ML20054K228
| ML20054K228 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/29/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20054K225 | List: |
| References | |
| NUDOCS 8207010315 | |
| Download: ML20054K228 (2) | |
See also: IR 05000259/1982010
Text
r
j/s//ce;)
-
.
.
w
APR 29 1982
Tennessee Valley Authority
ATTN:
Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject:
Report Nos. 50-259/82-10, 50-260/82-10 and 50-296/82-10
This refers to the routine safety inspection conducted by Mr. P. E. Fredrickson
of this office on March 22-26 and 29-31,1982, of activities authorized by NRC
Operating License Nos. DPR-33, DPR-52, DPR-68 for the Browns Ferry facility. Our
preliminary findings were discussed with Mr. G. T. Jones, Plant Superintendent,
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days'of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
f'207010315 820623
PDR ADOCK 05000259
0
(
.
.
.
-
.
R 29 7932
Tennessee Valley Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 1
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-259/82-10,
50-260/82-10 and 50-296/82-10
cc w/ enc 1:
H. J. Green, Director o' Nuclear Power
G. T. Jones, Plant Superintendent
R. E. Rogers, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
bcc w/ encl:
Document Management Branch
State of Alabama
NRC Resident Inspector
l
[
[
R
I
RI
RII
R
redricks n:es
CMUpright
ARHerdt
RC tcher
FJLo
/g82
4gM2
4 4]/82
4
82
4F/82
l
!