Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20205C7241985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134F6881985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program. ML20042F1441989-12-31031 December 1989 New York Power Authority Annual Rept for 1989. W/900430 Ltr ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20151N7881988-07-31031 July 1988 Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation ML20006B4741988-05-31031 May 1988 Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue. ML20151N7821988-05-31031 May 1988 Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2 ML20153F9161988-04-28028 April 1988 Changes,Tests & Experiments - 1986 ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness 1999-02-09
[Table view] |
Text
i
~
8 '
ot l OPERATING DATA REPORT .
1 DOCKET NO. 50-286 DATE iTune 1, _1982 COMPLETED BY L. Auterino TELEPHONE (414) 714-8200 OPERATING STATUS ,
- l. Unit Name: Indian Point No. 3 Nuclear power plant
- 2. Reporting Period: May, 1982
- 3. Licensed Thermal Power (MWt): 3025
- 4. Nameplate Rating (Gross MWe): 1013
- 5. Design Electrical Rating (Net MWe): 965 7
- 6. Maximum Dependable Capacity (Gross MWe): 926
- 7. Maximum Dependable Capacity (Net MWe): 891
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
-r
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to.Date Cumulative-
- 11. Hours in Reporting Psaod 744 3.623.0 50.424.0
- 12. Number Of Hours Reactor Was Critical 0 1.984.6 34.090.8
- 43. Reactor Reserve Shutdown Hours 0 - 0 0
- 14. Hours Generator On4.ine 0 1.969.4 32.913.1 0 0 0
--15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 0 5.060.olo 96.1av.an1
- 17. Gross Electrical Energy Generated (MWH) 0 1.502.170 ?6.298.300 IS. Net Electrical Energy Generated (MWH) 0 1.436,016 25.183.443 0 54.4 6c;.3
- 19. Unit Service Factor
- 20. Unit Availability Factor 0 54.4 65.3
- 21. Unit Capacity Factor (Using MDC Neti o 44.5 56.1
- 22. Unit Capacity Factor (Using DER Net) 0 41 I 91 8 '
- 23. Unit Forced Outage Rate o 2.3 14.3 4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration ot' Each): ,
Refuelino outane in nrnaress
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unnn cmnlotinn of echeduled M,intenance
- 26. Units in Test Status (Prior to Commercial Operation s: Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8207090072 820611 PDR ADOCK 05000286 PDR R tW77i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-286 Indian Point UNIT Mn 3 DATE June 1, 1982 COMPLETED BY L. Auterino TELEPHONE (914) 739-8200 MONTH May, 19d2 DAY- AVERAGE DAILY POWER LEVEL DAY '/
AVER AGE DAILY POWER LEVEL (MWe Net) (Mwe-Net) 1 0 17 0' 2 0 Jg O 3 0 19 0 4 0 20 0 5 0 0 21 6 0 0 22 8 0 24 0 9 0 25 0 10 0 0 26 11 0 0 27 12 0 0 28 l
13 0 0 29 14 0 30 0 15 0 0 33 16 0 l
INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
MONTHLY I & C CATEGORY I REPORT .
May 1982 Month i W.R. No. DATP. EQUIPMENT MALFUNCTION CORRECTIVE ACTION IC-1-247-2 4-28-82 Containment Air Lock Gauges defective Replaced gauges Pressure gauges. 80' elevation and 95' elevation.
IC-1-1027-2 4-24-82 LT-ll37 Fan Cooler Pressure seal defective Replaced pressure seal
- 35 Condensate Level Transmitter 4-26-82 R-15 Process Radiation Remote meter Replaced. meter IC-1-1651-2 Monitor ) readings incorrect TI-1216 Condensate Temperature Detector Replaced temperature IC-1-1673-2 4-27-82 detector Storage Tank Temperature erratic.
Transmitter k
MONTilLY MAIMTENANCE REPORT ;p May 1982 Month . ',
_WP = DATE EQUIPMENT I MALFUNCTION CORRECTIVE ACTION 2681 5-30-82 RCS Valves 455C/456 Valves leaked through
- Replaced internals 2780 5-25-82 PCV-455B Spray Valve Bellows leaked Replaced internals LCV-460 Letdown Stop Valve Excessive Leakage Replaced worn packing 2781 5-25-82 2782 5-21-82 LCV-459 Letdown Stop Valve Excessive Leakage Replaced worn packing 2783 5-30-82 Valve 204B Charging Va]ve Excessive Leakage Replaced worn packing 2784 5-30-82 valve 204A Charging Valve Excessive Leakage Replaced worn packing Valve 200C Letdown Flow Excessive Leakage Replaced worn packing 2785 5-25-82 control valve Valve 200B Letdown Flow Bonnet to bonnet gasket leaks Replaced Gasket 2786 5-21-82 control valve #
Valve 200A Letdown Flow Bonnet to bonnet gasket leaks Replaced Gasket 2787 5-25-82 control valve Mini Containment Flanges Gaskets Leak Replaced Gaskets 2832 5-30-82 PCV-ll87 city water to aux. Valve leaked through Lapped in Valve Seats 2837 5-30-82 feed pump PCV-llS9 City water to aux Valve leaked through Lapped in Valve Seats 2828 5-30-82 feed pump 4
- t
=
\ ~
~'
DOCKET NO. 50-286 UNIT SifUTDOWNS AND POWER REDUCTIONS ,
UNITNAME Indian Point No. 3 DATE 3e 1. 1992 COMPLETED 11Y L- Auterino REPORT MONTil Mav 1982 TELEPilONE fo'4) 719-9200 e.
, .! E 3g Y Licensee ,E g *,
Cause & Corrective No. Date g 3g jg5 Event 3,7 93 Action to -
H 5 mO
'fE 355g e
Report a 5' o Prevent Recurrence C
04 820325 S 744 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.
I 2 3 4 F: Forced Reason: Method:
S: Scheduled Exhibit - Inst ructions A Equiprnent Failure (Explain) l-Manual for Preparation of Data li Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.
D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5 G-Operational Error (Explain) Exhibit , - Same Source 01/77) II-Other (E xplain)
O OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.
Refueling was completed and the head has been re-installed on the vessel.
Eddy Current inspection of the steam generators, replacement of containment recirculation fan cooling coils, and replacement of 31 and 33 main turbine spindles continues.
,