ML20055B634
| ML20055B634 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 07/02/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Brons J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML20055B635 | List: |
| References | |
| NUDOCS 8207220571 | |
| Download: ML20055B634 (2) | |
See also: IR 05000286/1982009
Text
(
.
s -
- 'a
JUL 031982
Docket No. 50-286
Power Authority of the State of New York
Indian Point Nuclear Generating Station, Unit 3
ATTN: Mr. J. C. Brons
Resident Manager
P. O. Box 215
Buchanan, New York 10511
Gentlemen:
Subject:
Inspection No. 50-286/82-09
This refers to the routine safety inspection conducted by Mr. R. Paolino of
this office on June 1-4, 1982 at the Indian Point Nuclear Generating Station,
Unit 3, Buchanan, New York of activities authorized by NRC License No. DPR-64
and to the discussions of our findings held by Mr. Paolino with yourself and-
other members of your staff at the conclusion of the inspection, and to subsequent
telephone discussions between Mr. D. A. Beckman and Mr. R. Paolino of this
office with Mr. J. Dube of your staff on June 8 and 9,1982.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of_ procedures and representative records,
interviews with personnel, and observations by the inspector.
Based on the results of this inspectior., it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This violation has
been categorized by severity level in accordance with the NRC Enforcement
policy (10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987) dated March 9, 1982.
You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
Another activity appears to be a Deviation from a commitment made in your
letter of August 15, 1980 (PASNY letter IPN 78-80) provided in response to NRC
staff requests in an NRC letter of May 21, 1979 and used as a basis for the
NRC Safety Evaluation Report issued with Amendment 24 to License DPR-64.
In
your letter, you stated that closed head, horizontal _ side-wall type fire
suppression sprinkler nozzles would be installed to protect certain safety
related cable trays. We have found, however, that you have not installed
nozzles of the specified type and that the radial pattern nozzles actually
installed may provide insufficient fire suppression.
In conjunction with your
response to Appendix A, please provide a written reply addressing this matter,
including the corrective and preventive steps you have taken or will take, the
date when corrective action will be completed, and the circumstances which
permitted this Deviation to occur.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Redu
t f
8
[/b
8207220571 820702
DR ADOCK 05000286
/
_ _ _ _ _ _ _
_
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
. .___
.
.
Power Authority of the State of New York
2
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the require-
ments of 2.790(b)(1). The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
l
Your cooperation with us in this matter is appreciated.
,
!
(
,
Sincerely,
l
Origins 1 sirvad By:
-
M homas T. Martin, Director
l
')
Division of Engineering and Technical
Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Number 50-286/82-09
cc w/encls:
L. W. Sinclair, President and Chief Operating Officer
J. P. Bayne, Senior Vice President-Nuclear Generation
C. M. Pratt, Assistant General Counsel
A. Klausmann, Vice President - Quality Assurance
D. Halama, Quality Assurance Superintendent
G. M. Wilverding, Chairman, Safety Review Committee
K. Burke, Director, Regulatory Affairs (Con Ed)
J. Thoma, Project Manager
Public Document Roi n (PDR)
-
Local Public Docum.nt Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bec w/encis:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
H. B. Kister
R1:DETP
!
R1
R1:DETP
Paolino/ b
Be
man
Ebnepr/
6/29/82
.-) 0
/; 0
/
FFICIAL RECORD COPY
_ _ _