14 OPERATING DATA REPORT
)
DOCKET NO.
s n-un
's DATE 7/06/8Z COMPLETED By W.
G. Hairston, III 6
TELEPil0NE (205) 899-5156 I
OPERATING STATUS N"
M.
Farlev - Unit I g
- 1. Unit Name:
Peoph
- 2. Reporting Period: __ June, 1982 1)
. ;umulative data since
- 3. Licenwd Thermal Power (MWt):
2652 12/01/77, date o'f com-
- 4. Nameplate Rating (Gross MWe):
860 mercial operation
- 5. Design Electrical Rating (Net MWe): 829
- 6. Masimum Dependable Capacity (Gross MWe): 844.6 I
- 7. Masimum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
M1A I
- 9. Power Level To Which Restricted.lf Any INet MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
N/A I
This Month Yr.-to-Date Ctimulatise i1. Ilours in Reporting Period 720 4143 40_151
- 12. Number Of flours Reactor Was Critical 720 2842.1 23.823.9
- 13. Reactor Resene Shutdown flour 0
36.6 3,528.6
- 14. Ilours Generator On-Line 720 2653.0 22,982.7
- 15. Unit Resene Sht.tdown Ilours n
n n
- 16. Gross Thermal Energy Generated (MWil) 1, R7 s,011 A Ann OAA s7 ss3.877
- 17. Gross Electrical Energy Generated (MWill 586 530 2'.078 440 18.'315.392 2
- 18. Net Electrical Energy Generated (MWill 556.380 1.942.090 17.165.814
- 19. Unit Senice Factor 100.0 61.1 57.2
- 20. Unit Availability Factor 100.0 61.1 57.2
- 21. Unit Capacity Factor IUsing MDC Net) 96.2 55.6 53.2 k
- 22. Unit Capacity Factor (Using DER Net) o 1. 7 sq. o 51. 6
- 23. Unit Forced Outage Rate 0.0 38.5 20.6
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eacht:
" / ^.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achiesed INITI A L CRITICAllI Y 8/06/77 8/09/77 INillAL ELEC1RICITY 8/20/77 8/18/77 i
COMMERCI AL OPER A TION 12/01/77 12/01/77
/
4 8207200305 820712 N/771 PDR ADOCK 05000348 R
PDR i
- )
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS JUNE, 1982 In the month of June there was one (1) power reduction.
On June 6th, in order to improve reactor coolant pump seal performance, I
the RCS pressure was momentarily increased to approximately 2250 psi.
During this evolution, the PORV 444A controller was placed in the manual 4
mode in order to block the signal which causes the PORV to open. However, while the "open" signal was still present, the controller was returned to AUTO resulting in a challenge to the PORV.. The PORV opened and following a decrease in pressure to 2235 psi the PORV returned to the closed position.
1 The following safety-related maintenance was performed in the month of' June:
- 1. Performed miscellaneous maintenance on diesel generators i
- 2. Replaced the IB BIT Recirculation Pump i
- 3. Repacked the IB Service Water Pump
operated valve.
I I-i
DOCKET No.
so-348 11 NIT J.M. Ferley-Unit 1 I
gg37., Inn in7
~
CO3fPLETED DY W. G. Hairston, III i
TELEfil0NE (205) 899-5156 1
510 G11 1' -
i l
DAY AVERAGE DAILY l'OWER LEVEL '
DAY AVERAGE DAILN POWER LEVEL (SI)Ve Net)
(51We Net) 1 782 37 7ai I.
13 793 2
782 3
7A6 19 7RA 4
77%
20 SR1 5
740 21
^17 4
6 789 22 7aa 7
705 23 741 s
g 793 24 791 r]
?
7an 25 792
~
10 782 26 7AA t
11 788 27 787 12 786 23 784 13 787 29 784 14 792 30 7RA m
15 794 JI 16 793 INSTittJCI!ONS Cn this formsr. list the sversge dady unit powerlevelin htWe Net for each d:y in the reporting month.Cornpute to
, the nearest whole nv pwait.
l (9p7) e 2y o
A I
,a
.....c.
j e.
y_
f ~ ~ s**w w w ~
4 9
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME 3-M-
Farl ev-thit 1 DATE 7/nA/g?
REPORT MONTH June-1982 COMPLETED BY u c u,avcenn III TELEPHONE (205) 899-5156 3
m e
ri o:
c No' Date li.
'S N 3 S0 U'"" $#
bl 81 C'"5' A C"",,tive
~
g 3j 0
5gx Event g7 g
- Acigo, i@[
R*P"'8
- g Prevent Recurrence C-d (005 820620 li o
B NA NA IIC llTEXCH Power reduced to 72% for inspection of condenser tubes. No tube leaks fo und.
t l
1 2
3 4
F: Forced Reason:
Method:
Exhibit G-Inst uctions S: Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refucting 3 Automatic Scram.
