ML20054K703

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 81-55 Re Waterline Leak Under Auxiliary Bldg,Initially Reported on 820105.Final Rept Will Be Submitted 820930
ML20054K703
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/16/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-21204-GHD, DER-81-55, NUDOCS 8207060074
Download: ML20054K703 (2)


Text

. Docket Nos. 50-528/529/530 I 50. 55 (e) Report M WM M U D G D ILG9 V d D D u D Zff D M ] ?/

stA. 3003 p.o. Box 22666 - psotsix ARI2oNA 85036 June 16, 1982 ANPP-21204-GHD/BSK _

U. S. Nuclear Regulatory Commission .e ci Region V c.0 .' fi Creekside Oaks Office Park __.  !$

1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 i Attention: Mr. T. W. Bishop, Chief Reactor Construction and Engineering Support Branch

Subject:

Time Extension for Report - DER 81-55 A 50.55(e) Potentially Reportable Deficiency Relating to Unit 3 Water Line Leak Under Auxiliary Building File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between Bob Dodds and G. Duckworth on January 5, 1982 (B) ANPP-20080, dated February 3, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A) and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by June 29, 1982.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 30, 1982, when a conplete report will be submitted.

There is no new information or change to the Interim Report at this time. .

Very truly yours, hh ddf E. E. Van Brunt, Jr.

APS Vice President F207060074 820616 Nuclear Projects PDR ADOCK 05000530 ANPP Project Director S PDR EEVBJr/GHD:db cc: See Attached Page 2 Ig 9 7 - l(O b

U. S. Nuclear Rigulctory Commicsion Attention: Mr. T. W. Bichop, Chief June 16, 1982 ANPP-21204-GHD/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Consnission Washington, D. C. 20555 J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan U. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 I

I

, - , . . - ,-. _ -. - - - - - , , . - . , . - , , _ _ , - - , , _ , - - - - - - - . _ _ . - - - , , , , . - . _ _ - -