14

. OPERATING DATA REPORT

) DOCKET NO. s n-un

's DATE 7/06/8Z COMPLETED By W. G. Hairston, III 6 TELEPil0NE (205) 899-5156 I

OPERATING STATUS M. Farlev - Unit I N"

g 1. Unit Name: Peoph

2. Reporting Period: __ June, 1982 . ;umulative data since 2652 1)
3. Licenwd Thermal Power (MWt): 12/01/77, date o'f com-
4. Nameplate Rating (Gross MWe): 860 mercial operation
5. Design Electrical Rating (Net MWe): 829
6. Masimum Dependable Capacity (Gross MWe): 844.6 I 7. Masimum Dependable Capacity (Net MWe): 803.6
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

M1A I

9. Power Level To Which Restricted.lf Any INet MWe): N/A
10. Reasons For Restrictions.lf Any: N/A I This Month Yr.-to-Date Ctimulatise i1. Ilours in Reporting Period 720 4143 40_151
12. Number Of flours Reactor Was Critical 720 2842.1 23.823.9
13. Reactor Resene Shutdown flour 0 36.6 3,528.6 ,
14. Ilours Generator On-Line 720 2653.0 22,982.7
15. Unit Resene Sht.tdown Ilours n n n
16. Gross Thermal Energy Generated (MWil) 1, R7 s ,011 A Ann OAA s7 ss3.877
17. Gross Electrical Energy Generated (MWill 5862 530 2'.078 440 18.'315.392
18. Net Electrical Energy Generated (MWill 556.380 1.942.090 17.165.814
19. Unit Senice Factor 100.0 61.1 57.2

, , 20. Unit Availability Factor 100.0 61.1 57.2

! 21. Unit Capacity Factor IUsing MDC Net) 96.2 55.6 53.2 k 22. Unit Capacity Factor (Using DER Net) o 1. 7 sq. o 51 . 6

23. Unit Forced Outage Rate 0.0 38.5 20.6
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eacht:

" / ^.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITI A L CRITICAllI Y 8/06/77 8/09/77 ,

INillAL ELEC1RICITY 8/20/77 8/18/77 i COMMERCI AL OPER A TION 12/01/77 12/01/77 i

/

4 8207200305 820712 N/771 PDR ADOCK 05000348 ,

R PDR i l

)

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1

. NARRATIVE

SUMMARY

OF OPERATIONS

- JUNE, 1982 In the month of June there was one (1) power reduction.

On June 6th, in order to improve reactor coolant pump seal performance, I the RCS pressure was momentarily increased to approximately 2250 psi.

4 During this evolution, the PORV 444A controller was placed in the manual mode in order to block the signal which causes the PORV to open. However,

, while the "open" signal was still present, the controller was returned

to AUTO resulting in a challenge to the PORV. . The PORV opened and following ,

a decrease in pressure to 2235 psi the PORV returned to the closed position.

1 The following safety-related maintenance was performed in the month of' June:

1. Performed miscellaneous maintenance on diesel generators i 2. Replaced the IB BIT Recirculation Pump i
3. Repacked the IB Service Water Pump
4. Adjusted packing in (IA RHR Suction from Containment Sump) motor i operated valve.

I I-i

DOCKET No. so-348 11 NIT J.M. Ferley-Unit 1 I -

gg37 ., Inn in7

~ '

W. G. Hairston, III CO3fPLETED DY i TELEfil0NE (205) 899-5156

. 1 1' - i 510 G11 l DAY AVERAGE DAILY l'OWER LEVEL ' DAY AVERAGE DAILN POWER LEVEL (SI)Ve Net) (51We Net) 1 782 37 7ai ,

I.

2 782 -

13 793 3 7A6 19 7RA 4 77% 20 SR1 740 21 ^17 5

4 6 789 22 7aa 7 705 23 741 s .

g 793 24 791 r]

? 7an 25 792 -

~

10 782 26 7AA t

11 788 27 787 12 786 23 784 ,

13 787 29 784 14 792 , _ 30 7RA

. m 15 794 JI 16  : 793 ,

INSTittJCI!ONS ,

Cn this formsr. list the sversge dady unit powerlevelin htWe Net for each d:y in the reporting month.Cornpute to

, the nearest whole nv pwait.

l (9p7) e 2y o

  • A I

,a , .....c. j e. y_ f ~ ~ s**w w w ~

4 9

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME 3- M- Farl ev-thit 1 DATE 7/nA/g?

REPORT MONTH June- 1982 COMPLETED BY u c u,avcenn III TELEPHONE (205) 899-5156 m 3 -

e ri o: c

!0

~

U'"" $#

No' Date li. 'S N 3 S0 bl 81 g 3j "

5gx Event g7

  • ' g C'"5'Acigo, A C"",,tive C-i@[d R*P"'8
  • _ g Prevent Recurrence (005 ,

820620 li o B NA NA IIC llTEXCH Power reduced to 72% for inspection of condenser tubes. No tube leaks fo und.

t l

1 2 3 4 F: Forced Reason:

Method:

S: Scheduled A Equiprnent Failure (Explain)

Exhibit G-Inst uctions 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refucting 3 Automatic Scram.

