Text
F
$N1 0 Docket No. 99900509/82-01 Stone and Webster Engineering Corporation ATTN:
R. B. Kelly, Vice President Quality Assurance Post Office Box 2325 Boston, MA 02107 Gentlemen:
This refers to the inspection conducted by Mr. D. D. Chamberlain of this office on March 8-12 and March 22-26, 1982, of your facilities at Boston, Massachusetts, and Cherry Hill, New Jersey, and to the discussion of our findings with Stone & Webster management and members of your staff at the conclusion of the inspection.
Areas examined during this inspection and our findings are discussed in the enclosed report.
Within these areas, the inspection consisted of an examina-tion of procedures and representative records, interviews with personnel, and observations by the inspector.
This inspection included inspection of three action items conducted as a result of regional requests for follow up.
During this inspection it was found that you failed to meet certain NRC requirements.
The specific findings and references to the pertinent require-ments are identified in the enclosures to this letter.
Please provide us within 30 days from the date of this letter a written statement containing, (1) a description of steps that have,been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed.
Consideration may be given to extending your response time for good cause shown.
The response requested by this letter is not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this offce by telephone within 10 days from the date of RIV
, -g.OR CI:RS SC:RSSh BC:VPB 0:IES R-DDCham ain/rf CJHale UPotap s EHJohnson J C lins
}
5/18/82
[5Y 7/82 8/t0/82 5/ /82 5/
82
}Q))
8206280555 820610 PDR GA999 EECSWE 99900509 PDR
r Stone and Webster Engineering 2
Corporation this letter of your intention to file a request for withholding; and (b) sub-mit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established.
Con-sistent with section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incor-porated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specifiea periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Uldis Potapovs, Chief Vendor Programs Branch
Enclosures:
1.
Appendix A - Notice of Nonconformance 2.
Appendix B - Inspection Report No. 99900509/82-01 3.
Appendix C - Inspection Data Sheets (21 pages)
r 9
Stone and Webster Engineering 3
Corporation bec:
IE Flies AEOD QAB NRC:PDR Reg. Administrators, I, II, III, IV, V EHJohnson, RIV
Stone and Webster Engineering 3
Corporation bec:
IE Files AE00 QAB NRC:POR Reg. Administrators, I, II, III, IV, V EHJohnson, RIV
,