Requests Conformance W/Addressing & Transmitting of Independent Design Verification Program Semimonthly Rept
ML20054L739
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 06/30/1982
From: Cooper W
TELEDYNE ENGINEERING SERVICES
To: Denison E, Reedy R, Sestak F
R.F. REEDY, INC., ROBERT L. CLOUD ASSOCIATES, INC., STONE & WEBSTER ENGINEERING CORP.
References
5511-64, NUDOCS 8207080423
Download: ML20054L739 (2)


Text

PTELEDYNE ENGINEERING SERVICES

"" - ^~

UNCONTROLLED W ALTH AM MASSACHUSE TT5 02254

- " " - ^ - " -

DOCUMENT June 30, 1982 5511-64 Mr. E. Den ison R. L. Cloud and Associates, Inc.

125 University Avenue Berkeley, California 94710 Mr. R. F. Reedy, President R. F. Reedy, Inc.

236 North Santa Cruz Avenue l Los Gatos, California 95030 l

Mr. F. Sestak, Jr., Chief Engineer - Power Division Stone & Webster Engineering Corp.

245 Sumner Street Boston, Massachusetts 02210

Subject:

10VP Semimonthly Report Format Gentlemen:

With the change in semimonthly report format starting in July, please l conform with the following.

l 1. 2nd Friday Report l

l a. Address to Maneatis, Denton, Engelken, and Cooper with copies to Schierling (2), Fray, the other two IDVP participants, and the l five attorneys (Brown, Fleischaker, Reynolds, Norton, and Gehr).

1

b. Identify with the organization and month. For example, the "RLCA l

July Semimonthly Report." Specifically, do not identify the July 9th report as your seventeenth.

l

c. The text should be quite simple, such as either:

(1) Enclosed in numerical order are the Open Item Report forms issued by since our last Semimonthly report, or 300j (2) l has issued Semimonthly Report. no Open Item Reports since the (month) pgg,

d. Transmit the reports so that the addressees will receive them on b 56 i the following Monday. This is particularly important for Schierling. On the outer envelope enclosing the cupici for Denton and SChierling be sure to add: " Addressee Only, Call 492-8423."

l 8207080423 820630 PDR MISC PDR

'RTELEDYNE Messrs. Denton, Reedy, Sestak ENGNEERING SERVICES June 30, 1982 Page Two 5511-64

2. 3rd Friday Report
a. Address only to Cooper with copies only to the other two IDVP participants.
b. Identify this as the organizations report to the Program Manager for the month. For example, the "RLCA July Program Manager's Report."
c. The format can be similar to that you have used recently for Semimonthly Reports. The RLCA sixteenth was in particularly useful format.
d. Transmit the reports so that they arrive at TES and the other two IDVP participants on or before the following Monday.
3. 4th Friday Report
a. Addressed as is the 2nd Friday Report.
b. Identify as the IDVP monthly report. For example, the "IDVP July Semimonthly Report."
c. No E01 file. forms will be attached.
d. Effective closing date will be the 3rd Friday, the date carried by the other IDVP participants reports.
e. Transmit so that the addressees receive the report on the follow-ing Monday.

Very truly yours, TELEDYNE ENGINEERING SERVICES William E. Cooper Project Manager WEC/lh cc: H. E. Schierling (NRC)(2)

R. H. Engelken (USNRC)

R. R. Fray (PG&E)

H. B. Brown, Esq.

D. F. Fleischaker, Esq.

J. Reynolds, Esq.

B. Norton, Esq.

A. C. Gehr, Esq.

R. Wray (TES)

M. A. Revett (TES)

L. C. Noriega (TES)

J. Q. Cragin (TES)

P. T. Filis (TES)

Document Control l