Text
l
"
.
IE HQ FILE COPY
JUL 2 21982
Docket No. 50-440
The Cleveland Electric Illuminating
Company
NITN: Dalwyn R. Davidson
Vice President - System
Engineering and Construction
Post Office Box'5000
Cleveland, OH 44101
Gentlemen:
This refers to the initial management meeting and initial radiation protection
inspection conducted by Mr. D. E. Miller of this office on July 6-9, 1982, of-
activities at Perry Nuclear Power Plant, Unit 1, authorized by NRC Construction
Permit No. CPPR-148 and to the discussion of our findings with Mr. J. Waldron
and others of your staff at the conclusion of the inspection.
The initial management meeting was conducted to discuss the preoperational
and routine cperational inspection program concerning radiation protection
and radwaste management.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
!
examination of procedures and representative records, observations, and in-
terviews with personnel.
,
No items of noncompli.ince with NRC requirements were identified during the
course of this inspection.
'
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
0
f$
"
8208100237 820722
PDR ADOCK 05000440
0
m
.
_
Cleveland Electric Illuminating
2
JUL 2 21982
Company
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further. requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed by J. R.Milloc
J. R. Miller, Chief
Technical Inspection Branch
Enclosure:
Inspection Report
No. 50-440/82-07(DETP)
cc w/ encl:
J. Waldron, Plant Manager
L. Beck, General Supervisor
Licensing and Fuels
Management
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Danici D. Vilt, Attorney
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Department of Health
9
/
RIII
RIII
RIII
A,,sv
d&
<
.
7/21/82
l(eAnd
7/28'
/
g P.2