ML20054K247

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/82-26 on 820406-09 & Notice of Violation
ML20054K247
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/27/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20054K236 List:
References
NUDOCS 8207010332
Download: ML20054K247 (2)


See also: IR 05000416/1982026

Text

.

,

.

-

.- ) pt.)

APR 2 71982

Mississippi Power and Light Company

ATTN: Mr. N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

Subject: Report No. 50-416/82-26

This refers to the routine safety inspection conducted by Mr. W. P. Ang of this

office on April 6-9, 1982, of activities authorized by NRC Construction Permit

No. CPPR-118 for the Grand Gulf facility. Our preliminary findings were dis-

cussed with Mr. G. B. Rogers, of your staff, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with-

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written applica-

tion to withhold information contained therein within thirty days of the date of

this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

^

8207010332 820615

PDR ADOCK 05000416

O PDR

_ - _ _ _ _ _ _ _

(

. . .

Mississippi Power and 2

Light Company APR 2 71982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report No. 50-416/82-26

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

l

l

RII RI p RII Rf,

wit- 1

WPAng:aw ARHerdt R tcher pl FLong

!

04/N82 04N)/82 04/Lrl'82

'

04g/82

!

L