Draft Commission Paper Informing of NRC Plan for Certifying Completion of Restart Requirements on Facility in Response to 820316 Memo
ML20055A429
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/16/1982
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
Shared Package
ML20055A430 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.C.1, TASK-2.B.1, TASK-2.B.2, TASK-2.B.3, TASK-2.D.1, TASK-2.E.1.2, TASK-2.E.4.1, TASK-2.F.1, TASK-2.F.2, TASK-2.K.2.09, TASK-TM NUDOCS 8207160335
Download: ML20055A429 (18)


Text

.

e A

~

85Cc 4" JUN 161982 3:

JUttgg Q00 E %g i

~

4 For:

" The Commissioners FR0lt:

William J. Dircks, Executive Director for Operations

SUBJECT:

T!11-1 RESTART CERTIFICATION PURPOSE:

To infom the Conaission of the staff's plan for certifying completion of restart requirenents on TMI-1 in response to Chairman Palladino's memorandum to W. J. Dircks dated itarch 16, 1982 DISCUSSIGH: The Conmission's August 9,1979 Order on TitI-l specified among things that, following issuance of a Licensing Board decision authorizing resumption of operation following completion of certain short tem actions and a finding by the Board that the Licensee is naking reasonable progress toward completion of certain long tern actions, the staff shall certify to the Comnission that those short tem actions have been completed to its satisfaction.

With respect to the short tern requirenents of the August 9,1979 Order and those additional short tem requirements inposed by the Board, the staf f has inplemented a plan for certification of those restart requirements. A listing of all restart requirements has been prepared in the form of a detailed inspection natrix which Region I inspectors are using as a basis for their inspections.

All short tero requireuents will be verified complete by Region I inspectors ani/or the KRR staff with findings documented in an in-spectinn report, Safety Evaluation Report or letter as appropriate.

Region I is providing rr. ports to NRR on a bi-nonthly basis docu-menting the status of remaining itens. The attached listing re-flects the present status of bearing related restart requirements.

At the time of licensee completion and staff verification that these short tem iters are complete, the Director of NRR will so

'/,j certify to the Connission.

h0' Grean Ticket File (w/inc. & ticket)

Contact:

DISTRIBUTION:

IE-DVanNeil Program Support, NRR R. Jacobs, URR w/inc.--Docket File ECase BSnyder NRC PDR w/inc.

X27471

-EDO Rdg DEisenhut

'0CA-3 L PDR w/inc.

Cornell RDeYoung ORB #4 Rdg

-0 ELD, Cutchin

-AE00 MBridgers (ED011659)

WDircks PCheck SHanauer JStolz w/inc. & ticket TRehm Cunningham HDenton HThompson RVollmer RJacobs w/inc. & ticket VStello PFine o,,,ced,PPAS RHaynes, Reg. ? RMattson MJambour MStine m ngram 6 E1CKOE 8207160333 820616 a

PDR ADOCK 05000289 P

PDR

.l..

..l..

j...

lRC,0NM 318 410 001 NRCM O2dO OFFICMI. RECORD COPY

' uSc"o '*8o-329 824

41 g

P P With respect to the long tern requirerents of the August 9, 1979 Order, the Board found that the long tern actions reconnended by the Director of liuclear Reactor Regulation in the August 9,1979 Order were sufficient to provide reasonable assurance that TitI-l can be operated safely in the long tem.

In addition, the 00ard concluded "that the Licensee has deninstrated reasonable progress toward the successful conpletion of these long tem actions" (Partial Initial Decision (PID),of 12/14/81, para.1223). With respect to two long tem

)

actions, i.e., abnormal transients operating guidelines ( ATOG),

v5fch is the licensee's response to Order Iten 2.1.9 (PID. s 721),

and prevention of feedwater isolation due to failure in rupture detection systou, which is a Board imposed requircrent (PID. s 1064),

the Board specifically charged the staff with revicuing these itens to detemine if the licensee has made reasonable progress toward their cogletion prior to restart. A reasonable progress deterafnation by the staff on these tuo items will te included in t%c staff's certification to the Connission when restart require-ments have been completed. Following a determination that reason-

.able progress has been nade on these two itens, the requirenent of the Connission's August 9,1979 Drder with respect to long tern requirenents will be satisfied.

