e
. . .
.
JUN 25 1982
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection Number 213/82-12
This refers to the routine safety inspection conducted by Mr. N. Blumberg of
this office on May 25-28, 1982 at Haddam Neck Plant, Haddam, Connecticut of
activities authorized by NRC License No. DPR-61 and to the discussions of our
findings held by Mr. H. Blumberg with Mr. R. Graves and other members of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the violation
brought to your attention in the enclosure to our letter dated January 16, 1981.
We have no further questions regarding your action at this time.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter. Such application must be consistent with the requirements of
2.790(b)(1). The telephone notification of your intent to request withholding,
or any request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at
(215) 337-5223.
No reply to this letter is required. Your cooperation with us in this matter is
appreciated.
Sincerely,
origind SIP " #
'
omas T. Martin, Director
Division of Engineering and Technical
Programs
hD
0FFICIAL RECORD COPY
,gfol
DO
O
00
3
G
al
.
.
.. .
.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
Connecticut Yankee Atomic Power Co.
2
Enclosure:
NRC Region In Inspection Report Number 213/82-12
cc w/ encl:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
J. F. Opeka, Vice President, Nuclear Operations
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (Receives 2.790 Information)-
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
T. C. Elsasser
hh
h6rSW
RI:DETP
RI:DETP
RI:DETP
l
Blumberg/ntm
Cal)hton
Ebn t er
6/)8782
C/6L
'
CJ
h
0FFICIAL RECORD COPY
4
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ .
.a