ML20055B166
| ML20055B166 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Quad Cities, 05000000 |
| Issue date: | 07/09/1982 |
| From: | Vassallo D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20055B162 | List: |
| References | |
| NUDOCS 8207200436 | |
| Download: ML20055B166 (2) | |
Text
.
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50-237, 50-249, 50-254 AND 50-265 COMMONWEALTH EDISON COMPANY AND
- *a IOWA-ILLIN0IS GAS AND ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENTS TO OPERATING LICENSES The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 73 to Provisional Operating License No. DPR-19, and Amendment No. 65 to Facility Operating License No. DPR-25, issued'to Commonwealth Edison Company, which revised the Technical Specifications for operation of the Dresden Nuclear Power Station, Unit Nos. 2 and 3, located in Grundy County, Illinois.
The Commission has also issued Amendment No. 80 to Facility Operating License No. DPR-29, and Amendment No. 74 to Facility Operating License No. DPR-30, issued to Commonwealth Edison Company and Iowa-Illinois Gas and Electric. Company, which revised the Technical Specifications for operation of the Quad Cities Nuclear Power Station, Unit Nos.1 and 2, located in Rock Island County, Illinois. The amendments are effective as of the date of issuance.
The amendments authorize deletion of the surveillance requirement to demohstrate the operability of the automatic pressure relief subsystem on a daily basis when the high pressure coolant injection system (HPCI) 1.s inoperable.
The existing requirement to demonstrate the operability of the automatic pressure relief subsystem immediately upon declaring the iiPCI inoperable remains unchanged.
The amendments also correct several previously amended pages which contained typographical and editorial errors.
The application for the amendments complie.s with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the 8207200436 820709 DR ADOCK 05000
r 2
Commission's rules and regulations.
The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the 1,1, cense amendments. Prior
..?
public notice of these amendments was not required *since the amendments do not involve a significant hazards consideration.
The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not. be prepared in connection with issuance of these amendments.
For furth'er details with respect to this action, see (1) the application for amendments dated April 29, 1982, and, for Dresden Unit 3 only, a letter dated May 25, 1982 (2) Amendment No. 73 to License No.
DPR-19, Amendment No. 65 to License No. DPR-25, Amendment No. 80 to License No. DPR-29 and Amdnement No. 74 to License No. DPR-30, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW., Washington, D.C.,
and at the the Morris Public Library, 604 Liberty Street, Morris, Illinois, for Dresden 2 and 3 and at the Moline PUblic Library, 504-17th Street, Moline, Illinois, for Quad Cities 1 and 2.
A copy of items (2)'and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this 9th day of July 1982..
I FOR THE NUCLEAR REGULATORY COMMISSION yh/.49fic-V
'Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing
.