Forwards IE Insp Repts 50-445/82-09 & 50-446/82-04 on 820427-0527.No Noncompliance Noted
ML20055B895
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/06/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20055B896 List:
References
NUDOCS 8207230503
Download: ML20055B895 (2)


See also: IR 05000445/1982009

Text

-

<!W

.

!All 6 1982

Dockets: 50-445/82-09

50-446/82-04

Texas Utilities Generating Cogany

ATTH: Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

D .las, Texas 75201

Gentlemen:

.

This refers to the inspection conducted by Messrs. J. R. Boardman, C. E.

Johnson, and R. T. Redano of our staff during the period April 27 to

May 27, 1982, of activities authorized by HRC Construction Permits CPPR-126

and CPPR-127 for the Comanche Peak facility, Units 1 and 2, and to the dis-

cussion of our findings with Mr. R. G. Tolson and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of the inspection, no violations or deviations were identi-

fied.

Two new unresolved items disclosed during the inspection are discussed in

paragraph 7.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter. Such application must be consistent with the require-

'

mentsof2.790(b)(1).

4'0

8207230503 820706

PDR ADOCK 05000445

G PDR

OFFICE).R,PS-B, t,tf. M S.- B. . .b . h., N S.-A../ BP.62.(d.. RPBl.J.P. ..DRRP&ERgf .

. ../.RAnRIV

sumam p B ardman/sm

6/28/82"

WAC

16/;f 82"

- os[sman DMHtMnicutt

6/2.9/82" "6?4y/82' '"5/i(/82'/ 673[f/82'

TP#cfterman

JEGagliardo 70TCollin

'd/"/;8EF's W

. .. .. .. ........ .. ...... . ... .......... . ~ . . ~ ~ . ~ . . . ~ . ~ ~ ~

' '6TlJ82]

(4 . ~ . . ' s . - 9. '"'

'

NRC FORM 318 (1080) NRCM O240 OFFICIAL RECORD COPY

~

.

.

Texas utilities Generating Company -2-

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

(

Sincerely,

painal Signed by:

W. & CROSSMAN"

.[G.L.Hadsen, Chief

Reactor Project Branch 1

'

Enclosure:

Appendix - NRC Inspection Report 50-445/82-09

50-446/82-04

cc w/ enclosure:

Texas Utilities Generating Company

ATTN: H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas 75201

bcc to DMB for dist. N4"M bec dist by RIV

BC NRR/DHFS Regional Administrator

PM NRR/0LB RRI

AE0D RAD ASMT BR Section Chief

ELD RESEARCH Enforcement Assistant

IE FILE LPDR MIS Section

IE/RPRIB NSIC TP Branch

NRC PDR NTIS RPB-1

RPB-2 Files

C. E. Wisner

Texas Dept. of Health Resources

J. R. Boardman

C. E. Johnson

R. Redano

Mrs. Juanita Ellis

David Preister

Mr. Richard Fouke

OFFICt k , , , , , , , ,

'"""*"' >

.... . .. .. .. . ... . . . . . . . . . .. . . . ...

    • "> ........ . . .. ... ........ . .. . . ...... .. . .. . .. . . . . ..

"" " ' " " ' ' ' ' ' " * ' " " ' " " OFFICIAL RECORD COPY

, e

~t' w,- -

7