ML20055C109

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/82-32 on 820603-0702.No Noncompliance Noted
ML20055C109
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/29/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20055C110 List:
References
NUDOCS 8208100240
Download: ML20055C109 (2)


See also: IR 05000373/1982032

Text

l

-

.

. --. .

p 9. 9 #

Docket No. 50-373

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety-inspection conducted by Messrs. R. Lanksbury,

F. Maura, and D. Robinson of this office on June 3, 7-11, 17, 18, 23-25, July 1

and 2, 1982, of activities at the LaSalle County Nuclear Station, Unit 1

authorized by NRC Operating License No. NPF-11 and to the discussion of our

findings with Mr. R. Holyoak and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room. If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

I to file a request for withholding; and (b) submit within' twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information. If your receipt of'this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

,

which identifies the document or part sought to be withheld, and which

l contains a full statement of the reasons which are the bases for the

{

l

!

l

l

l -

c ,3

8208100240 820729 C Ul

! PDR ADOCK 05000373 -

I

l G PDR _

L

7

.

.

Commonwealth Edison Company 2 Mb

claim that the informatica should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we'do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

f <-

W. S. Little, Chief

Engineering Programs Branch

Enclosure: Inspection Report

No. 50-373/82-32(DETP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

D. L. Shamblin, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

' Assistant Attorney General

!

.

!

i

j RIII RIII RIII RIII RII

l

'

t a/sv La ksbury oki$on E iw Walker * Littl

7/12/82

l

i