Interim Deficiency Rept Re Failures of C-E Supplied Valve Position Indicating Switches,Initially Reported 820525. Bechtel Requested Assistance from C-E for Evaluation.Final Rept Expected by 820929
ML20054L222
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/18/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-21227-GHD, DER-82-26, NUDOCS 8207070281
Download: ML20054L222 (3)


Text

Docket Nos. 50-528/529/530 f

50.55(e) Report 7 glJT'

,0 f

M5kdNM i

W G W IN KC 6:vc 1$ P Yd biE[$ (Q M. M M J 8 e

v 3003 p.o. Box 21666 PHOENIX, ARIZONA 85036 STA.

June 18, 1982 ANPP-21227-CHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. T. W. Bishop, Chief Reactor Construction Projects Branch Subj ect :

Interim Report - DER 82-26 A 50.55(e) Potentially Reportable Deficiency Relating to Mounting Failures of CE-Supplied Valve Position Indicating Switches File: 82-019-026 D.4.33.2

Reference:

Telephone Conversation between T. Bishop and G. Duckworth on May 25, 1982

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached.

It is now expected that this information will be finalized by September 29, 1982, at which time a complete report will be submitted.

Very truly yours, tu d~n t E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:db Enclosure cc:

See Attached Page 2 hg o

~

nm

k&

U. S. Nucicar Regulatory Commission Attention:

Mr. T. W. Bishop, Chief ANPF -21227-CHD/BSK June 18, 1982 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C.

20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503

1,'

INTERLM REPORT - DER 82-26 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1 I.

Potential Problem During Start-up Prerequisite Testing, the Reed indicating switch clamp tackweld was found to be either broken or to break during positioning of the switch and tightening the adjustment nut.

Condi-tion causes loss and/or incorrect valve position indication in the Control Room. Total of six (6) failures have been found, some of which had a broken bracket at the time the cover was removed for the positioning operation. This item is supplied by Combustion Engineering as part of the NSSS contract.

II.

Approach To and Status Of Proposed Resolution Bechtel has requested assistance from Combustion Engineering in evaluating and dispositioning this item.

III.

Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is Forecast to be completed by September 29, 1982.