The Connission should note, hot <ever, that the long tem Order requireents have since besone tiUREG-0737 requirements which have also been imposed on other operating reactors. In addition, the CUPJG-0737 Operating Reactor inclemntation dates for many of these items has passed.

In CLI-81-3, M HRC 291 at 295-296 (1981), the

.Ces:nissfon ruled on a request by the licensee that T!11-1 be dealt rith.regarding NUREG-0737 actions consistent with the treatnent accorded operrtng reactors. There the Connission indicated that it retained its flexibility to consider on a case-by-case basis developments affecting the ability of the licensee to comply with due dates for sedh requirerents as HUREG-0737 actions proposed to be inpased by the Cocnission.

In keeping with the manner in which IlVREU-0737 requfrenents are being dealt on other reactors with opt ratirp licenses the staff intends to negotiate plant specific

.comitrants fod cce,pletion of NUREG-0737 actions for T't!-l ard propects subsequently to issue a Confirnatory Order to er.sure 7 c q lianctlwith these commitments.

8 i

i e

5 4

O s

\\

^

+ s.\\

F">

).. l sr.TE )

...g.......

ccrcm. m noso.wc o

OFFICIAL RECOFiD COPY

  • " * - =

9 l

h

[

'?

il 2

o.

o y

l The commitments agreed to between the licensee and the staf f will of course be consistent with Board conditions recommended in the Board's PIDs. It is expected that nost of the long tem Order requirements will be conplete prior to restart.

The present status of the long tem Order requirements is shown on pages 6 and 7 of the attached table.

CERTIFICATION SCHEDULE At the present tine, as indicated in the attached table, there are nunerous items renaining to be conpleted. Many nodifications are in the final stages of construction and testing. There are also incomplete work itens; those are modifications essentially completed but with some renaining effort that can be acco-'plished within the next two nonths.

As the Commission is aware, repair of the stean generators is a cajor impedinent to plant readiness for restart. Assuning no licensing delays, it is estimated that the plant could be ready for criticality in December 19P2.

It appears that the licensee is endeavoring to conplete restart requircoents by Septenber 1982, but some of the restart requirements involve testing which requires the plant to be either hot or at low power (e.g., low power natural circulation testing). Assuming the licensee actively pursues completion of remaining short term items, the staff presently anticipates completing certification cf all items not requiring a change in plant conditions e.g.,

heatup, and/or low power operation for their completion, by Novenber 1982. For those itens requiring changes in plant conditions for their conpletion, the staff intends to recormend to the Connission that such items becoac a condition of the license, or the Order which would lift suspension of the license.

(Signed) William ).Dircks, Willian J. Dircks Executive Director for Operations

Attachment:

TMI-1 Restart Certification Status

['@y OELD Region I (tele one, conc.)

  • S,egrevious 318 for concurrence.

"s/U/82 RStpostecki dei f

6//

82 U-

.9Bhb. d.C RBJ,4;.0L,

, AD.;.0R,;.DL.

M g.,,,,,D,:fjRP

,,ED0

"'c'>

1ricab TNova,k*

isenhut.,

. EG,/,e,.,

HR, hon,,,

,,Whhp,h,,,

su m us)

RJacobs

,,,h/82 sf31/82 s

sf]r/82 eff /82.,,,.

s/f;.js2,,,,,,

6/

.. lo/82 s

,g,f82 1

NRC F OT.'M 310 810 60) NRC M O2 4 0 OFFICIAL RECORD COPY

'm awa2n24 j

r

=

a s

c y

'S U

.C f

f

  • incomplete work itens, that are modifications essentially completed but with some remaining effort that can be ac-complished within the next two conths. As the Connission is aware, repair of the stean generators is the rajor impedi-nent to plant readiness for restart. Assuming no licensing delays, it is estinated that the, plant could be ready for criticality in December 1982.

