ML20054L571

From kanterella
Jump to navigation Jump to search
RO 82-013:notifying of Delay Until 820801 for Installation of Radiation Monitors in Release Line of Reheater Pit Sump & Oily Waste Sump.Mods Precipitated by 811002 Release of Radwaste
ML20054L571
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/11/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
RO-82-013, RO-82-13, NUDOCS 8207080256
Download: ML20054L571 (1)


Text

r-s lkQ t,

{ rpes Southem Califomia Edison Company IH? y; y g W

S AN ONOFRE NUC LE AR GENER A TING STA TION P.o. sox tas S A N C LEMEN'TE. C A LIFOR Nf A 92672 e

'd H. B. R AY YEttawoNE June 11, 1982 o m e >ro.

SrAv.oN=Aaaara U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Marla Lane, Suite 210 Wa l nut Creek, Ca l i f orn i a 92596-5368 1

Attention:

Mr. R. H. Engelken, Regional M ministrator-s I

s

Dear Sir:

, d ',i. Y '

Subject:

Docket No. 50-206 s

Licen?.ee Event Report $n. 8 b 013 San Onotre lluclear Ge,ne' rat 4n'g Station, Unit,1 i

Reforens Letter, H. Bh Ray (SCE) fo' R. H. Engel nen' (NRC),

Fourt;en Day Report Conccrning th'e gelease of

?

Liquid Radioactive Waste, dated Jure 1, 1482.

1

's m

  • N t

s y,,

(

in the reference,you'yere advised that the ihstallation cf radiation monitors in the release line of the Reheater Pit Sump anc Oily Waste

?

Sump would be finished by June 15, 1982. As a result of >ther higher priori,tL t rojects associated with the present outage, the installation l

of these;i%diation! nonitors will be completed by August 1,1982.

j~ '/

Pending the instaliation of these monitors, any effluent discharges will be analyzed at the beginning, midpoint and end of the release in accord-i

.e "

(f.?ce with Technical Speci fication 4.5.D(2).

{'w.

N j

i <'

Please cantact me if additional infornation concerning this matter is m' '

^

b required.

~'

s -

V

's Sincerely, y

N.

i.

s 4

% t[

1 e

y U.S. Nucidar Regulatory Commissihn l~

cc:

Office of Inspection.apd Enforcement 3

g

. II.S. Nuclear Regulatory Commission i N

6f)ficp of Management Information and Program Control

,ht.}^o f f uc ar' Pow'er Operations (INPO) l n

u w

+

l :.:

j

" ',. L. F.'pU l t er- (USNRC Resident inspeOror, San Onof re, Unit 1)-

l s,,,

[

@207080256 820611 4-~s PDR ADOCK 05000PO6 s. '.

g. g

}.

t m^

i

[

s

- q, FDR ;.

~ _.

w

.