ML20055C340 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 02/13/1990 |
From: | Morris D COMMONWEALTH EDISON CO. |
To: | |
References | |
PROC-900213, NUDOCS 9003020202 | |
Download: ML20055C340 (109) | |
Similar Documents at Dresden | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211C3311999-04-30030 April 1999
[Table view]Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205A0871999-03-22022 March 1999 Revs to Odcm,Including Rev 2.0 to Chapter 10, Radioactive Effluent Treatment & Monitoring & Rev 1.9 to Chapter 12, Radiological Effluent Technical Stds (Rets) ML20199E0361999-01-12012 January 1999 Proposed Tech Specs Section 3.10, Fuel Handling & Storage, Eliminating Reference to Initiation of Generating Station EP Action That Is Incorrect & Not Part of Reason for Min FSP Water Level TS ML20196F6451998-11-30030 November 1998 Proposed Tech Specs 3/4.1.A,3/4.10.B & 3/4.12.B,proposing Changes to Relocate Requirement to Remove RPS Shorting Links Which Enable non-coincident Scram for Neutron Instrumentation,To Licensee Controlled Document ML20237A8651998-08-0707 August 1998 Qualified Unit 1 Supervisor Initial & Continuing Training Program ML20151S2691998-07-31031 July 1998 Rev 1.8 to Chapter 12 of Dresden Station Odcm ML20217N9331998-04-30030 April 1998 Rev 1.7 to Chapter 12 of Dresden Station Odcm ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20216H8551997-12-31031 December 1997 Revs to OCDM for Dresden Station,Including Rev 1.9 to Chapter 10,rev 1.3 to Chapter 11,rev 1.6 to Chapter 12 & Rev 1.1 to App F ML20198M2491997-12-18018 December 1997 Revs to Ocdm,Including Rev 1.3 to Chapter 11, Radiologicial Environ Monitoring Program & Rev 1.6 to Chapter 12, Radiological Effluent Technical Stds (Rets) ML20216H8241997-10-31031 October 1997 Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App F ML20216H9041997-10-31031 October 1997 Revs to OCDM for Zion Station,Including Rev 1.9 to Chapter 10,rev 1.1 to Chapter 11,rev 1.9 to Chapter 12 & Rev 1.1 to App F ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20212A2941997-10-0202 October 1997 Rev 56 to Dresden Nuclear Power Plant for Insertion in NRC Security Plan.Rev Withheld ML20216C6381997-08-29029 August 1997 Proposed Tech Specs,Incorporating New Siemens' Methodologies That Will Enhance Operational Flexibility & Reducing Likelihood of Future Plant Derates ML20196G8781997-07-18018 July 1997 Proposed Tech Specs,Meeting Administrative Commitment Resulting from from Plant TS Improvement Program ML20148K6141997-06-0505 June 1997 Proposed Tech Specs,Updating Revised TS to Format Consistent W/Recently Approved TS Upgrade for DNP & Proposed Other Miscellaneous Changes Re Decommissioning Status of Unit 1 ML20141A6411997-05-31031 May 1997 Rev 1.4,Chapter 12 to Radiological Effluent Technical Stds (RETS) of ODCM ML20216H8691997-03-31031 March 1997 Revs to OCDM for LaSalle Station,Including Rev 1.8 to Chapter 10,rev 1.9 to Chapter 11,rev 1.8 to Chapter 12 & Rev 1.7 to App F ML17187A7991997-02-17017 February 1997 Proposed Tech Specs 3/4.7.K & 3/4.8.C Re Issues Resulting from Comeds Efforts to Reconstitute Design Basis of Chrs ML20137C0011997-01-31031 January 1997 Odcm,Dresden Annex Revs 1.9 to Chapter 10, Radioactive Effluent Treatment & Monitoring, 1.2 to Chapter 11, Radiological