ML20055C139
| ML20055C139 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/22/1982 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML20055C140 | List: |
| References | |
| NUDOCS 8208100271 | |
| Download: ML20055C139 (2) | |
See also: IR 05000255/1982015
Text
.
.
.
gut 2 21982
Docket No. 50-255
Consumers Power Company
ATTN:
Mr. R. B. DeWitt
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI 49201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
B. L. Jorgensen and J. K. Heller of this office on June 1-30, 1982, of
activities at the Palisades Nuclear Genterating Plant authorized by
NRC Provisional Operating License No. DPR-20 and to the discussion of
our findings with Mr. R. W. Montross and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A writt en response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five (25) days from
the date of this letter a written application to this office to withhold such
information.
If your receipt of this letter has been delayed such that less
than seven (7) days are available for your review, please notify this office
promptly so that a new duc date may be established.
Consistent with Sec-
tion 2.790(b)(1), any such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
sought to be withheld, and which contains a full statement of the reasons which
are the bases for the claim that the information should be withheld from pub-
lic disclosure. This section further requires the statement to address with
8208100271 820722
DR ADOCK 05000255
fqj
.
. , -
Consumers Power Company
2
specificity the considerations listed in 10'CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit. . If we do not hear from you in this regard within the
specified periods noted above, a copy of this letter, the enclosures, and your
response to this letter will be placed in the Public Document Room.
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
y
R. C. Knop, Chief
Projects Branch 1
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
' No. 50-255/82-15(DPRP)
cc w/encls:
D. J. VandeWalle, Nuclear
Licensing Administrator
R. W. Montross, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
,
l
J
RIII
7
RIII
&c/b
,
Boyd/ m
Kn'op
7/21/82
)
.
. . .
. . _
. - - . . -
.
. . - . -
-
- - -
.
.
- --