ML20055B055

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for June 1982
ML20055B055
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/12/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20055B056 List:
References
NUDOCS 8207200302
Download: ML20055B055 (1)


Text

Mailing Addr^st Alabarna Power Company o

600 North 18th Street Post Office Box 2641 Oumingham. Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

Senior Vice President Alabama Power Fhntndge Building fle soutturn ekttnc systom July 12, 1982 Docket No. 50-348 Director, Office of Management Information and Program Control U. S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Si r:

RE: Joseph M.

Fa rley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the June, 198? Monthly Operating Report for Joseph M.

Fa rley Nuclea r Plant, Unit 1,

required by Section 6.9.1.6 of the Appendix A Technical Specifications.

As requested by letter f rom Mr. John F.

Stolz to Mr. Al a n R.

Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached "eport.

If you have any questions, please advise.

Yours ver

ruly, F. L.

Clayton, Jr.

F LCJ r/KWM :n a c Enclosures xc: Mr. Ted Cintula (1 copy) y Director, IE (10 copies) y M-

/

Di rector, RII (1 copy)

B207200302 B20712 PDR ADOCK 05000348 R

ppg

%