Environ Monitoring Program & 1.3 to Chapter 12, Radiological Effluent Technical Standards ML20135B0581996-11-25025 November 1996 Proposed Tech Specs,Submitting Update to Administrative Controls Section of TS Which Reflects Transition of Overall Corporate Responsibility for Storage of Spent Nuclear Fuel ML20129F3231996-10-23023 October 1996 Proposed Tech Specs Replacing All Existing Pages of Unit 1 TS ML20129C2391996-10-16016 October 1996 Proposed Tech Specs for Dresden 2 & 3 & Quad Cities 1 & 2, marked-up to Show Transition Verbiage ML20129D3981996-09-20020 September 1996 Proposed Tech Specs 3/4.6.K,updating Pressure-Temp Curves to 22 Effective Full Power Yrs & TS Bases ML20216H8841996-06-30030 June 1996 Revs to ODCM for Quad Cities,Including Rev 1.8 to Chapters 10,11,12 & App F ML20113B6001996-06-20020 June 1996 Proposed Tech Specs,Incorporating New NRC Approved Thermal Limit Licensing Methodology in List of Approved Methodologies Used in Establishing Thermal Limits in Cycle Specific COLR & Change to Fuel Assembly Design Features ML20112E6341996-05-22022 May 1996 Proposed Tech Specs Requesting Emergency Amend to License DPR-25 Temporarily Modifying Description of Certain Corner Room Steel Supports to Match Current Configuration Until Mod During Next Refueling Outage ML20086D4741995-06-30030 June 1995 Proposed Tech Specs Re TS Upgrade Program for Dresden Units 2 & 3 & Quad Cities Units 1 & 2 ML20092C8091995-05-12012 May 1995 Rev 2, Shroud Repairs Program for Dresden Units 2 & 3, Back-up Calculations for RPV Stress Rept Number 25A5691, May 1995 ML20087H8651995-05-0202 May 1995 Proposed Tech Specs Re TS Upgrade Program Section 3/4.10 ML20085M6171994-07-31031 July 1994 Rev 1.1 to Chapter 12, Radioactive Effluent Technical Stds of Dresden ODCM ML20063F9011994-01-31031 January 1994 Rev 1.0 to Chapters 10,11,12 & App F to Odcm,Dresden Station Units 2 & 3 ML17179B0931993-09-10010 September 1993 Rev 2 to Dresden Station 3rd Interval IST Plan, Sections 2,13 & 14,pages 2-1,13-1 to 13-4 & 14-40,respectively ML20058E8751993-09-0303 September 1993 Revised AOP-6.3, Loss of RHR Shutdown Cooling ML20058E8351993-06-10010 June 1993 Revised AOP-7.4, Control Room Inaccessibility ML20127D0691992-12-30030 December 1992 Corporate Emergency Response Organization Required Reading Package 92-11 ML20125D6381992-12-0808 December 1992 Proposed Tech Specs 3/4.1 Re Reactor Protection Sys ML20058E8681992-09-29029 September 1992 Rev 56A to AOP 1BOA PRI-5, Control Room Inaccessibility Unit 1 ML20106A6221992-09-15015 September 1992 Proposed TS 2.0, Safety Limits & Limiting Safety Sys Settings & 3/4.11, Power Distribution Limits ML20081M1251992-08-31031 August 1992 Rev 17 to Procedure Dgp 03-04 Control Rod Movements ML20099D7791992-07-29029 July 1992 Proposed Tech Specs Sections 1.0, Definitions, 3/4.0, Applicability & 3/4.3, Reactivity ML20096F1161992-04-24024 April 1992 Proposed Ts,Changing OL Section 2.G Re Reporting Requirements ML20081M1851992-01-31031 January 1992 Rev 17 to Procedure DAP 07-02, Conduct of Shift Operations ML20081M1611991-11-20020 November 1991 Rev 0 to Procedure DAP 14-4, Control Rod Sequences ML20058E8761991-11-18018 November 1991 Rev 56 to AOP Bwoa PRI-10, Loss of Rh Cooling Unit 1 ML20081M0311991-11-15015 November 1991 Rev 2 to Procedure Doa 0300-12, Mispositioned Control Rod (W-2,W-3) ML20081M1721991-08-31031 August 1991 Rev 15 to Procedure DAP 07-01, Operations Dept Organization ML20081M1401991-05-17017 May 1991 Rev 6 to Procedure DOP 0400-02, Control Rod Minimizer ML20081M1971990-08-30030 August 1990 Rev 9 to Procedure DAP 07-05, Operating Logs & Records 1999-04-30 Category:TEST/INSPECTION/OPERATING PROCEDURES MONTHYEARML20211C3311999-04-30030 April 1999
