Corrected RO 369/82-10:core Mapping Procedure Continued Past 820125 Until 820205.Originally Submitted LER Does Not Contain Wrong Date & Is Still Applicable
ML20054M053
Person / Time
Site: McGuire 
Issue date: 06/30/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-369-82-10, NUDOCS 8207090198
Download: ML20054M053 (1)


Text

I.,

DUKE POWER COMPANY

. '?&y j

G[VM '-

Powsu Uust.ntxo r.

422 Sourn Cnuncu STuzzT, CHAnIDTTE, N. C. asa4a

/g~f C/)

G A

S* / 9 waum o. emen.a.

eCr ParssoCNT Tttge,eONC; AREA 704 set. e=oover.o=

June 30, 1982 373-4o83 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 1 Docket No. 50-369

Dear Mr. O'Reilly:

In the attachment to Reportable Occurrence Report R0-369/82-10 under DISCUSSION it was stated that "the required core mapping procedure was continued until January 25, when the data "B" channel was regained after a length of rod position detector cable was replaced." The January 25 date given was in error; the sen-tence should have read that the core mapping procedure was continued until February 5.

The originally submitted LER form does not contain this error and thus is still applicable. We regret any confusion or inconvenience this may have caused.

This letter fulfills a commitment to revise the LER by June 30, 1982 made to Mr. P. T. Burnett (NRC/0IE) in his exit interview for IE Inspection Report 50-369/

82-16 and 50-370/82-11.

Very truly yours, 7

k 4

/

William O. Parker, Jr.

PBN/php cc: Document Control Desk Mr. P. R. Bemis U. S. Nuclear Regulatory Commission Senior Resident Inspector Washington, D. C. 20555 McGuire Nuclear Station Records Center Institute of Nuclear Power Operations 1820 Water Place Atlanta, Georgia 30339 c+C kl O