Text
..
.
=- .
.
_
'
IE HQ Ri.E CORY
DUN 2 9 %
,
I
4
i
Docket No. 50-454
f
Docket No. 30-17034
Commonwealth Edison Company
J
ATTN:
Mr. Cordell Reed
<
Vice President
l
Post Office Box 767
Chicago, IL 60690
i
!
Gentlemen:
!
'i
This refers to the routine safety inspection conducted by Mr. L. J. Hueter
!
of this office on May 24-26, 1982, of activities at Byron Nuclear Power Station,
'
Unit 1, authorized by NRC Construction Permit No. CPPR-130, and Byproduct
]
Materials License No. 12-05650-18 and to the discussion of our findings with
Mr. R. Querio and other members of your staff at the conclusion of the
inspection.
a
!
.
j
The enclosed copy of our inspection report identifies areas examined during-
the inspection. Within these areas, the inspection consisted of a selective
j
examination of procedures and representative records, observations, and
j
interviews with personnel.
l
i
No items of noncompliance with NRC requirements were identified during the
j
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new duc date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an af fidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
8207150520 820629
p W1 (S '
PDR ADOCK 05000454
G
Yhh
.
Commonwealth Edison Company
2
JW 29 %
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
jal -jn 4 / hu k
J. R. Miller, Chief
Technical Inspection Branch
Enclosure:
Inspection Reports
No. 50-454/82-08 and
No. 30-17034-82-01
cc w/ encl:
Louis 0. DelGeorge, Director
of Nuclear Licensing
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Station
Superintendent
DMB/Dacument Control Desk (RIDS)
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Karen Borgstadt, Office of
Assistant Attorney General
Myron M. Cherry
I
/)
hi
RIII
RIII
RII
ff
h
/ f'e'r ;jb
i
/
ilde er/dm
Greger
Hayes
C.
.51 l
6/21/82
4/24
.-
h,
(
-
.