Jt appears that the licensee is endeavoring to complete res)hrt requirements by September which requires the plant to p/requiret.ents involve testing 1982, but 500e of the restart e either hot or at low power (e.g., low power natural cifculation testing). Assuming the licensee actively purspes completion of remaining short ter-items, the staf f prepently anticipates completing s not requiring a change in plant certification of all iteyand/or low power operation, by conditions e.g., heatup tiovember 1982. For th e itens requirin'] changes in plant conditions, the staff ntends to recornend to the Coanission which would lift sus,g a condition of the license, or the Order t;1at such itens becoe ension of the license.

W1111aa J. Dircks i

Executive Director for Operations Attachnent:

TMI-l Festart Certification Star,

I i

b omcr >

ORB #4:DL RB#4:DL D:DL DD:NRR D:NRR EDO

'8h'isi" '

'Niib'eit8n'"'

'NJ6 rcki '

'lYJEfo'b5' "

"(i/ fab" "I vak" "D6seshit" C

co,,,p

,4

.l... M "

'6l l

'E)lj[NE"'

"b["lEi"

'5[ '/5N" ' ' "5f".l5E" ' ' "5/~[52"

N"c 'oa" 3'8 "o oo' Nac" o
do OFFlCIAL RECORD COPY 4 - m32n24

Tiil-1 RESTART CERTIFICATION STATUS I. AUGUST 9, 1979 ORDER REQUIREMENTS Insp:ctinn/R: view Estimat:d Completicn/

Item Description Item Type Licensee Status Status Remarks A.

SHORT TERM Order Item 1 EFW Reliabilitj la-1 Auto Initiation of EFU Mod Complete Complete Except power escala-tion testing la-2 EFW Valves Fail Open Mod Compidte Complete la-3 Auto EFW Load on Diesels

' Mod Complete Complete except 6/82 testing 3

la-4 EFW Tech Specs Tech Specs Procedure Chgs.

Partially 9/82 Req.

Complete la-5 EFW Flow Indication Mod N/A N/A Licensee installing safety grade inst.

(control grade)

.?.IAW II.E.1.2 1a-6 EFW Procedures Procedures Complete Complete la-7 EFW Valve Alignment Procedures Complete Complete la-8 EFW Auto Start Annunciation Mod Complete Complete Except power escala-tion testing la Additional Reliability Analysis Itemsl' 1

CWST Level Alann Mod IWL Items-Partially Complete 8/82 2

Est. 7/82 2

Endurance Tsst, Test Complete Complete 3

Transfer of EFW Supply Procedures Complete Complete 4

EFW to Intact OTSG Mod Complete Complete 5

Auto EFW Protection on loss Analysis Complete-Complete W

of Water Source f

la Additional items were not Orddr items; all but la-additional ikem 7 to be completed prior to restart.

I 21WL items-Incomplete +ork list items (i.e., modification essentially complete).

3 License amendment to be issued for changes to Technical Specifications prior to restart.

' N

Inspecti:n/ Review Estimated Completi n/.

Item Description Item Typ2 Licensee Status Status' Remarks 6

EFW Initiation Independent Mod In construction-Partially complete Est. 8/82 Except Hot'-

of AC Est,7/82

  • Functional Testing (HFT)

Not required for 7

EFW Operability in Steam Mod Environment ggr}perNUREG-0680 flon-destructive exan 7/82 8

