ot l OPERATING DATA REPORT .

1 DOCKET NO. 50-286 DATE iTune 1, _1982 COMPLETED BY L. Auterino TELEPHONE (414) 714-8200 OPERATING STATUS ,

l. Unit Name: Indian Point No. 3 Nuclear power plant
2. Reporting Period: May, 1982
3. Licensed Thermal Power (MWt): 3025
4. Nameplate Rating (Gross MWe): 1013
5. Design Electrical Rating (Net MWe): 965 7
6. Maximum Dependable Capacity (Gross MWe): 926
7. Maximum Dependable Capacity (Net MWe): 891
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

-r

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to.Date Cumulative-

11. Hours in Reporting Psaod 744 3.623.0 50.424.0
12. Number Of Hours Reactor Was Critical 0 1.984.6 34.090.8
43. Reactor Reserve Shutdown Hours 0 - 0 0
14. Hours Generator On4.ine 0 1.969.4 32.913.1 0 0 0

--15. Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (MWH) 0 5.060.olo 96.1av.an1
17. Gross Electrical Energy Generated (MWH) 0 1.502.170 ?6.298.300 IS. Net Electrical Energy Generated (MWH) 0 1.436,016 25.183.443 0 54.4 6c;.3
19. Unit Service Factor
20. Unit Availability Factor 0 54.4 65.3
21. Unit Capacity Factor (Using MDC Neti o 44.5 56.1
22. Unit Capacity Factor (Using DER Net) 0 41 I 91 8 '
23. Unit Forced Outage Rate o 2.3 14.3 4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration ot' Each): ,

Refuelino outane in nrnaress

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unnn cmnlotinn of echeduled M,intenance
26. Units in Test Status (Prior to Commercial Operation s: Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8207090072 820611 PDR ADOCK 05000286 PDR R tW77i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-286 Indian Point UNIT Mn 3 DATE June 1, 1982 COMPLETED BY L. Auterino TELEPHONE (914) 739-8200 MONTH May, 19d2 DAY- AVERAGE DAILY POWER LEVEL DAY '/

AVER AGE DAILY POWER LEVEL (MWe Net) (Mwe-Net) 1 0 17 0' 2 0 Jg O 3 0 19 0 4 0 20 0 5 0 0 21 6 0 0 22 8 0 24 0 9 0 25 0 10 0 0 26 11 0 0 27 12 0 0 28 l

13 0 0 29 14 0 30 0 15 0 0 33 16 0 l

INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

MONTHLY I & C CATEGORY I REPORT .

May 1982 Month i W.R. No. DATP. EQUIPMENT MALFUNCTION CORRECTIVE ACTION IC-1-247-2 4-28-82 Containment Air Lock Gauges defective Replaced gauges Pressure gauges. 80' elevation and 95' elevation.

IC-1-1027-2 4-24-82 LT-ll37 Fan Cooler Pressure seal defective Replaced pressure seal

  1. 35 Condensate Level Transmitter 4-26-82 R-15 Process Radiation Remote meter Replaced. meter IC-1-1651-2 Monitor ) readings incorrect TI-1216 Condensate Temperature Detector Replaced temperature IC-1-1673-2 4-27-82 detector Storage Tank Temperature erratic.

Transmitter k

MONTilLY MAIMTENANCE REPORT ;p May 1982 Month . ',

_WP = DATE EQUIPMENT I MALFUNCTION CORRECTIVE ACTION 2681 5-30-82 RCS Valves 455C/456 Valves leaked through

  • Replaced internals 2780 5-25-82 PCV-455B Spray Valve Bellows leaked Replaced internals LCV-460 Letdown Stop Valve Excessive Leakage Replaced worn packing 2781 5-25-82 2782 5-21-82 LCV-459 Letdown Stop Valve Excessive Leakage Replaced worn packing 2783 5-30-82 Valve 204B Charging Va]ve Excessive Leakage Replaced worn packing 2784 5-30-82 valve 204A Charging Valve Excessive Leakage Replaced worn packing Valve 200C Letdown Flow Excessive Leakage Replaced worn packing 2785 5-25-82 control valve Valve 200B Letdown Flow Bonnet to bonnet gasket leaks Replaced Gasket 2786 5-21-82 control valve #

Valve 200A Letdown Flow Bonnet to bonnet gasket leaks Replaced Gasket 2787 5-25-82 control valve Mini Containment Flanges Gaskets Leak Replaced Gaskets 2832 5-30-82 PCV-ll87 city water to aux. Valve leaked through Lapped in Valve Seats 2837 5-30-82 feed pump PCV-llS9 City water to aux Valve leaked through Lapped in Valve Seats 2828 5-30-82 feed pump 4

- t

=

\ ~

~'

DOCKET NO. 50-286 UNIT SifUTDOWNS AND POWER REDUCTIONS ,

UNITNAME Indian Point No. 3 DATE 3e 1. 1992 COMPLETED 11Y L- Auterino REPORT MONTil Mav 1982 TELEPilONE fo'4) 719-9200 e.

, .! E 3g Y Licensee ,E g *,

Cause & Corrective No. Date g 3g jg5 Event 3,7 93 Action to -

H 5 mO

'fE 355g e

Report a 5' o Prevent Recurrence C

04 820325 S 744 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit - Inst ructions A Equiprnent Failure (Explain) l-Manual for Preparation of Data li Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.

D Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & License Examination F Administrative 5 G-Operational Error (Explain) Exhibit , - Same Source 01/77) II-Other (E xplain)

O OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

Refueling was completed and the head has been re-installed on the vessel.

Eddy Current inspection of the steam generators, replacement of containment recirculation fan cooling coils, and replacement of 31 and 33 main turbine spindles continues.

,