ML20054K708
| ML20054K708 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 06/18/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sinclair J YANKEE ATOMIC ELECTRIC CO. |
| Shared Package | |
| ML20054K709 | List: |
| References | |
| NUDOCS 8207060080 | |
| Download: ML20054K708 (2) | |
See also: IR 05000271/1982009
Text
,
a ,
Jun 1 E 1982
Docket No. 50-271
Yankee Atomic Electric Company
ATTN:
Mr. J. B. Sinclair
Licensing Engineer
1671 Worcester Road
Framingham, Massachusetts 01701
Gentlemen:
Subject:
Inspection No. 50-271/82-09
This refers to the routine safety inspection conducted by Mr. A. E. Finkel of
this office on May 25-28, 1982 at the Vermont Yankee Nuclear Power Station,
Vernon, Vermont of activities authorized by NRC License No. DPR-28 and to the
discussions of our findings held by Mr. A. E. Finkel with Mr. W. Murphy and
other members of your staff at the conclusion of the inspect. ion.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representa-
tive records, interviews with personnel, and observations by the inspector.-
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Rocm unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
l
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1). The telephone notification of your intent to
request withholding, or any request for an extension of the 10 day period
which you believe necessary, should be made to the~ Supervisor, Files, Mail and
Records, USNRC Region I, at (215) 337-5223.
'
No reply to this letter is required. Your cooperation with us in this matter
j
is appreciated.
i
l
Sincerely,
original Signed By:
.
v[c>d
{AThomas T. Martin, Director
}
Division of Engineering and Technical
Programs
Enclosure: NRC 0,egion I Inspection Report Number 50-271/82-09
7
0FFICIAL RECORD COPY
8207060080 820618
PDR ADOCK 05000271
C
_
_
.
.
. Vermont Yankee
2
I
cc w/ encl:
Mr. Warren P. Murphy, Plant Manager
Mr. W. F. Conway, President and Chief Executive Officer
Mr. E. W. Jackson, Manager of Operations
Mr. L. H. Heider, Vice President
Public Document Room (PDR)
!
Local Public Document Room (LPOR)
Nuclear Safety Information Cer:ter (NSIC)
NRC Resident Inspector
l
State of New Hampshire
State of Vermont
i
bcc w/ encl:
j
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encls)
R. Gallo, DPRP
,
RI
F9
RI
P
I:DETP
Finkel:ss
Beqkman
Ebpeter
6/4/82
g%
[/j'[.
OFFICIAL RECORD COPY
.
. .
.
.
._
_ _-. - _ _