ML20054N041
| ML20054N041 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/01/1982 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20054N042 | List: |
| References | |
| NUDOCS 8207150295 | |
| Download: ML20054N041 (2) | |
See also: IR 05000397/1982012
Text
<
'
.,
O
[x
g
f
pr
r
7
JUL
1 1982
Locket I;o. 50-397
Washington Public Power Supply System
P. O. Box 968
Richland, Washington 99352
Attention:
Mr. R. G. IIatlock
Program Director
Gentlemen:
Subject:
HRC INSPECTION
'1 hic refers to the nonroutine inspection conducted by Messrs. R. Feil,
A. Toth and J. Elin of this office during Hay 1982, of activities
1
authorized by hkC Construction Permit No. CPFR-93, and to the dis-
cussion of our findings held by Mr. Feil with Mr. C. S. Carlisle and
other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspectors.
No items of noncompliance with HRC requiretnents were identified within
the scope of this inspection.
l
In accordance with 10 C1'R 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Room unless
I
you notify this office, by telephone, within ten days of the date of
this letter and submit written application to withhold information
contained therein within thirty days of the date of this letter.
Such
application must be consistent with the requirecents of 2.790(b)(1) .
!
8207150295 8207o1
DR ADOCK 05000397
,
. . . . .Nir. ,
...[Elin
.(.. b.C.h
"'"> . RV.: eg.. .
.
. ....
.
'
B\\ shop
..., .... . ...
.. .
.... ..
..
J
R. Do
s
T.
sunum)
R.
Feil
A. Toth
... g ....
.
..fA...
. . .... .
....... . . . .
.. . .... . .....
. . . .
.
.
. . ... . ... ... .
-h .6/20/.a2.
3o/.8.2.. .. .
.6/aat.a2..... . 22.6.a2,.... .6..I./.8.2...
.. . ....
..
. . . . . . . . . . . . .
l
NRC FORM 318 4tO,801 NRCM O240
OFFICIAL RECORD COPY
' - woo-32 e24
~
'
,,
Washington Public Power Supply System
-2-
JUL
i 1982
Should you have any questions concerning this inspection, we will be
glad to discuss thera with you.
Sincerely,
/
T. U. Bishop, Chief
Reactor Construction Projects Eranch
Luclosure:
hkC Inspection Report
No. 50-397/82-12
cc wri.i enclosure:
R. B. Glasscock, Quality Assurance Director
C. S. Carlisle, beputy Program Manager
bcc:
DMS/ Document Control Desk (RIDS)
1
Distributed by RV:
State of WA (Lewis)
..
Resident Inspector
Project Inspector
RHE (w/o enc)