Forwards IE Insp Repts 50-245/82-09 & 50-336/82-02 on 820426-29.No Noncompliance Noted
ML20054J474
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/14/1982
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20054J475 List:
References
NUDOCS 8206290065
Download: ML20054J474 (2)


See also: IR 05000245/1982009

Text

.

.-

.

14 JUN 1982

Docket No.

50-245

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Combined Inspection No. 50-245/82-09 and 50-336/82-02

This refers to the routine inspection conducted by Mr. J. J. Kottan of this

office on April 26-29, 1982 at Millstone Nuclear Power Station, Units 1 and 2,

Waterford, Connecticut of activities authorized by NRC License Nos. OPR-21 and

DPR-65 and to the discussions of our findings held by Mr. Kottan with Mr. E.

C. Farrell and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspector.

In addition, our Mobile Laboratory was also brought to your site and used by

the inspector to make certain independent measurements. The basic purpose of

these independent measurements is to verify your capability for analyzing

radioactive effluents, and to achieve and maintain comparable methods of

analyses between your facility and the NRC. The complete data from these

measurements will be reported in a subsequent Inspection Report.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed 'n the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1). The telephone notification of your intent to request withholding,

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

.

0FFICIAL RECORD COPY

s206290065 820614

PDR ADDCK 05000245

c3

PM

_ _.

.

.

.

Northeast Nuclear Energy Company

2

14 JUN 1982

.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Signed By:

George H. Smith, Director,

Division of Emergency Preparedness and

Operational Support

Enclosure:

Combined NRC Region I Inspection Report Number

50-245/82-09 and 50-336/82-02

cc w/ encl:

J. F. Opeka, Vice President, Nuclear Operations

E. J. Mroczka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

.

Public Document Room (PDR)

Local Public Document Room (LPDR)

'

Nuclear Safety Information Center (NSIC)

State of Connecticut

NRC Resident Inspectur

i

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

.

l

l

I

t

R DE OS

NR

OS

_

gwc

Bores

Snyd r

it

,

hl'f

l

S/9/82

s/l /W

p ff g;t._ _0FF CIAL RECORD COPY

'

, ,

r

,,-vg-

-

. - , . .-. - - - , - - , . ,

r,--r..

--

-e

- -,

-,-,.. - - - - - -

--- --