Forwards IE Insp Repts 50-454/82-08 & 30-17034/82-01 on 820524-26.No Noncompliance Noted
ML20055A147
Person / Time
Site: Byron, 03017034
Issue date: 06/29/1982
From: John Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20055A148 List:
References
NUDOCS 8207150520
Download: ML20055A147 (2)


See also: IR 05000454/1982008

Text

.. . =- . . _

'

IE HQ Ri.E CORY

, DUN 2 9 %

I

4

i

Docket No. 50-454

Docket No. 30-17034

f

Commonwealth Edison Company  ;

J

ATTN: Mr. Cordell Reed <

Vice President l

l Post Office Box 767

Chicago, IL 60690

i

! Gentlemen:

!

'i This refers to the routine safety inspection conducted by Mr. L. J. Hueter

!

'

of this office on May 24-26, 1982, of activities at Byron Nuclear Power Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-130, and Byproduct

] Materials License No. 12-05650-18 and to the discussion of our findings with

Mr. R. Querio and other members of your staff at the conclusion of the

a

inspection. .

!

j The enclosed copy of our inspection report identifies areas examined during-

the inspection. Within these areas, the inspection consisted of a selective

j examination of procedures and representative records, observations, and

j interviews with personnel.

l

i No items of noncompliance with NRC requirements were identified during the

j course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room. If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new duc date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an af fidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

p W1 (S '

8207150520 820629

PDR ADOCK 05000454

G

PDR Yhh

.

Commonwealth Edison Company 2

JW 29 %

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

jal -jn 4 / hu k

J. R. Miller, Chief

Technical Inspection Branch

Enclosure: Inspection Reports

No. 50-454/82-08 and

No. 30-17034-82-01

cc w/ encl:

Louis 0. DelGeorge, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Station

Superintendent

DMB/Dacument Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Karen Borgstadt, Office of

Assistant Attorney General

Myron M. Cherry

I

/)

RIII RIII RII hi

ff

ilde er/dm

h

Greger Hayes

/

C.

/

.51 l

i

f'e'r ;jb

6/21/82 4/24 .-

h,

(

-

.