Event Report (LER) File INUREG-D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & Ucense Examination F Administrative 5
G-Operational Es rur (Explain)
Exhibit I Same Source (9/77) ll-Other (Explain)
4, i
OPERATING DATA REPORT
""it?e 4har o
COMPLETED BY W. G. Ha_irston, 18 TELEPHONE Q05) 899-5156 i
I OPERATING STATUS N"
I. Unit Name: - Joseph M.
Farlev - Unit I i
- 2. Reporting Period:
_ June. 1982
,, umulative data since C
1) 2652 g
- 3. Licened Thermal Power (MWti:
12/01/77, date o'f cour-860 mercial operation
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 829 844.6
- 6. Masimum Dependable Capacity (Gross MWe):
803.6 I
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
w / A_
l
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
N/A l
This Month Yr..to-Dat e Cumulatise l
l
- 11. Hours in Reporting Period 720 4341 40,151
- 12. Number Of Hours Reactor Was Critical 720 2842.1
_23.823.9 0
36.6 3,528.6
- 13. Reactor Resene Shutdown Hours 720 2653.0 22,982.7 I4. Hours Generator On Line
- 15. Unit Resene Shutdown Hours n
n n
- 16. Gross Thermal Energy Generated (MWH) 1, R 7 %,011 6 608 QAA 57 ss3.877 3
- 17. Gross Electrical Energy Generated (MWHI 586 5_30_,,
2.078.440 18.'315.392 2
- 18. Net Electrical Energy Generated (MWHI 556,380 1,942,090 17,165,814
- 19. Unit Senice Factor 100.0 61.1 57.2 100.0 61.1 57.2
- 20. Unit Asailability Factor 96.2 55.6 53.2 l
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 01 7 51 4 51 6
- 23. Unit Forced Outage Rate 0.0 38.5 20.6
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
F/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed 8/06/77.
8/09/77 INITIAL CRITICA LITY INIII AL ELEClRICITY 8/20/77 8/18/77 COMMERCI A L OPER ATION 12/01/77 12/01/77 f
P1/77 l l
6, JOSEPH M. FARI.EY NUCLEAR PLOIT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS JUNE, 1982 In the month of June there was one (1) power reduction.
On June 6th, in order to improve reactor coolant pump seal performance, the RCS pressure was momentarily increased to approximately 2250 psi.
During this evolution, the PORV 444A controller was placed in the manual mode in order to block the signal which causes the PORV to open. However, while the "open" signal was still present, the controller was returned to AUTO resulting in a challenge to the PORV. The PORV opened and following a decrease in pressure to 2235 psi the PORV returned to the closed position.
The following safety-related maintenance was performed in the month of June:
- 1. Performed miscellaneous maintenance on diesel generators
- 2. Replaced the IB BIT Recirculation Pump
- 3. Repacked the IB Service Water Pump
DOC)*ET NO. _50-348 IJNIT J.M, Frrley-Unit 1
/
DAll 7/06/n?
W. G. Hairston, III CO3fPLETED DY s'
IELEPil0NE (205) 899-5156
.\\l0!IT11.J ' m =
DAY AVERAGE DAILY l'0WER LEVEL DAY AVERAGE DA!LY POWER LEVEL thitic-Net)
(31We. Net) 782 17 rat I,
13 793 7R2 2
3 766 19 7RA 4
773 20 SR1 5
740 -
21 "
Alt 6
789 22 7an 7
749 23 701 s
791 g
793 24
]
25 792 van 9
~
26 7AA 10 72 Il 788 27 787 12 796 23 784 784 13 787 29 14 792 30 7RA 15 794 33 16 793 I
INSTRUCIIONS On this fomur. list the svenge daily umt power !csc!in htWe Net for esch d:y in the reporting month. Compute to
, the neare: whole nn pwatt.
~.
(9(77) m e
g l
y
~*
e mp e g.
bD
.- O.
m UNITSilUTDOWNS AND POWER REDUCT10NS DOCKET NO. 50-348 UNITNAME
_3.
M.
Farlev-Unit 1 DATE _ 7 /nA /g, REPORT MONIN J une. 1982 COMPLETED BY u _ e-u,4 c e m, t1y TELEPHONE _(205) 899-5156 l
?
i "i
% = =b Lh"V'"'
c re
' f i3 k
3'S gj Cause & Corrective No.
Date 3R3 gO Action to c
,2 0
5 5%
o j d5 l Report #
g Prevent Recurrence mu
(#
6 t.' 005 820620 4
0 B
NA NA HC HTEXCH Power reduced to 72% for inspection
' of condenser tubes. No tube leaks fo und.
/
J t
i i -
I 2
3 4
F: Forced Reason:
Method:
Ex!.sbit G Instructions
~
S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test
. 2 ManualScram.
Entry Sheets for Licensee C R.iucting 3-Automatic Scram.
Event ReporI(LER) File (NUREG-1 D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Eeror (Explain)
Exhibit I-Same Source (9/77)
Il-Other(Explain) l