Monthly Operating Rept for May 1982
ML20054M040
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/03/1982
From: Ballinger P
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20054M035 List:
References
NUDOCS 8207090184
Download: ML20054M040 (4)


Text

.

e d

OPERATING DATA REPORT DOCKET NO. 050-298 DATE 6-3-82 COMPLETED BY P. L.

Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Notes

1. Unit Name:

Cooper Nuc1 car Station May 1982

2. Reporting Period:

2381

3. Licensed Thermal Power (MWt):

6

4. Nameplate Rating (Gross MWe):

778

5. Design Electrical Rating (Net MWe):

787

6. Maximum Dependable Capacity (Gross MWe):

764

7. Maximum Dependable Capacity (Net MWe):

x I

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

None

10. Reasons For Restrictions. If Any:

This Month Yr.-to.Date Cumulative 744.0 3,623.0 69,408.0

11. Hours in Reporting Period 496.6 3,318.5 57,204.9
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0.0 0.0 O.0
14. Hours Generator On-Line 495.0 3,309.3 56,266.8 0.0 0.0 0.0
15. Unit Reserve Shutdown Haurs
16. Gross Thermal Energy Generated (MWH) 974,256.0 7,276,992.0 110,965,470.0
17. Gross Electrical Energy Generated (MWH) 322,832.0 _, 2,424,487.0 34,905,274.0
18. Net Electrical Energy Generated (MWH) 312,445.0 2,349,207.0 33,646,585.0
19. Unit Service Factor 66.5 91.3 81.1 66.5 91.3 81.1
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 55.0 84.9 63.5 l
22. Unit Capacity Factor (Using DER Net) 54.0 83.3 62.3 0.0 1.9 3.9
23. Unit Forced Outage Rate
24. Shutdowns Schedulsd Over Next 6 Months (Type. Date.and Duration of Each1:

h fit o l i n cv Lv 71. 14R?. 4 t.ronk a I

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

.Tu n e 19_ 1982 l

26. Units In Test Status 1 Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY u

l INITIAL ELECTRICITY COMMERCIAL OPERATION 8207090184 820603 W/771 PDR ADOCK 05000 R

AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.

UNIT Cooper Nuclear Station 6-3-82 DATE COMPLETED BY P. L. Ballinger 402-825-3811 TELEPHONE

- MONTH May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 678 632 37 2

674 gg 615 3

671 39 625

+

666 602 4

20 5

663 21 138 6

664 0

22 663 0

7 23 8

661 24 0

9 640 25 0

10 655 26 0

11 649 27 0

12 644 g

0 13 641 0

29 14 639 30 0

15 636 0

3j 16 635 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

e 050-298 DOCKET NO.

Cooper Nuclear Station UNIT SilUlDOWNS AND POWER REDUCTIONS UNIT N AME DATE June 3, 1982 P.

L. Ballinger COMPLETED BY I

REPORT MONTil

?b v TE1.EPHONE 402-825-3811

-c a,

= -, :

Cause & Corrective 454 Licensee

,E t, c

.5 ?

No.

D.t re i

3g

{

jg5 Event s7 c.'8 Action to l

=

$E 5

[v 5 =!

Report e

  1. iv gu Prevent Recurrence U

l 6

82-5 820521 S

249 C

2 N/A N/A N/A Reactor shutdown to start the 1982 Refueling and Maintenance Outage l

l 3

4 I

2 Method:

Exhibit G. Instructions F: Forced Reason:

1-Manual for Preparation of Data S: Scheduled A Equipment Failure (Explain)

Il Maintenance of Test 2-Manual Scram.

Entry Sheets for 1.icensee 3 Automatic Scram.

Event Report (LER) File (NtlRI (;-

C Refueling 4 Other (Explain) 0161)

D Regulatory Restriction 1 -Operator Training & License Examination 5

F-Administrative Exhibis 1 Same Somce G-Operational Error (Explain)

('l/77 )

Il-Other (Explain)

d Cooper Nuclear Station Operations Narrative May 1982 The reactor was shutdown on May 21, 1982 at 1638 hours0.019 days <br />0.455 hours <br />0.00271 weeks <br />6.23259e-4 months <br /> to start the 1982 Refueling and Maintenance Outage. A four week outage is planned with a startup date of June 19, 1982. No other power reductions or outages were made during the month.

l l

l l

l