Cross-Tie Break Analysis Complete of welds scheduled-7/82 lb EFW Independent of ICS Mod Complete Complete Sugrgdeg by Order Item 2 fl/A N/A N/A lc Id Small Break Analysis Analysis Complete Complete lo Operator Retraining Training Complete Complete Order Item 2 IE Bulletins 79-05A-1 Accident Understanding Training Coc:plete Complete 79-05A-2 Plant Transient Review Inspection Complete Scheduled 7/82 7/82 79-05A-3 Transient Procedures Procedures Complete Complete 79-05A-4 Operating Procedures Procedures Complete Complete Valve lineup verifica-79-05A-5 Valve Position Review Procedures tion at tine of restart 79-05A-6 Containment Isolation Mod See Order Item 8 See Order Item 8 2.1.4 2.1.4 79-05A-7 EFW Valve Procedures Procedures Complete Complete 79-05A-8 EFW Operability Procedures Coriplete Complete 79-05A-9 Transfer of Containment Procedures See Order Item 8 See Order Item 8 Liquids 2.1'.6a 2.1.6a 79-05A-10 Safety System Operability Procedures Complete Complete 79-05A-ll Personnel Actions-TMI-2 Training Complete Complete 79-05A-12 Prompt Reporting-Procedures Complete Complete l

N l

e

(

~

7-----------

Inspection / Review Estimated Completicn/

Item Description Item Type Licensee' Status

' Status

  • Remarks

~ ~ ' "

79-058-1 Natural Circulation Procedures Complete Complete 79-05B-2 Vessel Integrity Procedures Complete Complete 79-058-3 PORV Setmint Mod Complete Partially Complete _ 9/82 79-05B-4 Manual Reactor Trip Procedure Complete Complete 79-058-5 Anticipatory Reactor Trip Mod Complete Partially Complete 6/82 except power escalation testing (Safety Grade) 79-05B-6 Prompt Reporting Procedures Complete Complete l

79-05B-7 Tech Spec Changes Tech Specs Procedure changes Pending 9/82 required 79-05C-1 RCP Trips Procedures Complete Complete 79-05C-2 Smal1 LOCA Analysis Analysis Complete Complete 79-05C-3 Operator Action-RCP Trips Procedure Complete Complete 79-05C-4 Reactor Trip Training Training Complete Complete 79-05C-5 Inadequate Core Cooling Analysis Complete Complete Complete Complete Order Item 3 Emergency Preparedness (Short Term)

Order Item 4 Separation of TMI-l & 2 a) Liquid Radwaste

-Interconnection Isolation Mod Complete Scheduled 8/82 8/82 b) Gaseous Radwaste

-Leak Test of Waste System Test Complete Scheduled 8/82 8/82

-Fuel Handling Building Mod IWL Items-Est, Pending 8/82 Isolation 7/82

-Fp'el Handling puilqing Mod IWL Items-Est.

Pending 8/82 Ventilation Sys. Mod.

7/82 c) Solid Radwaste

-Hittman Sy's. Installation Mod

' Complete Complete 8/82

-TMI-1/2 Trash Segregation Procedures Complete Scheduled 8/82 8/82 d) Sampling System

-Independent TMI-2 Sampling Mod Complete Scheduled 8/82 8/82 System I Note 3, page 1

Inspection /R! view Estimat d Completien/

Item Description Item Type Licensee' Status

' Status Remarks Order Item 5 Waste Management a) Liquid & Gaseous Sys.

Analysis Complete Comp. tete b) Solid Radwaste

-low activity stor.

Mod IWL items-Pending 8/82 expansion Est. 7/82 0'rder Item 6 Managerial Capability (All actions from this Order item verified completed by NRR (NUREG-0680 and Supp.1 & 2) with following exceptions) a) Management & Technical

-Training manual Training Partially complete Partially complete 7/82 b) Safety Review

-Final Version of Procedure Procedure Procedure revision Pending 8/82 on operating experience info.

required c) Health Physics

-Qualification Records Training Complete Partially complete 8/82 d)NUREG-0694 Items

-II.B.4 Training Records for Training Partially complete Partially complete 9/82 Mitigating Core Damage Order Item 8 Lessons Learned-Short Term (Long Tenn Lessons Learned Under LT-3) 2.1.1 Emergency Power Supply

-Pressurizer Heaters Mod IWL Items-Est.

Partially complete 7/82 6/82

-PORV, Block Valve. Level Analysis Complete Complete 2.1.2 Relief Valve Testing (Program Description only)

Testing Complete Complete 2.1.3a Valve Position Indication Mod IWL Items-Est.

Partially complete 8/82 7/82 2.1.3b Inadequate Core Cooling

-Existing Instrumentation Mod Complete Partially complete 7/82

& Saturation Meter 2.1.4 Containment Isolation Mod In construction Partially complete 9/82 Est. 8/82 2.1.5a Dedicated Hydrogen Penetra-Design Complete Complete tions 2.1.5c Install Recombiner Mod IWL Items-Est.

Partially complete (Not required by 7/82 8/9/79 Order) -

Inspection / Review. ' Estimated Completicn/

Ittm Description Item Type Licensee Status

~ Status "

'. Remarks' 2.1.6a j

Systems Integrity Testing Complete Complete Complete for restart, additional tests post s

restart 2.1.6b Plant Shielding Analysis Complete Complete 2.1.7a EFW Auto Initiation (Control Grade)

Mod Complete Complete 2.4.7b EFW Flow Indication (Control Grade)

Mod N/A N/A Licensee installing

safety grade inst.

IAW II.E.1.2; see LT 3 GItem 2.1.7b 2.1.8a Post-Accident Sampling Design Complete Complete 2.1.8b Radiation Monitors (Control Grade)

Mod N/A N/A Licensee installing final monitors a)Ndble Gas Monitors IAW II.F.1; see LT 3 b)Radiciodine Monitors Item 2.1.8b c) Particulate / Effluent Monitors 2.1.8c Iodine Instrumentation Mod Complete Pending 9/82 2.2.la Shift Supervisor Procedures Complete Complete 2.2.lb Shift Technical Advisor Procedures Complete Complete 2.2.2a Control Room Access Procedures Complete Complete 2.2.2b Onsite Tech Support Center Mod Complete Complete 2.2.2c Onsite Operations Support Ctr. Mod Complete Complete e

4 a,

NUREG-0737 OR Implemen-Inspection /R3 view E'stimated Comp 1cticn/

Item Description tation Date Licensee Status Status

' Remarks B.

LJNG TERM (LT) (NUREG-0737 CORRESPONDING ITEM NUMBERS ALSO LISTED)I s

LT-1 ICS FMEA Mods TBD Testing-6/82 Partially complete 7/82 TIT k.2.9)

LT-2 Small Break Analysis 1/1/82 Generic program NRR review

'~

submitted LT-3 Lessons Learned Category B From NUREG-0578 T.T 2 Relief & SafetyWalve Testing (II.D.l.2)

-Complete testing 4/1/82 Complete Generic report Generic EPRI Program under NRR' review

-Plant specific rept.

7/1/82 Est. 7/82 Pending NRR review 2.1.3b ICC Instrumentation 2

(II.F.2.3)

-Backup Incore T/C 1/1/82 In Construction-Pending 9/82 (safety grade) 8/82

-Water level inst.

Under TBD TBD TBD development 2.1.5a Ded. Hp Penetrations

( II.E.4.1 )

-InstaT1 7/1/81 IWL Items-7/82 Partially complete 8/82 2.1.6b Plant Shielding 1st refgel after (II.B.2)

-Plant Mods 1/1/82 Procurement problems-TBD restart 2 2.1.7a EFW Auto Initiation (II.E.1.2)

-Safety Grade 7/1/81 IWL Items-6/82 Partially complete 8/823 2.1.7b EFW Flow Indication l

(II.E.1.2)

-Safety Grade 7/1/81 Complete Pending 8/82 l

l 2.1.8a Post-Accident Sampling 2

(II.B.3)

-Modifications 1/1/82 In Construction-Partially, complete 9/82 8/82 I Board 12/14/81 PID found licensee had made reasonable progress on all LT items except 2.1.9 3

2 letion '

Additional LT mods first refuel after restart Licensee's commitment for coly staff)s first refueling after restart (connitment not yet accepted --

NUREG-0737 OR Implemen-Insp:ction/R: view Estimated Complcti:n/ '

