OPERATING DATA REPORT DOCKET NO. 050-298 DATE 6-3-82 COMPLETED BY P. L.
Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Notes
- 1. Unit Name:
Cooper Nuc1 car Station May 1982
- 2. Reporting Period:
2381
- 3. Licensed Thermal Power (MWt):
6
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrical Rating (Net MWe):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Dependable Capacity (Net MWe):
x I
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to.Date Cumulative 744.0 3,623.0 69,408.0
- 11. Hours in Reporting Period 496.6 3,318.5 57,204.9
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 O.0
- 14. Hours Generator On-Line 495.0 3,309.3 56,266.8 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Haurs
- 16. Gross Thermal Energy Generated (MWH) 974,256.0 7,276,992.0 110,965,470.0
- 17. Gross Electrical Energy Generated (MWH) 322,832.0 _, 2,424,487.0 34,905,274.0
- 18. Net Electrical Energy Generated (MWH) 312,445.0 2,349,207.0 33,646,585.0
- 19. Unit Service Factor 66.5 91.3 81.1 66.5 91.3 81.1
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 55.0 84.9 63.5 l
- 22. Unit Capacity Factor (Using DER Net) 54.0 83.3 62.3 0.0 1.9 3.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Schedulsd Over Next 6 Months (Type. Date.and Duration of Each1:
h fit o l i n cv Lv 71. 14R?. 4 t.ronk a I
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
.Tu n e 19_ 1982 l
- 26. Units In Test Status 1 Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY u
l INITIAL ELECTRICITY COMMERCIAL OPERATION 8207090184 820603 W/771 PDR ADOCK 05000 R
AVERAGE DAILY UNIT POWER LEVEL 050-298 DOCKET NO.
UNIT Cooper Nuclear Station 6-3-82 DATE COMPLETED BY P. L. Ballinger 402-825-3811 TELEPHONE
- MONTH May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 678 632 37 2
674 gg 615 3
671 39 625
+
666 602 4
20 5
663 21 138 6
664 0
22 663 0
7 23 8
661 24 0
9 640 25 0
10 655 26 0
11 649 27 0
12 644 g
0 13 641 0
29 14 639 30 0
15 636 0
3j 16 635 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
e 050-298 DOCKET NO.
Cooper Nuclear Station UNIT SilUlDOWNS AND POWER REDUCTIONS UNIT N AME DATE June 3, 1982 P.
L. Ballinger COMPLETED BY I
REPORT MONTil
?b v TE1.EPHONE 402-825-3811
-c a,
= -, :
Cause & Corrective 454 Licensee
,E t, c
.5 ?
No.
D.t re i
3g
{
jg5 Event s7 c.'8 Action to l
=
$E 5
[v 5 =!
Report e
- iv gu Prevent Recurrence U
l 6
82-5 820521 S
249 C
2 N/A N/A N/A Reactor shutdown to start the 1982 Refueling and Maintenance Outage l
l 3
4 I
2 Method:
Exhibit G. Instructions F: Forced Reason:
1-Manual for Preparation of Data S: Scheduled A Equipment Failure (Explain)
Il Maintenance of Test 2-Manual Scram.
Entry Sheets for 1.icensee 3 Automatic Scram.
Event Report (LER) File (NtlRI (;-
C Refueling 4 Other (Explain) 0161)
D Regulatory Restriction 1 -Operator Training & License Examination 5
F-Administrative Exhibis 1 Same Somce G-Operational Error (Explain)
('l/77 )
Il-Other (Explain)
d Cooper Nuclear Station Operations Narrative May 1982 The reactor was shutdown on May 21, 1982 at 1638 hours0.019 days <br />0.455 hours <br />0.00271 weeks <br />6.23259e-4 months <br /> to start the 1982 Refueling and Maintenance Outage. A four week outage is planned with a startup date of June 19, 1982. No other power reductions or outages were made during the month.