ML20054M895

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-424/82-12 & 50-425/82-12 on 820525-27.No Noncompliance Noted
ML20054M895
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/16/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20054M896 List:
References
NUDOCS 8207150107
Download: ML20054M895 (2)


See also: IR 05000424/1982012

Text

g'

JUN 16 1982

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

Subject: Report Nos. 24/82 2)nd50-425/82-12

This refers to the routine safety inspection conducted by Mr. J. R. Harris of

this of fice on May 25-27, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility and to the discussion

of our findings held with Mr. H. H. Gregory, Construction Project Manager, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

ercre sc i ved items. The status of these items is discussed in the enclosed

inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

l telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

l of this letter. Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

l

Should you have any questions concerning this letter, we will be glad to discuss

'

them with you.

Sincerely,

\ n

/- fa

-

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

8207150107 820616

PDR ADOCK 05000424

G PDR Eo(

. _ _ _ _ _ _ __ _

__

y.-

l Georgia Power Company 2 JUN 15 1982

1

Enclosure:

Inspection Report Nos. 50-424/82-12

and 50-425/82-12

cc w/ encl:

H. H. Gregory, III, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

M. Manry, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Georgia

1

RII RII

/ RI -

RI i RII RIl RII

&Y, \ Qv \!!1' ) fy

JRR&ris:ht TEConi n AR erdt WTobin JRogge V rownlee /41 Da e

6////82 6/7jf/82 6/y /82 6/g /82 6/jq/82 6/g82 6////82

l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _