ML20054L809
| ML20054L809 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/24/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20054L810 | List: |
| References | |
| NUDOCS 8207080498 | |
| Download: ML20054L809 (2) | |
See also: IR 05000301/1982010
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. _ _
_ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ - _ _ _
_ _ _ __
,
e
.JUN 2 4 082
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the routine inspection conducted by Mr. I. N. Jackiw of
this office on April 19-21, 1982, of activities at the Point Beach Nuc1 car
Power Plant, Unit 2, authorized by NRC Oporating License No. DPR-27 and to
the discussion of our findings with Mr. G. A. Reed and others at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No itecs of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent wit.. Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
8207080498 820624
DR ADOCK 05000
/
.
e.
,
Wisconsin Electric Power
2
jg 3
.
Company
part of the af fidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
_ . -
_ _ _ _ _ _ _ _ .
We will gladly discuss any questions you have concerning this . inspection.
.
_ _ _ .
Since
-1v,
h/ n WJ.d L
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection Report
No. 50-301/82-10
cc w/ enc 1:
G. A. Reed, Managet
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
RIII
RIII
R
.
'
(
bd f*
[
Jac w/dm
Konklin
it
6/11/82