ML20054L159
| ML20054L159 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/21/1982 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, ANPP-21234-GHD, DER-81-12, NUDOCS 8207070207 | |
| Download: ML20054L159 (2) | |
Text
__.
Docket Nos. 50-528/529/530 rp 50.55(e) Report i
g 3003 STA.
P.o. Box M666 PHOENIX, ARIZONA 85036 June 21, 1982 ANPP-212 M D/B.Sl$
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. T. W. Bishop, Chief Reactor Construction Projects Branch
Subject:
Time Extension for Report - DER 81-12 A 50.55(e) Potentially Reportable Deficiency Relating l
to Mating Force of 125V DC Pull-Out Fuse Blocks Decreases After Several Insertions and Removals File: 82-019-026 i
D.4.33.2 l
Reference:
(A) Telephone conversation between J. Eckhardt and i
B. S. Kaplan on May 21, 1981 l
(B) ANPP-18237, dated June 18, 1981 (Interim Report) l (C) ANPP-19545, dated November 25, 1981 (Interim Report, l
Revision 1) l (D) ANPP-19869, dated January 11, 1982 (Interim Report, Revision 2)
(E) ANPP-20465, dated March 18, 1982 (Interim Report, Revision 3)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A),
and Interim Reports were transmitted by References (B), (C), (D), and (E).
j At that time, it was estimated that a Final Report would be available by June 30, 1982.
Due to the extensive investigation and evaluation required, it is now 1
expected that this information will be finalized by August 12, 1982, when a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, (LLL h tLL E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:db cc: See Attached Page 2 lhh 8207070207 820621 PDR ADOCK 05000528 g3 PDR Q-/7I !
J
^
U. S. Nuclear Regulatory Commission Attention:
Mr. T. W. Bishop, Chief June 21, 1982 ANPP-21234-GHD/BSK Page 2 cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen l
G. A. Fiorelli Lynne Bernabei, Esq.
Harmon & Weiss r
1725 "I" Street, NW Suite 506 Washington, D. C.
20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503
_........ _.....