Iten Description tation Date Licensen' Status

~ Status Remarks

~

2.1.8b Radiation Monitors (II.F.1)

-Cont. Radiation Monitors 1/1/82 In Construction-Partially complete 9/82 8/82

-Effluent Monitors 1/1/82 Testing-7/82 Pending

- 8/82

-Iodine /Part. Monitors 1/1/82 IWL Items-6/82 Pending 7/82 2.1.9b Transient and Accident Analyses (I.C.1)

-Guidelines 1/1/81 Guidelines Sub-Guidelines Under i Board requested staff mitted NRR Review to certify masonable Progress-Est. 9/82

-Procedum Implementation 1st refuel Generic Program Generic Program after Submitted Under NRR Review i

10/1/82 Cont. Press.

1/1/82 In Construction-Periding 9/821 2

Addt'1" #1' 8/82 (II.F.1!) #2 Cont. Water Level 1/1/82 IWL Items-7/82 Pending 8/82)

(II.F,li)

(II.F.1') #3 Cont. Hydmgen 1/1/82 In Construction-Pending TBDI TBD

f4 RCS Venting ist outage In Engineering-Under NRR Review TBDI (II.B.1) after 7/1/82 TBD LT-4 Emergency Preparedness (All actions from this Order item verified completed (NUREG-0746, Supp.1 and Inspection reports) with following exceptions and those items listed under Board's Emergency Planning PID)

Emergency Communications

-Install control room IWL Items-6/82 Pending 7/82 emergency telephone

-Connect emergency telephone Complete Pending 6/82 equipment to vital power Emergency Facilities

-Install high radiation

' Testing-6/82 Pending 7/82

' monitoring alarm system I Licensee's commitment for completion is first refueling after restart 2Additional items were not Order items but are NUREG-0737 actions II. ASLB IMPOSED REQUIREMENTS Inspection / Review Estimated Completion / -

PID Item Description Licensee Status Status

' Remarks

~

A.

MANAGE iT FINDINGS - August 27,1981 PID II.D Accuracy of Maintenance Records Conplete Partially Complete 8/82 II.M 8oard Conditions I

1. Category T Exam for remaining Complete Pendt.ng individuals I
2. Additional 3 days o~f TMI-2 Complete Pending 9/82 accident training l
3. Simulator exam for operators Complete Pending' not previously licensed

' 4. Cpgrt-t**k gmglator to Complete Pending l

empj

5. Bids and specs for TMI-l 10/82' Status Report.

N/A 10/82-First of licensee annual repts. on pro-simulator

6. Contract for basic principles 11/82 installed Pending Q1Nd I

y1 trainer to be installed in 1982) Contract complete

7. Emergency Director / Support 8/82 Pending 9/82 I

Director training Post-restart. license.

8. ATOG training prior to AT0G condition implementation 9(a)-9(g). License conditions for Complete Scheduled at At time. of restart, '

restart license condition shift manning 10(a)-10(c). Management system to 8/82 Pending At time of restart, license condition perform specific functions related to operating experience inforination B.

PLANT DESIGN, MODIFICATION AN

D. PROCEDURE

S FINDINGS - DECEMBER 14, 1981 PID II.A Natural and Forced Circulation

-Motor control center shield walls IWL Items-6/82 Pending 7/82 (para. 628)

II.B Detection of ICC

-Water level meter in long term TBD TBD No certification (para. 673) required II.C Staff 1 review revised ATOG program Generic Program Submitted Under NRR Review Certify Reasonable (para. 721) Progress-Est. 9/82 IBoard license conditions, para. 583 PID dtd. P/27/81 requiring staff certification of licensee completion before restart 1

Inspecticn/ Review Estimatcd Congleticn/

PID Item Description Licensee Status Status Remarks II.E Pressurizer Heaters I

-Demonst. ate RCS pressure control 11/82 Pending HFT w/HPI (para. 755)

II.F-Pressurizer (Pzr) Heaters Power

-Procedures for connecting Pzr Complete Complete heaters to diesel (para. 771)

-Demonstrate Pzr heater connection See Order Item 8 2.1.1 See Order Item 8 to emergency bus (para. 772) 2.1.1 II.K Computer

-Operator reliance on computer Complete Pending 11/82 (para. 865) 7/82 Pending.

