.4 JUN 241982 Docket No. 50-312 License No. OPR-54 EA 82-50 Sacramento Municipal Utility District ATTN: Mr. John J. Mattimoe Assistant General Manager and Chief Engineer P. O. Box 15830 Sacramento, California 95813 Gentlemen:
This refers to the special inspection conducted by Messrs H. Canter and J.
O'Brien of this office on February 11 through April 28, 1982, of circumstances associated with the inoperability of an energency diesel generator and a high pressure injection (llPI) pump at the Rancho Seco plant in February and March 19S2.
The results of the inspection were discussed by Mr. Canter with Mr. Rodriguez and other members of your staff on flarch 10, 1982. The results were also discussed at an enforcement conference on April 21, 1982, with you and other members of your staff. We are concerned that your management control system pennitted inoperable safety-related equipment to be returned to service due to inadequate implementation of safety-related procedures.
In addition, proper implementation of your routine shift surveillance practices should have detected these conditions during the first shift following the return of the safety-related equipment to service. As you are aware, these deficiencies led to a llPI limiting condition for operation (LCO) being violated on March 1,1982, and the diesel generator LC0 being violated on February 11, 1982.
The significance of these violations is increased due to their repetitive nature. Specifically, Licensee Event Report (LER) 79-11, dated September 13, 1979, described the six-day inoperability of Reactor Building Emergency Cooling Unit A-500C. This event was the result of a mispositioned toggle switch for a circuit breaker charging spring motor. Additionally, escalated enforcement was taken when the NRC issued a civil penalty and orver because safety-related equipment (high prassure injection pump) was not properly returned to service following maintenance. floreover, LER 81-33, dated July 3,1981 concerned an inoperable diesel due to unwareness of the status of the fault flags which is similar to Item 1 of the Appendix. Your corrective actions for these events have not been sufficient to ensure that the importance of knowing the status of 8207010325 820624 DR ADOCK 05000
[]
t'rDTfffrh MAff omce >
NYifRN[RECl[IPTRE00ESTED I
...... h.
6/23/
o4n p 6/' /82
...... /./82
{ NRC FORM 3.8 tlO< t401 NRCM O240 OFFICIAL RECORD COPY
' " * -32"2';
JUN 2 41982 eWW mmr eMiM1 ment is understood by licensed personnel. Operation of the ao afety-related equipment in an improper configuration was due to sm a e of both licensed and non-licensed personnel.
Wre Ath the Director of the Office of Inspection and Enforce-a;s**=rwthorized to issue the enclosed flotice of Violation and
.rww of Civil Penalties in the cumulative amount of $120,000 as
-nw Pedix to this letter. This action is being taken in order
~=wn 9xt:ance of taking effective corrective actions in response Wam"de:cies in plant safety systems and of ensuring that the
.-rrew :' the configuration of safety-related equipment.
m
.m -=scond to the Appendix.
In preparing your response.
.mcMm _.e instructions specified in the Appendix.
In addition.
m
- Oa faclude your specific corrective actions and implementa-
- rees a (1) clarification of your control of the operabla status remmiment, (2) steps taken to ensure that dual verification N s April 10, 1980 order is sufficient to ensure operability
~wwminnent, (3) action planned or taken to assure that auxi-Mes and responsibilities are clearly defined, that the smm om_.ww dataly trained in their duties, and (4) actions planned or a ifcensed operators follow procedures for trouble annun-
~7;u 7.=mr rr dam annunciators. Your written reply to this letter and wxfrm.ee usis for detemining whether additional enforcement m =- w c.2c.
-%a-cry 3 by this letter and accompanying Notice are not subject
,--em-m miures of the Office of Management and Budget as required 7%m.m Zecuc:1on Act of 1980, PL 96-511.
s2m:- ;U CR 2.790 of the flRC's " Rules of Practice," Part 2, c,. ~ u+ racaral Regulations, a copy of this letter and the enclosure m e t-ce NFC's Public Document Room.
Sincerely, JUN 241982 WiinIY'dB tr R. IL Dgeliien R. H. Engelken Regional Administrator w:
me W Violation and c.we mattien of Civil Penalties a-QMlkMW
_ ???%4Q N)
%mmys ?*CQ
d I
[
l l
L Sacramento Municpal Utility District Distribution
~DR i
r l
NSIC LPDR ACRS SECY CA RCDeYoung, IE JHSnfezek, IE JLiebeman, IE VStello,DED/ROGR FIngram, PA JMurray, ELD KCyr, ELD HDenton, NRR REngelken, RV Directors ES RI, RII, RIII, RIV, RV JCumings OIA IE:EA File IE File (TERA), /
IE:ES File v
APuglise, RM JCraig, IE MPadovan NRR Resident Inspector, Rancho Seco RVDistribution George Deukmejian, Attorney General John E. Bryson, Pres.
Public Utilities Comm.
California Dept of Health Services
.. =,