Forwards IE Insp Rept 50-397/82-11 on 820517-20,0607 & 0609-11.No Noncompliance Noted
ML20054N033
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/28/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20054N034 List:
References
NUDOCS 8207150290
Download: ML20054N033 (2)


See also: IR 05000397/1982011

Text

c _ _ _ ._

.

__

1.,

y

y

)

-

n

o,

g

4

qg

4

,

..

.

s.

'

l

l

JUN 2 81982

Docket No. S0-397

Washington Public Power Supply System

P. O. Box 968

3000 George Washington Way

Richland, Washington 99352

Attention: Dr. R. G. Naticck

Proc Am Directer, WMP-2

Gentlemen:

Subject: NRC Inspection of Washington Nuclear Project 2

This refers to the routine inspection conducted by Mr. P. Narbut of this

office on May 17-20 and June 7, 9-11, 1982 of activities authorized by NRC

Construction Permit No. CPPR-93, and to the discussion of our findings held

with Mr. C. S. Carlisle and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

No items of noncompliance with NRC requirenents were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Docunent Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within tnirty days

of the date of this letter. Such application nust be consistent with the

requirements of 2.790(b)(1).

DOhKOhhohh7

{

PDR

""">

.. R,y/,j

.,,

,

,,

    • "'"'>

. .NAR

I.00D

..B

....

.....

...

.

ou )

6/)

82

6p /82

6/2 82

<

. .

.

..

.

.

.

.

.

(Lc roso .

.io so.wscu e2a

OFFICIAL RECORD COPY

' " ", + 3 m 2

j

Y

,

JUN 2 e 1982

,.

Washington Public Power Supply System

-2-

.

,,

,

!

.

Should you have any questions concerning this inspection, we will be glad

to discuss then with you.

I

Sincerely,

artstNtst s10150 LY

'

R.T.00DDS

T. W. Bishop, Chief

- Reactor Construction Projects Branch

.,

Enclosure:

Inspection Report

-

No. 50-397/82-11

cc w/o enclosure:

C. 5. Carlisle, Deputy Program Director

R. B. Glasscock, Quality Assurance Director

bcc: DMB/ Document Control Desk (RIDS)

i

Distributed b

State of WA (y RV: Lewis)

Resident Inspector (2)

Engelken (ltr)-

'

.

!

4

!

l

i

I

'

!

. - - . . , . . - . .

- - - , .

--

'

-