License Condition

-Incore thermocouple backup (para. 867)

.before 5% power-display (not safety grade)

'Est. 9/82 II.L In-Plant Instrument Ranges See Order Item LT-3 See Order Item

-Effluent monitors (para. 874-875) 2.1.8b long tenn LT-3 2.1.8b long tern II.M Safety System Status Panel

-Safety system valve lineup review See Order Item 2 See Order Item 2

'At time of restart (para. 899) 79-05A-2 79-05A-2 I

-System status admin. controls' Partially complete Pending HFT (para. 904)

II.N Control Room Design

-Correct NUREG-0752 deficiencies Partially complete Partially complete Short-term 9/82, LT deficiencies 1st (para. 914-915) refuel after restart (license condition) 11.0 Additional L0dA Analysis

-Install HPI Cavitating Venturis Complete Partially complete 8/82 (para. 943)

IHFT= Hot Functiorial Testing

_g.

Inspection / Review Estimated Complction/ -

PID Item Description Licensce Status Status'

' Remarks II.P Systems Classification

-Upgrade Pressurizer Level Inst.

IWL items-7/82 Pending 8/82 Power Supplies (para.1001) testing II.Q EFW Reliability

-Safety grade automatic See remarks See remarks 1st refuel after restart (license EFW control (para. 1036) condition)

-Install following lont term EFW mods (para.1037) a)EFW cavitating venturis IWL items-6/82 Complete except IWL 8/82 except HFT

& testing b)CWST level alarm (safety grade)

See remarks See remarks 1st refuel after restart (license condition) c)0TSG high level alarm See remarks See remarks 1st refuel after restart (license condition) d) Safety grade isolation of MFW on See remarks See remarks 1st refuel after restart OTSG overfill e) Upgrade main steam rupture See remarks See remarks ist refuel

ter detection system to safety grade restart (license condition)

-Propose means to prevent EFW Est. 6/82 NRR Review Certify reasonante isolation due to rupture detec-Pending progress-Est. 9/82 ~~~

tion sys. failure (para 1064)

II.S Board Questions NUREG-0694 Items (para.1132)

-I.B.l.2-Organization Complete Complete

& management' improvement 11/82

-I.C.7-NSSS vendor review Partially complete Pending l

of procecjures See Board Item

-I.D.1-Control room design See remarks

.See remarks II.N. NUREG-0752 l

review I

-I.G.1-Low power testing Partially complete NRR Revi.ew Pending, During low power testing

-I.'C.8-Monitoring of Selected Complete Comnlete Emergency Procedures i

Insp:ctien/R: view Estimated Conplotion/

Ittm Description Licensee Status Status Remarks II.T Equipment Qualification

-Status of compliance w/CLI-80-21 Complete Complete for radiation levels.Re Comission (para.1162) port to Under NRR Review ll/82; License condition

-Six' Board conditions concerning Submitted response material aging & other EQ items for 3 items prior to (para. 1163 & 1168) exceeding 5% power

-Staff review flood level Est. 6/82 NRR Review Pending '9/82 calculations (para,1174)

-Position on Cold Shistdown (para.

Complete Complete 1180)

O _.

Insp cticn/R:vicw Estimated Completion /

Item Description Licensee Status Status Remarks C.

SEPARATION OF THI-l AND TMI-2 FINDINGS - December 14, 1981 III.B

-ESF Filter System Installation See remarks See remarks 1st refuel after restart (license condition)

-Suspension of Unit 1 Fuel N/A for restart N/A for restart Prior to Unit 2

~

Handling Activities During Unit fuel movements 2 Fuel Movements (para.1256)

(license condition)

NRR Review pending 10/82

-Ventilation Separation Program Est. 8/82 (para. 1267)

-Unit 1 solid waste not affected

~ ~

License condition by Unit 2 (para.1303)

-Groundwater monitoring Ongoing Ongoing Continuous, no program (para.1326) certification required D.

