Interim Part 21 Rept Re Out of Tolerance Edge Distance, Spacing,Size of Bolt Holes & Excess Weld Undercut on Structural Steel,Initially Reported 820610.Next Rept to Be Submitted 821015
ML20055B057
Person / Time
Site: Marble Hill
Issue date: 07/12/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82-678-000 10CFR-50.55E, PT21-82-678, PT21-82-678-000, SVP-0012-82, SVP-12-82, NUDOCS 8207200303
Download: ML20055B057 (2)


Text

,

6 .

PUBLIC SERVICE INDIANA July 12,1982 S82-14 S W. Shmids SVP-0012-82 s,.nio, v,.e emwient Nucl.vir (hvenon Mr. James C. Keppler, Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble 11111 Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On June 10, 1982, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). While refurbishing structural steel, it was discovered that several pieces of structural steel had been incorrectly fabricated. The deficiencies involved were out of tolerance edge distance, spacing, and size of bolts holes and exceesive weld undercut. These deficiencies had not been discovered previously because they were concealed by connection attachments (clip angles) which had been removed for refurbishing activities.

It was determined that bolt hole size, spacing and edge distance were only of concern for sliding type connections an.1 not friction type connections. Weld undercut is a concern for both types of connecticns.

PSI is presently evaluating the impact of these deficiencies on previously erected structural steel. PSI will also require the steel erector to inspect and repair, when necessary, the remaining structural steel arior to its erection.

This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e). A further report will be filed on or before October 15, 1982. If you have any questions on this report please feel free to contact me.

Sincerely, f

S. W. Shields SWS/TDG/bak

$$0300![0!

i P O. Box 190, New Washington, Indiana 47162 812. 289.3000  %

o PUBUC SERVICE INDIANA Letter: J. G. Keppler July 12, 1982 S82-14 SVP-0012-82 cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. J. liarrison W