ML20054N041

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/82-12 on 820501-31.No Noncompliance Noted
ML20054N041
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/01/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20054N042 List:
References
NUDOCS 8207150295
Download: ML20054N041 (2)


See also: IR 05000397/1982012

Text

<

.,

'

O

[x g f pr r 7

JUL 1 1982

Locket I;o. 50-397

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Mr. R. G. IIatlock

Program Director

Gentlemen:

Subject: HRC INSPECTION

'1 hic refers to the nonroutine inspection conducted by Messrs. R. Feil,

A. Toth and J. Elin of this office during Hay 1982, of activities

authorized by hkC Construction Permit No. CPFR-93, and to the dis-

1

cussion of our findings held by Mr. Feil with Mr. C. S. Carlisle and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspectors.

No items of noncompliance with HRC requiretnents were identified within

the scope of this inspection.

l In accordance with 10 C1'R 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless

I

you notify this office, by telephone, within ten days of the date of

this letter and submit written application to withhold information

contained therein within thirty days of the date of this letter. Such

application must be consistent with the requirecents of 2.790(b)(1) .

!

8207150295 8207o1

DR ADOCK 05000397 ,

PDR

"'"> . RV.: eg.. .

'

.(.. . . . . .Nir. , ..., .... . ... .... ..

b.C.h

. . .... .. .. .

...[Elin

.

J R. Do s T. B\ shop

sunum) R. ... Feil A. Toth

g .... .

..fA... . . .... . ....... . . . . .. . .... . ..... . . . . . . . . ... . ... ... .

3o/.8.2.. .. . .6/aat.a2..... . 22.6.a2,.... .6..I./.8.2...

-h .6/20/.a2. .. . .... .. . . . . . . . . . . . . .

NRC FORM 318 4tO,801 NRCM O240

OFFICIAL RECORD COPY ' - woo-32 e24

l

~

'

,,

Washington Public Power Supply System -2-

JUL i 1982

Should you have any questions concerning this inspection, we will be

glad to discuss thera with you.

Sincerely,

/

T. U. Bishop, Chief

Reactor Construction Projects Eranch

Luclosure:

hkC Inspection Report

No. 50-397/82-12

cc wri.i enclosure:

R. B. Glasscock, Quality Assurance Director

C. S. Carlisle, beputy Program Manager

bcc: DMS/ Document Control Desk (RIDS)

1 Distributed by RV:

.. State of WA (Lewis)

Resident Inspector

Project Inspector

RHE (w/o enc)