[Table view]Rev 2.0 to Generic ODCM for Dresden,Quad Cities,Zion, Lasalle,Byron & Braidwood ML20205A0871999-03-22022 March 1999 Revs to Odcm,Including Rev 2.0 to Chapter 10, Radioactive Effluent Treatment & Monitoring & Rev 1.9 to Chapter 12, Radiological Effluent Technical Stds (Rets) ML20237A8651998-08-0707 August 1998 Qualified Unit 1 Supervisor Initial & Continuing Training Program ML20151S2691998-07-31031 July 1998 Rev 1.8 to Chapter 12 of Dresden Station Odcm ML20217N9331998-04-30030 April 1998 Rev 1.7 to Chapter 12 of Dresden Station Odcm ML20216H4321997-12-31031 December 1997 Revs to OCDM for Braidwood,Including Rev 1.8 to Chapter 10, Rev 1.9 to Chapter 11,rev 2 to Chapter 12 & Rev 2 to App F ML20216H8551997-12-31031 December 1997 Revs to OCDM for Dresden Station,Including Rev 1.9 to Chapter 10,rev 1.3 to Chapter 11,rev 1.6 to Chapter 12 & Rev 1.1 to App F ML20198M2491997-12-18018 December 1997 Revs to Ocdm,Including Rev 1.3 to Chapter 11, Radiologicial Environ Monitoring Program & Rev 1.6 to Chapter 12, Radiological Effluent Technical Stds (Rets) ML20216H9041997-10-31031 October 1997 Revs to OCDM for Zion Station,Including Rev 1.9 to Chapter 10,rev 1.1 to Chapter 11,rev 1.9 to Chapter 12 & Rev 1.1 to App F ML20216H8241997-10-31031 October 1997 Revs to OCDM for Byron Station,Including Rev 1.3 to Chapter 10,rev 1.5 to Chapters 11 & 12 & Rev 1.3 to App F ML20198P1601997-10-20020 October 1997 Rev 1.5 to Odcm,Chapter 12 ML20212A2941997-10-0202 October 1997 Rev 56 to Dresden Nuclear Power Plant for Insertion in NRC Security Plan.Rev Withheld ML20141A6411997-05-31031 May 1997 Rev 1.4,Chapter 12 to Radiological Effluent Technical Stds (RETS) of ODCM ML20216H8691997-03-31031 March 1997 Revs to OCDM for LaSalle Station,Including Rev 1.8 to Chapter 10,rev 1.9 to Chapter 11,rev 1.8 to Chapter 12 & Rev 1.7 to App F ML20137C0011997-01-31031 January 1997 Odcm,Dresden Annex Revs 1.9 to Chapter 10, Radioactive Effluent Treatment & Monitoring, 1.2 to Chapter 11, Radiological Environ Monitoring Program & 1.3 to Chapter 12, Radiological Effluent Technical Standards ML20216H8841996-06-30030 June 1996 Revs to ODCM for Quad Cities,Including Rev 1.8 to Chapters 10,11,12 & App F ML20092C8091995-05-12012 May 1995 Rev 2, Shroud Repairs Program for Dresden Units 2 & 3, Back-up Calculations for RPV Stress Rept Number 25A5691, May 1995 ML20085M6171994-07-31031 July 1994 Rev 1.1 to Chapter 12, Radioactive Effluent Technical Stds of Dresden ODCM ML20063F9011994-01-31031 January 1994 Rev 1.0 to Chapters 10,11,12 & App F to Odcm,Dresden Station Units 2 & 3 ML17179B0931993-09-10010 September 1993 Rev 2 to Dresden Station 3rd Interval IST Plan, Sections 2,13 & 14,pages 2-1,13-1 to 13-4 & 14-40,respectively ML20058E8751993-09-0303 September 1993 Revised AOP-6.3, Loss of RHR Shutdown Cooling ML20058E8351993-06-10010 June 1993 Revised