREEK - UNIT 1 B 3/4 0-2
{
' ' - ~
q Attabbment IVito ET- 90-0104 u Page,4 of 4 ,
I Insert &
J L Specification 4 '. 0 . 2 establishes the limit for which- the specified L time interval for Surveillance Requirements may be extended.- It permits,an allowable extension of- the normal ' surveillance interval to ' facilitate L
surveillance scheduling and consideration of plant operating conditions that L .may not be suitable for conducting the surveillances e.g., transient conditions or other ongoing surveillance or maintenance activities. It also
~
L j provides flexibility to accommodate the' length of a fuel cycle for- ,
l surveillances that are performed at each= refueling outage and are specified- ,
D = with an 18 month surveillance interval. It is not intended that- this L . provision be- used repeatedly as a convenience _to: extend survefilance' ,
intervals beyond that specified for surveillances that 'are 'not performed ;
during refueling outages. The limitation of Specification 4.0.2 is based on engineering judgement and the recognition that.the most probable result of L any. particular survalliance being performed is. the verification of .
conformance with the Surveillance Requirements. This provision is- -f sufficient' to ensure that the reliability ensured through surveillance s activities is not'significantly degraded beyond- that obtained from the specified surveillance interval. ,
1, i
i 1
.-i' s
l
_____________m _.__ _____ _ E-__ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ m____ _ _E_____