ML20055B997

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-352/82-09 & 50-353/82-07 on 820526-28 & 0602-04.No Noncompliance Noted
ML20055B997
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/23/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20055B998 List:
References
NUDOCS 8208100026
Download: ML20055B997 (2)


See also: IR 05000352/1982009

Text

r

,

.

JUL 3 31092

Docket Nos. 50-352/50-353

Philadelphia Electric Company

ATTN: Mr. John S. Kemper

Vice President

Engineering and Research

2301 Market Street

Philadelphia, PA 19101

Gentlemen:

Subject:

Inspection Nos. 50-352/82-09; 50-353/82-07

This refers to the routine safety inspection conducted by Messrs. A. Varela

and R. Paolino of this office on May 26-28 and June 2-4, 1982 at the Limerick

Generating Station, Units 1 and 2, Limerick, Pennsylvania of activities

authorized by NRC License Nos. CPPR-106 and CPPR-107 and to the discussions of

our findings held by Messrs. Varela and Paolino with J. M. Corcoran of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

'

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the require

,

l

ments of 2.790(b)(1).

The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

,

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

original signo.1 ty:

d,

b

homas T. Martin, Director

) Division of Engineering and Technical

Programs

Enclosure: NRC Region I Inspection Report Numbers 50-352/82-09 and 50-353/82-07

0FFICIAL RECORD COPY

l

e20sioco26 820723

PDR ADOCK 05000352

,

l

G

PDR

'

- ~ .-

.-

--

-

__

.

I

..

.

Philadelphia Electric Company

2

cc w/ encl:

V. S. Boyer, Senior Vice President, Nuclear Power

Troy B. Conner, Jr. , Esquire

Eugene J. Bradley, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information_ Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encl)

E. C. McCabe

RI:DETP

R1:DETP

h' R1:DETP

Paolino/wb-

OurrM-

Ebn

D /12/82

7,$ysv

0FFICIAL RECORD COPY