EMERGENCY PLANNING FINDINGS - December 14, 1981 IV.L CONCLUSIONS Bocrd Paragraph 2010 Condi-

a. Emergency Support Director Procedures-6/E2 Pen' ding 8/W tiens staffing in EOF prior to full emergency support organiza-tion arrival (para. 2010(a))
b. Staff review county EP Complete Review complete'
  • 9/82 brochures and PEMA EP Advise Commission pamphlet and advis.e Commis-9/82 sion of impact of changes c.PEMA pamphlet and county See remarks Pending Licensee committed to brochure distribution to distribute one month populace in EPZ prior to restart d.Public information brochure See remarks Pending Licensee committed to distribution to transient distribute one month locations prior to restart
e. Licensee to.. conduct EP briefings Scheduled 8/82 Pending 9/82 to major employers and operators of transient locations.

Briefings to begin prior to restart.

~

Inspection / Review Estimated Compl'eti:n/

Item Description Licensee Status _

~ Status Remarks

f. Staff certify satisfactory Complete FEMA review 6/82
  • 9/82 completion of siren system Staff review 9/82 testing
g. Communications drill to be Complete Complete held prior to restart
h. Certify to Commission that N/A FEMA review 6/82 - 9/82 EPZ school plans ard Advise Comission complete 9/82 Board Paragraph 2011 Sugges-a.Five York county school N/A Est. 9/82 Certification not tions districts should prepare required plans for mass care emergency responsibilities
b. Staff should notify Comis-See remarks See remarks Certification not '

sion within 1 yr. after required.To be mstart whether distribution completed 1 yr. after of KI_ accomplished restart

c. Municipalities should prepare N/A' Est. 9/82 Certification not written plans to assist with required evacuation
d. Commission should direct See remarks See remarks Certification not staff to certify to report on required.To be status of various state, cogleted'l yr, county & municipal plan after restart deficiencies (1 yr. after restart)

N l~

., w t ev7xas.rs%A.0,,

<,; A' #.. %

FROM:

ACTION CONTROL

. DATES ~

CONTROL NO' com OEAoL.~E ~ mm 11659 ACKNOWLEoGMENT g[fif4 4 DATE OF DOCUMENT INTERIM REPLY '

[

. j/j$fM TO:

ff,, a PREPARE FOR SIGNATURE g

g.,

FINAL REPLY f.)

t3"g/

egggg FILE LOCATION g/// g., g

{] EXECUTIVE DIRECTOR OTHER:

DESCRIPTION O LET1En g uEuO O REPORT O OTHER SPECIAL INSTRUCTIONS OR REMARKS Acq provide Commissfes a plan. sad scheJule to accorpitsh certtffcattee of ifconsee comp 1tance alth TMI-1 restart girements PRICATE LLASSIFIED DATA DOCUMENT / COPY NO.

CLASSIFICATION l NUMBER OF PAGES CATECORY POSTAL REGISTRY NO.

O NSI O Ro O rRo ASSIGNF.D TO:

DATE INFORMATION ROUTING LEGAL REVIEW D ' FINAL U COPY M ha.' m M 6/32 Mycks ASSIGNEo TO:

DATE

- NO LEG AL OBJECitONS E

MM

/ p"5 r -

,,, ' Ef' t

Ex

$gg))g' ; Cage /Dgggmn/P. Tin,4.

Y ellEtr'*

wmmtNTS, NOTIFY:

jqgyggg, p,g, j ]. PPAs 5.

Tlapapson EXT.

/

JCAE NOTIFICATION RECOMMENDED:

(J vtS U NO NRC FOnM 232

. EXECUTIVE DIRECTOR FOR OPERATIONS '

PRINCIPAL CORRESPONDENCE CONTROL -

DO NOf REMOVE THIS C/jrV n._,n n-n

=

.-..__ _ _,3