D Regulatory Restriction Event Report (LER) File INUREG-4 Other (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative 5

G-Operational Es rur (Explain)

(9/77) ll-Other (Explain) Exhibit I Same Source

4, i OPERATING DATA REPORT o

""it?e 4har COMPLETED BY W. G. Ha_irston, 18 i

TELEPHONE Q05) 899-5156 I OPERATING STATUS N"

i I. Unit Name: - Joseph M. Farlev - Unit I

2. Reporting Period: _ June. 1982 1) , C, umulative data since 2652 '

12/01/77, date o'f cour-g ,

3. Licened Thermal Power (MWti:
4. Nameplate Rating (Gross MWe): 860 mercial operation
5. Design Electrical Rating (Net MWe): 829
6. Masimum Dependable Capacity (Gross MWe):

844.6 I 7. Masimum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

w / A_

l N/A

9. Power Level To Which Restricted. lf Any (Net MWe):
10. Reasons For Restrictions.lf Any: N/A l

This Month Yr..to-Dat e Cumulatise l

11. Hours in Reporting Period 720 4341 40,151 l
12. Number Of Hours Reactor Was Critical 720 2842.1 _23.823.9
13. Reactor Resene Shutdown Hours 0 36.6 3,528.6 '

I4. Hours Generator On Line 720 2653.0 22,982.7

15. Unit Resene Shutdown Hours n n n
16. Gross Thermal Energy Generated (MWH) 1, R 7 % ,011 6 3608 QAA 57 ss3.877
17. Gross Electrical Energy Generated (MWHI 586 2 5_30_,, 2.078.440 18.'315.392
18. Net Electrical Energy Generated (MWHI 556,380 1,942,090 17,165,814
19. Unit Senice Factor 100.0 61.1 57.2
20. Unit Asailability Factor 100.0 61.1 57.2 96.2 55.6 53.2 l 21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 01 7 51 4 51 6
23. Unit Forced Outage Rate 0.0 38.5 20.6
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

F/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operationi: Forecast Achiesed INITIAL CRITICA LITY 8/06/77. 8/09/77 INIII AL ELEClRICITY 8/20/77 8/18/77 COMMERCI A L OPER ATION 12/01/77 12/01/77 f

P1/77 l l

6, .

JOSEPH M. FARI.EY NUCLEAR PLOIT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS JUNE, 1982 .

In the month of June there was one (1) power reduction.

On June 6th, in order to improve reactor coolant pump seal performance, the RCS pressure was momentarily increased to approximately 2250 psi.

During this evolution, the PORV 444A controller was placed in the manual mode in order to block the signal which causes the PORV to open. However, while the "open" signal was still present, the controller was returned to AUTO resulting in a challenge to the PORV. The PORV opened and following a decrease in pressure to 2235 psi the PORV returned to the closed position.

The following safety-related maintenance was performed in the month of June:

1. Performed miscellaneous maintenance on diesel generators
2. Replaced the IB BIT Recirculation Pump
3. Repacked the IB Service Water Pump
4. Adjusted packing in (IA RHR Suction from Containment Sump) motor operated valve.

DOC)*ET NO. _50-348

% * IJNIT J.M, Frrley-Unit 1

/

DAll 7/06/n?

W. G. Hairston, III CO3fPLETED DY s' IELEPil0NE (205) 899-5156

.\l0!IT11 .J ' m = _

DAY AVERAGE DAILY l'0WER LEVEL DAY AVERAGE DA!LY POWER LEVEL thitic-Net) (31We. Net) 782 17 rat ,

I, 2 -

7R2 -

13 793 .,

19 7RA

. 3 766 20 SR1 4 __ 773 5 740 - 21 " Alt 22 7an 6 789 749 23 701 .

s 7 24 791 793

] g 792 <

9 _

van 25

~

26 7AA 10 72 .

788 27 787 Il 23 784 ,

796 12 787 29 784 13 792 30 7RA 14 15 794 33 .

16  : 793 -

I INSTRUCIIONS On this fomur. list the svenge daily umt power !csc!in htWe Net for esch d:y in the reporting month. Compute to

, the neare: whole nn pwatt. .

~.

, (9(77)  :

m e .

. . g l

~*

e mp e g . **** y

m .- O. .-

  • bD UNITSilUTDOWNS AND POWER REDUCT10NS DOCKET NO. 50-348 UNITNAME _3. M. Farlev-Unit 1 DATE _ 7 /nA /g, REPORT MONIN J une . 1982 COMPLETED BY u _ e- u ,4 c e m, t1y TELEPHONE _(205) 899-5156 l

?

i "i re c

' f i3 gjo No. Date k %

3'S= =b Lh"V'"' 3 Cause & Corrective c ,2 0 5 5% Report #

R3 mu gO Action to

(# " j d5 l ,

g Prevent Recurrence 6

t.' 005 ,

820620 4 0 B NA NA HC HTEXCH Power reduced to 72% for inspection

' of condenser tubes. No tube leaks

_ fo und.

/ ,

J t

i i -

I 2 *

, 3 4 F: Forced Reason: Method:

~

S: Scheduled Ex!.sbit G Instructions A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test . 2 ManualScram. Entry Sheets for Licensee C R.iucting 1

3-Automatic Scram. Event ReporI(LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Eeror (Explain) Exhibit I- Same Source (9/77) Il-Other(Explain) l