Text
z
9 I.
+
.
-
,
,JUN 22E
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
i
Gentlemen:
!
This refers to the routine safety inspection conducted by Messrs.
W. G. Guldemond and R. L. Hague of this office on January 5 through March 31,
>
1982, of activities at Point Beach Nuclear Power Plant, Units 1 and 2, author-
'
ized by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion
of our findings with Mr. G. A. Reed at the conclusion of the inspection.
'
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
'
examination of procedures and representative records, observations, and in-
'
torviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
1
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
i
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
i
,
l
l
l
_
>
o
O
.
.
.
'
<
i
<
.
t
4
I
- Wisconsin Electric Power Company
2
June 21, 1982
delayed such that less than seven (7) days are availabic for your review,
,
please notify this office promptly so that a new due date may be estab-
4
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
i
which identifies the document or part sought to be withhold, and which
]
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
,
l
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
,
and your response to this letter will be placed in the Public Document Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
I
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
"Orlofnol cisned by R.L. Spessard"
.
'
R. L. Spessard, Director
Division of Project and
Resident Programs
Enclosures:
1.
Appendix, Notice
of Violation
,
!
2.
Inspection Reports
!
No. 50-266/82-01(DPRP)
and No. 50-301/82-01(DPRP)
!
cc w/encls:
'
G. A. Reed, Manager
l
DMB/ Document Control Desk (RIDS)
!
Resident inspector, Rill
j
John J. Duf fy, Chief Boiler
'
Inspector
Peter Anderson, Wisconsin's
'
j
Environmcatal Decade
Stanley York, Chairman
i
Public Service Commission
l
RIII
RIII
RIII
,-
l
M
M
.
K
1 t/
Streeter
Spes ' rd
i
!
t
I
l
1
.
.
-
.
.
.
.
- -
_ - _ _ -
. - - .