Determines That Further Analysis & Clarification Is Required to Complete Response to NRC Per IE Insp Re Testing of Containment Penetrations.Requested Info Will Be Provided by 820416
ML20055B729
Person / Time
Site: Satsop
Issue date: 03/23/1982
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO3-82-273, NUDOCS 8207230211
Download: ML20055B729 (1)


Text

-

4)

' 'l Washington Public Power Supply System Box 1223 Efma Washington 98541 (206)482-4428 Docket Numbers 50-508 and 50-509 March 23, 1982 G03-82-273 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 i

Attention:

Mr. T. W. Bishop Chief, Reactor Construction Projects Branch

Subject:

NRC INSPECTION AT WNP-3/5 IE REPORT NO. 50-508, 509/81-14 NONCOMPLIANCE (50-508, 509/81-14/01)

TESTING 0F/ CONTAINMENT PENETRATIONS

References:

1.' G03-81-2666, dated December 23, 1981, Mr. R. S.

Leddick to Mr. B. H. Faulkenberry, NRC Inspection at WNP-3/5.

2.

NRC Letter, dated February 22 dr. B. H.

Faulkenberry to Mr. R. S. Ledo..., same subject.

Reference 1 provided your office with a report of corrective / preventive actions for the subject violation (Failure to assure containment pene-trations No. 23, 24 & 44 are tested in accordance with code requirements).

Upon review of the report, it was determined that additional information was required by your office to complete the NRC evaluation of the cor-i rective actions. As a result, Reference 2 outlined NRC questions that had arisen and directed the Supply System to provide answers within 30 l

days of.the date of the letter.

The Supply System has received the AE's response to the additional NRC l

questions; however, prior to forwarding it to your office, it has been determined that further' analysis and clarification is required. There-fore, the requested'information will be provided by April 16, 1982.

Sho ld you have any que,stions or desire further information, please con-tac,mp' directly.

(

l

,7

/

AQ /

A.tS. L6 ic, 60 R

Program Director, WNP-3/5 i

DRC/tt 1

cc:

J. Adams - NESCO

~

'^/

D. Smithpeter - BPA h i' lj.,q c.:

Ebasco - New York WNP-3/5 Files - Richland

%:4 0?Al%y G207230211 020323 PDR ADOCK 05000509 e h. !, l O

PDR b