Interim Deficiency Rept Re Welding Techniques Not Covered by Brown-Boveri Electric,Inc QA Program Used in Fabrication of safety-related Switchgear,Initially Reported 820525.Stop Work Order Issued.Next Rept Will Be Submitted by 821029
ML20054K536
Person / Time
Site: Marble Hill
Issue date: 06/24/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 582-12, SVP-0008-82, SVP-8-82, NUDOCS 8207020293
Download: ML20054K536 (2)


Text

_ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _

I PUBLIC

' SERVICE INDIANA S. W. Shields June 24, 1982 senmr vke Pr.niden: - S82-12 Nudew r Demion SVP-0008-82 Mr. James G. Keppler Regional Administrator Docket Nos.: STN 50-546 1 U.S. Nuclear Regulatory Commission STN 50-547

, j. Region III Construction Permit Nos.:

799 Roosevelt Road CPPR - 170

- Glen Ellyn, Illinois 60137 CPPR - 171

,4 Marble Hill Nuclear Generating Station - Units 1 & 2

Dear Mr. Keppler:

On May 25, 1982, Mr. S. J. Brewer of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(c). During an audit at Brown-Boveri Electric, Inc. (BBC) facilities PSI quality assurance personnel dis-covered that welding techniques not covered by BBC's quality assurance program were being used in the fabrication of safety related switchgear.

Such activities are special processes and should have been controlled by procedure as required by 10 CFR 50, Appendix B, Criterion IX. It was also discovered that no controls were placed on the terminal lug crimping process. Finally, BBC could not present certification for its circuit breaker wiring. With these deficiencies it is possible that installed equipment could differ from that ussd for IEEE 323/344 qualification.

~

PSI has issued a stop work order on BBC facilities until this problem l

is resolved. BBC has also been directed to respond to a Corrective Action Request which requires them to address the cause of the problem, correct-ive action, and quality of items affected prior to discovery of the prob-lem.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e). A further report on this item will be filed on or before October 29, 1982. If you have any questions on this report, please feel free to contact me.

Sincerely, 8207020293 820624

' ~

46 M PDR ALOCK 05000546 . W. Shields S<

.1

5

/*

PUBUC SERVICE INDIANA James G. Keppler June 24, 1982 cc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. J. Harrison