ML20054L753
| ML20054L753 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/24/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20054L754 | List: |
| References | |
| NUDOCS 8207080436 | |
| Download: ML20054L753 (2) | |
See also: IR 05000266/1982014
Text
_ _-______-_ _ _ - _ _ -
.
-
.
.
JUN 2 4 882
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. M. M. Ilolzmer
of this office on June 7-10, 1982, of activities at Point Beach Nuclear Plant,
Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24 and No. DPR-27
and to the discussion of our findings with G. Reed at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
8207080436 820624
PDR ADOCK 05000266
h[
G
l
,
-
,
'
.
,
JUN2y;jph
Wisconsin Electric Power Company
2
,,
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from ya in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Roca.
We will gladly discuss any questions you have concerning this inspection.
Eincarely,
{N .Y$WN '
(?
W. S. Little, Chief
Engineering Programs Branch
'
Enclosure:
Inspection Reports
No. 50-266/82-14(DETP) and
No. 50-301/82-14(DETP)
cc w/ enc 1:
'
G. A. Reed, Manager
DMB/ Document Contro1 Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
i
Boiler Section
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
RIII
II #
RIMId
RV'
1
l
\\
epdm gg
xonkiin
i
(.lgl[2
c1tt g
6
p
N3