AOP-7.4, Control Room Inaccessibility ML20127D0691992-12-30030 December 1992 Corporate Emergency Response Organization Required Reading Package 92-11 ML20058E8681992-09-29029 September 1992 Rev 56A to AOP 1BOA PRI-5, Control Room Inaccessibility Unit 1 ML20081M1251992-08-31031 August 1992 Rev 17 to Procedure Dgp 03-04 Control Rod Movements ML20081M1851992-01-31031 January 1992 Rev 17 to Procedure DAP 07-02, Conduct of Shift Operations ML20081M1611991-11-20020 November 1991 Rev 0 to Procedure DAP 14-4, Control Rod Sequences ML20058E8761991-11-18018 November 1991 Rev 56 to AOP Bwoa PRI-10, Loss of Rh Cooling Unit 1 ML20081M0311991-11-15015 November 1991 Rev 2 to Procedure Doa 0300-12, Mispositioned Control Rod (W-2,W-3) ML20081M1721991-08-31031 August 1991 Rev 15 to Procedure DAP 07-01, Operations Dept Organization ML20081M1401991-05-17017 May 1991 Rev 6 to Procedure DOP 0400-02, Control Rod Minimizer ML20081M1971990-08-30030 August 1990 Rev 9 to Procedure DAP 07-05, Operating Logs & Records ML20058E8601990-04-30030 April 1990 Rev 55 to AOP 1BOA PRI-10, Loss of Rh Cooling Unit 1 ML20055C3401990-02-13013 February 1990 Revised Dssp Procedures,Consisting of Rev 2 to Dssp 100-B, Rev 2 to Dssp 100-B1 & Rev 3 to Dssp 100-A2/B2 ML20245L7651989-08-0707 August 1989 Rev 0 to Offsite Dose Calculation Manual ML20150C1171988-02-29029 February 1988 Rev 1 to Dresden Nuclear Power Station Process Control Program ML20237J8081987-08-31031 August 1987 Rev 0 to Emergency Plan Implementing Procedure EPIP 200-T4, Containment Radiation Time Dependent Correction Factors ML20235S3091987-07-31031 July 1987 Rev 0 to NSHP-RP Guidance 1100-2, Radiation Chemistry Foremen Shift Coverage ML20205C8311986-04-30030 April 1986 Rev 11A to Offsite Dose Calculation Manual ML20203L3551986-04-30030 April 1986 Rev 0 to Comm Ed Training Program Description for Station Control Room Engineer/Shift Technical Advisor ML20099D0241984-09-30030 September 1984 Rev 7 to Dts 1600-7, Unit 2/3 Integrated Primary Containment Leak Rate Test ML20090H7611984-03-31031 March 1984 Procedure INPO 84-010(NUTAC), Vendor Equipment Technical Info Program ML20070J0071982-10-0101 October 1982 IE Bulletin 79-14 & Tap Piping Evaluation,Quad Cities Units 1 & 2 & Dresden Units 2 & 3, Revision 0 ML20070H9951982-09-30030 September 1982 EDS-NUTECH Interface Control Instructions, Revision 0 ML20199E3821982-07-0707 July 1982 Rev 0 to Emergency Plan Implementing Procedure EPIP 500-9, Operational Check of Notification Phone List ML20062B4351982-07-0707 July 1982 Public Version of Revision 2 to Emergency Plan Implementing Procedure EPIP 100-C7, Security Director & Revision 0 to EPIP 500-9, Operational Check of Notification Phone List ML20062B1761982-06-30030 June 1982 Public Version of Revision 2 to Emergency Plan Implementing Procedure EPIP 100-C8, Rad/Chem Director. Revised Index of Station Group Director Duties Encl ML20054J8691982-06-0202 June 1982 Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures, Including Revision 2 to Procedure ED-3 Re Demand Polling of Meteorological Data ML20054H4291982-05-28028 May 1982 Public Version of Generating Stations Emergency Plan Telephone Directory ML20054H1521982-05-28028 May 1982 Public Version of Generating Stations Emergency Plan Telephone Directory 1999-04-30 |