ML20054J724

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-213/82-09 on 820503-07.No Noncompliance Noted
ML20054J724
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/08/1982
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20054J725 List:
References
NUDOCS 8206290493
Download: ML20054J724 (2)


See also: IR 05000213/1982009

Text

,

. _ - - - - - - - - - - - - - - - - - - - - - _ _ - - - - - - _ - - - - - - - - - - - - - - - - -

---

..

..

8 JUN 1982

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN:

Mr. W. G. Counsil

,

Senior Vice President - Nuclear

'

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 82-09

This refers to the routine inspection coriducted by Dr. J. C. Jang of this

office on May 3-7, 1982 at the Haddam Neck Plant, Haddam, Connecticut of

activities authnrized by NRC License No. OPR-61 and to the discussions of our

findings held by Dr.Jang with Mr. R. H. Graves and others of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of telective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

In addition, our Mobile Laboratory was also brought to your site and used by

the inspector to make certain independent measurements. The basic purpose of

these independent measurements is to verify your capability for analyzing

radioactive effluents, and to achieve and maintain comparable methods of

analyses between your facility and the NRC. The complete data from these

measurements will be reported in a subsequent Inspection Report.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1). The t.elephone notification of your intent to

request withholding, or any request for an extension of the 10 day period

which you believe necessary, should be made to the Supervisor, Files, Mail and

Records, USNRC Region I, at (215) 337-5223.

OFFICIAL RECORD COPY

c

8206290493 820608

b

,{DRADOCK 05000213

PDR

- - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - - - -

c

.

.

Connecticut Yankee Atomic Power Company 2

, 8 JUN 1982

l

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Qriginal Signed By:

George H. Smith, Director

Division of Emergency Preparedness

and Operational Support

Enclosure:

NRC Region I Inspection Report No. 50-213/82-09

cc w/ enc 1:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

J. F. Opeka, Vice President, Nuclear Operations

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

'

RI:DEPOS

OS

RI:DEPOS

i

POS

f:0EPOS

Jang:hh

Kottan

Bor s

3nyder

.mith

p?

b'

l0FFICIAL RECORD COPY

l%

6/4/82

(2